Attach # 4 Insurance.pdf
PDF 181 KB Posted
- Attached to
- Cartagena Containers Federal contract opportunity
- Solicitation number
- 19AQMM19R0336
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q& A 19R0336.pdf | ||
| Attach # 5 Sub_ reg Rev 1.pdf | ||
| 19AQMM19R0336 B-M (Changes).pdf | ||
| 19AQMM19R0336 -A0001.pdf | ||
| Attach #1 CTG Containers Specifications Rev 1.pdf | ||
| Attach # 2 CTG Containers Drawings Rev 1.pdf | ||
| 19AQMM19R0336 B-M (A0001).pdf | ||
| Attach #10 SAM Reg.pdf | ||
| Attach # 1 Specification.pdf | ||
| Attach # 2 Drawings.pdf | ||
| Attach #8 Incident Report.docx | DOCX document | |
| 19AQMM19R0336 B-M.pdf | ||
| Synopsis.pdf | ||
| SF-1442.pdf | ||
| Attach #5 Sub-Reg..pdf | ||
| Attach #9 Mat& Prod Sub Req.doc | DOC document | |
| Attach #7 PPQ.docx | DOCX document | |
| Attach # 3 Bid_Chart.xlsx | XLSX spreadsheet |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 4 ‐ INSURANCE FOR CONSTRUCTION CONTRACTS
Performance Policy (Póliza de Cumplimiento): Submitted after the contractor is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract and valid for the duration of the contract and a further two months, Payment Policy (Póliza de Pago de Salarios y Prestaciones Sociales): Submitted after the contract is signed and prior to the notice to proceed in a sum equal to 20% of the value of the contract, and valid for the duration of the contract and a further three years for the salaries and social benefits of the workers.
Liability Policy ( Póliza de Responsabilidad Civil Contractual): submitted after the contract is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract, and valid for the duration of the contract and a further two months covering contractual and Third Party Civil Liability, Stability Policy (Póliza de Estabilidad): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for three years from the date of the handover of the work/ substantial completion.
Elements Quality Policy ( Póliza de Calidad de Elementos): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion.
Correct Equipment Functioning Policy (Póliza de correcto funcionamiento de los equipos): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion
File details come from the government source that posted it. Updated .