| OFFICIAL BIDDING CHART | | |
| PROJECT: | CONTAINERS |
| Place: | Batallon de Fuerzas Especiales, Cartagena , Bolivar - Colombia |
| Solicitation: | |
| Date: | 14-Jul-19 |
| ITEM | DESCRIPTION | MATERIAL UNIT | MATERIAL QUANTITY | MATERIAL UNIT COST | LABOR UNIT | LABOR QUANTITY | LABOR UNIT COST | EQUIPMENT UNIT | EQUIPMENT QUANTITY | EQUIPMENT UNIT COST | TOTAL COST | TOTAL COST BY CHAPTER |
| A. GENERAL REQUIREMENTS | | | | | | | | | | | | $ 0.00 |
| 1 | GENERAL REQUIREMENTS | | | | | | | | | | | $ 0.00 |
| 01 32 16 00 20 | Construction Progress Documentation | | | | | | | | | | | $ 0.00 |
| | $ 0.00 | |
| 01 33 00 | Submittal Procedures | | $ 0.00 |
| | $ 0.00 | |
| 01 50 00 | Temporary constructions, facilities and controls | | $ 0.00 |
| | $ 0.00 | |
| 01 78 00 | Execution and Closeout Submittals | | $ 0.00 |
| | $ 0.00 | |
| B. CONTAINERS | | | $ 0.00 |
| 3 | CONCRETE | | $ 0.00 |
| 03 11 13.00 10 | Stuctural Cast in place Concrete Forming | | $ 0.00 |
| | $ 0.00 | |
| 03 20 00.00 10 | Concrete Reinforcing | | $ 0.00 |
| | $ 0.00 | |
| 03 30 00 | Cast-in-Place Concrete | | $ 0.00 |
| | $ 0.00 | |
| 5 | METALS | | $ 0.00 |
| 05 12 00 | Structural Steel | | $ 0.00 |
| | $ 0.00 | |
| 05 50 13 | Metal: Miscellaneous and Fabrications (Containers) | | $ 0.00 |
| | $ 0.00 | |
| 05 51 10 | Metal Stairs | | $ 0.00 |
| | $ 0.00 | |
| 7 | THERMAL AND MOISTURE PROTECTION | | $ 0.00 |
| 07 21 00 | Building Insulation | | $ 0.00 |
| | $ 0.00 | |
| 07 41 63 | Fabricated Roof Panel Assemblies | | $ 0.00 |
| | $ 0.00 | |
| 07 44 56 | Fiber Reinforced Cementitious Panels | | $ 0.00 |
| | $ 0.00 | |
| 07 92 00 | Joint Sealants | | $ 0.00 |
| | $ 0.00 | |
| 8 | OPENINGS | | $ 0.00 |
| 08 11 13 | Steel Doors and Frames | | $ 0.00 |
| | $ 0.00 | |
| 08 51 13 | Aluminum Windows | | $ 0.00 |
| | $ 0.00 | |
| 08 71 00 | Door Hardware | | $ 0.00 |
| | $ 0.00 | |
| 08 81 00 | Glazing | | $ 0.00 |
| | $ 0.00 | |
| 08 27 23.13 | Safety Films | | $ 0.00 |
| | $ 0.00 | |
| 9 | FINISHES | | $ 0.00 |
| 09 06 90 | Color Schedule | | $ 0.00 |
| | $ 0.00 | |
| 09 23 00 | Gypsum Plastering | | $ 0.00 |
| | $ 0.00 | |
| 09 30 10 | Ceramic, Quarry and Glass Tiling | | $ 0.00 |
| | $ 0.00 | |
| 09 65 00 | Resilient flooring | | $ 0.00 |
| | $ 0.00 | |
| 09 90 00 | Paints and Coatings | | $ 0.00 |
| | $ 0.00 | |
| 09 96 00 | High-Performance Coating | | $ 0.00 |
| | $ 0.00 | |
| 10 | SPECIALTIES | | $ 0.00 |
| 10 14 00.20 | Interior Signage | | $ 0.00 |
| | $ 0.00 | |
| 10 21 13 | Toilet Compartments and accessories | | $ 0.00 |
| | $ 0.00 | |
| 10 44 16 | Fire Extinguishers | | $ 0.00 |
| | $ 0.00 | |
| 12 | FURNISHINGS | | $ 0.00 |
| 12 32 00 | Manufactured Wood Casework | | $ 0.00 |
| | $ 0.00 | |
| 13 | SPECIAL CONSTRUCTION | | $ 0.00 |
| 13 34 19 | Special Building Systems | | $ 0.00 |
| | $ 0.00 | |
| 22 | PLUMBING | | $ 0.00 |
| 22 00 00 | Plumbing General Purpose | | $ 0.00 |
| | $ 0.00 | |
| 23 | HEATING, VENTILATING, AND AIR CONDITIONING | | $ 0.00 |
| 23 03 00.00 20 | BASIC MECHANICAL MATERIALS AND METHODS | | $ 0.00 |
| | $ 0.00 | |
| 23 05 48.00 40 | VIBRATION AND SEISMIC CONTROL FOR HVAC PIPING AND EQUIPMENT | | $ 0.00 |
| | $ 0.00 | |
| 23 07 00 | THERMAL INSULATION FOR MECHANICAL SYSTEMS | | $ 0.00 |
| | $ 0.00 | |
| 23 23 00 | REFRIGERANT PIPING | | $ 0.00 |
| | $ 0.00 | |
| 23 34 23.00 40 | HVAC POWER VENTILATORS | | $ 0.00 |
| | $ 0.00 | |
| 23 81 00.00 20 | UNITARY AIR CONDITIONING EQUIPMENT | | $ 0.00 |
| | $ 0.00 | |
| 26 | ELECTRICAL | | $ 0.00 |
| 26 00 00.00 20 | Basic Electrical Materials and Methods | | $ 0.00 |
| | $ 0.00 | |
| 26 05 00.00 40 | Common Work Results for Electrical | | $ 0.00 |
| | $ 0.00 | |
| 26 05 13.00 40 | Medium-Voltage Cables | | $ 0.00 |
| | $ 0.00 | |
| 26 05 19.00 10 | Insulated wire and cable | | $ 0.00 |
| | $ 0.00 | |
| 26 05 71.00 40 | Low voltage overcurrent protective devices | | $ 0.00 |
| | $ 0.00 | |
| 26 08 00 | Apparatus Inspection and Testing | | $ 0.00 |
| | $ 0.00 | |
| 26 09 13 | Power Monitoring System | | $ 0.00 |
| | $ 0.00 | |
| 26 09 23.00 40 | Lighting Control Devices | | $ 0.00 |
| | $ 0.00 | |
| 26 11 14 00 10 | Secondary Unit Substation | | $ 0.00 |
| | $ 0.00 | |
| 26 20 00 | Interior Distribution System | | $ 0.00 |
| | $ 0.00 | |
| 26 24 16.00 40 | Panelboards | | $ 0.00 |
| | $ 0.00 | |
| 26 28 01.00 10 | Coordinated Power System Protection | | $ 0.00 |
| | $ 0.00 | |
| 26 28 21.00 40 | Automatic Transfer Switches | | $ 0.00 |
| | $ 0.00 | |
| 26 33 53.00 20 | Uninterruptible Power Supply UPS | | $ 0.00 |
| | $ 0.00 | |
| 26 41 00.00 40 | Lightning Protection System | | $ 0.00 |
| | $ 0.00 | |
| 26 51 00 | Lighting | | $ 0.00 |
| | $ 0.00 | |
| 27 | COMMUNICATIONS | | $ 0.00 |
| 31 00 00 | Building Communications Cabling System | | $ 0.00 |
| | $ 0.00 | |
| 31 | EARTHWORK | | $ 0.00 |
| 31 00 00 | Earthwork | | $ 0.00 |
| | $ 0.00 | |
| 31 11 00 | Clearing and Grubbing | | $ 0.00 |
| | $ 0.00 | |
| 31 23 00.00 20 | Excavation and Fill | | $ 0.00 |
| | $ 0.00 | |
| 32 | Exterior Improments | | $ 0.00 |
| 32 16 13 | Concrete sidewalks and curbs and gutters | | $ 0.00 |
| | $ 0.00 | |
| 32 92 23 | Sodding | | $ 0.00 |
| | $ 0.00 | |
| 33 | UTILITIES | $ 0.00 |
| 33 11 00 | Water Distribution | $ 0.00 |
| | $ 0.00 | |
| 33 30 00 | Sanitary Sewers | | $ 0.00 |
| | $ 0.00 | |
| 33 71 02 | Underground electrical and telecomunications distribution | | $ 0.00 |
| | | $ 0.00 | |
| D. MARKUPS | | | | $ 0.00 |
| D | TOTAL DIRECT COST | | | $ 0.00 |
| D | Administration | % | | $ 0.00 |
| D | Profit | % | | $ 0.00 |
| D | DBA Insurance | Unit | | $ 0.00 |
| TOTAL COSTS (Base bid) $ | | | $ 0.00 |