Attach #5 Sub-Reg..pdf

PDF 241 KB Posted

Attached to
Cartagena Containers Federal contract opportunity
Solicitation number
19AQMM19R0336
Issued by
Department of State Office of Acquisition Management

View the file

Other files for this federal contract opportunity

Other files attached to Cartagena Containers, newest first.
File Type Posted
Q& A 19R0336.pdf PDF
Attach # 5 Sub_ reg Rev 1.pdf PDF
19AQMM19R0336 B-M (Changes).pdf PDF
19AQMM19R0336 -A0001.pdf PDF
Attach #1 CTG Containers Specifications Rev 1.pdf PDF
Attach # 2 CTG Containers Drawings Rev 1.pdf PDF
19AQMM19R0336 B-M (A0001).pdf PDF
Attach #10 SAM Reg.pdf PDF
Attach # 1 Specification.pdf PDF
Attach # 4 Insurance.pdf PDF
Attach # 2 Drawings.pdf PDF
Attach #8 Incident Report.docx DOCX document
19AQMM19R0336 B-M.pdf PDF
Synopsis.pdf PDF
SF-1442.pdf PDF
Attach #9 Mat& Prod Sub Req.doc DOC document
Attach #7 PPQ.docx DOCX document
Attach # 3 Bid_Chart.xlsx XLSX spreadsheet
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 32 PAGES

CONTAINERS CARTAGENA

01 32 16.00 20 SD-01 Preconstruction Submittals 1.2Construction schedule

Submittal Register 01 33 00 SD-01 Preconstruction Submittals

1.6Submittal Register 01 50 00 SD-01 Preconstruction Submittals

1.3Construction site plan 01 78 00 SD-03 Product Data

As-Built Record of Equipment and Materials

1.6.1Warranty Management Plan 1.6.4Warranty Tags

Spare Parts Data SD-08 Manufacturer’s Instructions

1.5Preventative Maintenance 1.5Condition Monitoring (Predictive

Testing) 1.5Inspection 1.6.1Instructions

SD-10 Operation and Maintenance Data

1.7Operation and Maintenance Manuals

SD-11 Closeout Submittals 1.4.1Record Drawings

03 11 13.00 10 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 32 PAGES

03 11 13.00 10 3.1.1 GFormwork SD-03 Product Data

1.2Design 2.1Form Materials 2.1.6Form Releasing Agents

SD-04 Samples

1.4 GSample Panels

SD-06 Test Reports 3.5Inspection

3.4.1 GFormwork Not Supporting Weight

of Concrete SD-07 Certificates Fiber Voids

03 20 00.00 10 SD-02 Shop Drawings 3.1Reinforcement

SD-03 Product Data 1.3.1Welding

SD-04 Samples Reinforcement Bars

SD-07 Certificates 2.3Reinforcing Steel

03 30 00 SD-02 Shop Drawings 1.6.2.1Fabrication Drawings 1.6.2.2Formwork 1.6.2.2Formwork 1.6.2.1Special Construction

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 32 PAGES

03 30 00 1.6.2.3 GReinforcing steel SD-03 Product Data

2.4.7Materials for curing concrete 2.4.9Joint sealants 2.4.8Joint filler 2.4.1Cement 2.4.1.1Portland Cement 2.3.2Ready-Mix Concrete 2.4.6Vapor barrier 2.6Bonding Materials 2.3.3Concrete Curing Materials 2.5Reinforcement 1.6.2.1Reinforcement Materials 2.4.10Epoxy bonding compound 2.4.9.3Waterstops 3.13.2Waterstops 2.1.1Wood Forms 2.4.11Biodegradable Form Release

Agent SD-04 Samples

1.6.5.1Slab finish sample 2.4.9.3Dumbbell Type 2.4.9.3Rubber 2.4.9.3Polyvinylchloride (PVC)

SD-05 Design Data

2.3.1 Gmix design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 32 PAGES

03 30 00 1.6.1.1Calculations SD-06 Test Reports

1.6.4.1 GConcrete mix design

1.6.4.2Aggregates 3.9.2.1Tolerance report 3.11.2.3Compressive strength tests 2.8.4Slump 2.8.1Air Entrainment

SD-07 Certificates 1.6.3.1Curing concrete elements 1.6.3.3Finishing plan 1.6.3.6Material Safety Data Sheets 2.5.5Steel Bar

05 12 00 SD-02 Shop Drawings 1.5.2.1Erection Plan 1.5.1Fabrication drawings

SD-03 Product Data 2.4Shop primer 2.3.1Welding electrodes and rods 2.2.5Load indicator washers

SD-06 Test Reports 2.4Class B coating 2.2Bolts, nuts, and washers

SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 32 PAGES

05 12 00 1.5.2.2Welding procedures and qualifications

05 50 13 SD-02 Shop Drawings 2.6structural steel door frames 2.3Access doors and panels 2.4Cover plates and frames

SD-03 Product Data 2.3Access doors and panels 2.4Cover plates and frames

Control-joint covers Floor gratings and roof walkways

2.6Structural steel door frames 05 51 00 SD-02 Shop Drawings

2.1 GIron and Steel Hardware

2.1 GSteel Shapes, Plates, Bars and

Strips

2.12 GMetal Stair System

SD-03 Product Data

2.2 GStructural Steel Plates, Shapes, and Bars

2.3 GStructural Steel Tubing

2.5 GHot-Rolled Carbon Steel Sheets

and Strips

2.13 GProtective Coating

GSteel Tread Stairs SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 32 PAGES

05 51 00 1.3 GWelding Procedures

1.3 GWelder Qualification

SD-08 Manufacturer’s Instructions

2.2 GStructural Steel Plates, Shapes, and Bars

2.3 GStructural Steel Tubing

2.8 GGray Iron Castings

2.9 GMalleable Iron Castings

2.13 GProtective Coating

07 21 00 SD-03 Product Data Product Data Manufacturers Storage and Installation Instrucctions

SD-11 Closeout Submittals Warranty

07 41 63 SD-01 Preconstruction Submittals 1.5.1Qualification of Manufacturer 1.5.3Qualification of Manufacturer 1.5.1Qualification of Installer

SD-02 Shop Drawings 1.5.1Roofing Panels 1.5.1Flashing and Accessories 1.5.1Gutter/Downspout Assembly

SD-03 Product Data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 32 PAGES

07 41 63 1.5.1Closure Materials 1.5.1Pressure Sensitive Tape 1.5.1Sealants and Caulking 1.5.1Galvanizing Repair Paint 1.5.1Aluminized Steel Repair Paint 1.5.1Accessories

SD-04 Samples 1.5.1Roofing Panels 2.2.2Fasteners 2.4.1Metal Closure Strips 1.5.1Manufacturer s color charts and chips SD-05 Design Data

1.5.1Wind design analysis SD-07 Certificates

2.2.2Fasteners 1.5.1Enamel Repair Paint

SD-08 Manufacturer’s Instructions 1.5.1Installation of Roof panel assemblies SD-11 Closeout Submittals

1.8Warranty 1.5.1Instructions 1.5.1Material Safety Data Sheets

07 44 56 SD-03 Product Data Cementitious Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 32 PAGES

07 44 56 Accessories SD-08 Manufacturer’s Instructions Manufacturers Instructions

SD-10 Operation and Maintenance Data Manufacturer maintenance instructions

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

08 11 13 SD-03 Product Data Doors

2.1Doors Frames

2.4Frames 2.3Accessories 2.5Weatherstripping

SD-04 Samples Finishes and painting must comply with Finishes on Section

08 51 13 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 32 PAGES

08 51 13 2.2Windows 2.3.8.1Hardware 2.3.3Fasteners 1.9Window Performance 2.5Mullions 2.3.10Screens 2.3.2Weatherstripping 2.3.8Accessories 2.3.4Adhesives

SD-04 Samples 1.3.1.1Finish Sample 1.3.1.2Window Sample

SD-10 Operation and Maintenance Data

2.2Windows 08 71 00 SD-03 Product Data

2.1Hardware Items SD-08 Manufacturer’s Instructions

3.1Installation SD-11 Closeout Submittals

1.3.1Key Bitting 08 81 00 SD-03 Product Data

Glass SD-04 Samples

2.4.2Glazing Compound 2.4.5Tape

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 32 PAGES

08 81 00 2.4.3.1Sealant SD-07 Certificates Plastic/Acrylic Glazing.

SD-08 Manufacturer’s Instructions 2.4Setting and Sealing Materials 3.2Glass Setting

08 87 23.13 SD-03 Product Data 2.2Silver reflective Fragment

Retention Film 3.3Cleaning

SD-04 Samples 2.2Silver reflective fragment

Retention Film 09 06 90 SD-04 Samples

2.2Color Schedule 09 23 00 SD-03 Product Data

Data Sheet SD-08 Manufacturer’s Instructions

2.7Ready-mix gypsum plaster 09 30 10 SD-02 Shop Drawings

3.2Detail Drawings SD-03 Product Data

2.1 GTile

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 32 PAGES

09 30 10 2.1 GTile

2.1 GAccessories

2.1.2 GAccessories

2.1 GTransition Strips

2.5 GTransition Strips

2.4 GGrout

SD-07 Certificates 2.1Tile 2.4Mortar, Grout, and Adhesive

SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions

SD-10 Operation and Maintenance Data

3.2 GInstallation

SD-11 Closeout Submittals LEED Documentation

2.4Adhesives 09 65 00 SD-03 Product Data

2.6Resilient Flooring and Accessories

2.2Adhesives SD-08 Manufacturer’s Instructions

3.2Surface Preparation 3.1Installation

09 90 00 SD-02 Shop Drawings 3.11Piping identification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 32 PAGES

09 90 00 3.11stencil SD-03 Product Data Certification

2.1Coating 2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.9Color 1.4.2Textured Wall Coating System 1.4.3Sample Textured Wall Coating

System Mock-Up SD-07 Certificates Applicator's qualifications Qualification Testing

SD-08 Manufacturer’s Instructions Application instructions

3.7.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1Coatings:

09 96 00 SD-01 Preconstruction Submittals

1.3Material, Equipment and Fixture List

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 32 PAGES

09 96 00 Heat-Resistant Coatings 2.1Epoxy Coatings 2.2Polyurethane Coatings

Chlorinated-Rubber Coatings SD-04 Samples

1.3Color Chips SD-07 Certificates

2.1Epoxy Coatings 2.2Polyurethane Coatings

10 14 00.20 SD-02 Shop Drawings Detail Drawings

SD-03 Product Data 3.1Installation

SD-04 Samples Interior Signage

SD-10 Operation and Maintenance Data

3.1Approved Manufacturer's Instructions

3.1.2Protection and Cleaning 10 21 13 SD-03 Product Data

2.1Cleaning and Maintenance Instructions

2.8Colors And Finishes Acrylic // Polystyrene Sheet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 32 PAGES

10 21 13 2.2.2Anchoring Devices and Fasteners

2.2.4Hardware and Fittings 2.2.3Brackets 2.2.5Door Hardware 2.6Pilaster Shoes

SD-04 Samples 2.8Colors and Finishes 2.2.4Hardware and Fittings 2.2.2Anchoring Devices and

Fasteners SD-07 Certificates

1.4Warranty 10 44 16 SD-02 Shop Drawings

2.1Fire Extinguishers Accessories

2.4Cabinets 2.5Wall Brackets

SD-03 Product Data 2.1Fire Extinguishers

Accessories 2.5Wall Brackets

SD-04 Samples 2.1Fire Extinguisher 2.5Wall Brackets

Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 32 PAGES

10 44 16 SD-07 Certificates 2.1Fire Extinguishers 2.1Manufacturer's Warranty with

Inspection Tag 12 32 00 SD-02 Shop Drawings

2.2Fabrication SD-03 Product Data

2.3.1Cabinets 2.4Corrosion-Resistant Steel 2.4Plywood 2.4Hardwood 2.4Hardwood Plywood

Glass 2.4Adhesives 2.4Varnish 2.4Fasteners 2.4Steel Sinks 2.5Accessories and Hardware

Countertops SD-04 Samples

2.5Accessories and Hardware 1.3Manufacturer's Standard Color

Charts SD-08 Manufacturer’s Instructions

Part 3Manufacturer's Instructions 13 34 19 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 32 PAGES

13 34 19 1.3.1 GManufacturer's catalog data SD-07 Certificates

GQualification of Erector SD-08 Manufacturer’s Instructions

GInstallation of Roof and Wall panels

1.4 Gshipping, handling, and storage

SD-11 Closeout Submittals

3.10.1 GManufacturer's Warranty

3.10.2 GContractor's Warranty for

Installation 22 00 00 SD-02 Shop Drawings

3.6.1Plumbing System SD-03 Product Data

2.4Fixtures Water Saving valve urinals Water saving water closets Countertop sinks with water saving faucets

2.4.4Kitchen sinks with water saving faucets

Shower Saving Water Faucets 3.6.1Plumbing System

SD-06 Test Reports 3.6Tests, Flushing and Disinfection

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 32 PAGES

22 00 00 1.3Materials and Equipment SD-10 Operation and Maintenance Data

3.6.1Plumbing System 23 05 48.00 40 SD-02 Shop Drawings

1.2Installation Drawings 1.2Outline Drawings

SD-03 Product Data 1.2Equipment and Performance

Data 2.3Isolators

SD-06 Test Reports Type of Isolator Type of Base Allowable Deflection Measured Deflection

23 07 00 SD-03 Product Data Pipe Insulation Systems

SD-08 Manufacturer’s Instructions Pipe Insulation Systems

23 23 00 SD-02 Shop Drawings 2.3Refrigerant Piping System

SD-03 Product Data 2.3Refrigerant Piping System 3.5Refrigerant Piping Tests 3.4Demonstrations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 32 PAGES

23 23 00 3.1Verification of Dimensions SD-06 Test Reports

3.5Refrigerant Piping Tests SD-10 Operation and Maintenance Data

1.5Maintenance 3.4Operation and Maintenance

Manuals 23 34 23.00 40 SD-02 Shop Drawings

1.5Shop Drawings 3.1Installation Drawings 1.5Record Drawings

SD-03 Product Data 1.1Equipment and Performance

Data 1.5Equipment and Performance

Data 1.1Manufacturer's Catalog Data 1.5Manufacturer's Catalog Data 2.2Housing 2.3Fan 2.5Motor 2.6Bases 2.7Roof Curbs 2.8Dampers 2.9Screens

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 32 PAGES

23 34 23.00 40 2.10Sound Baffles SD-06 Test Reports

3.2Tests 23 81 00.00 20 SD-02 Shop Drawings

2.5.2Field-assembled refrigerant piping

1.4.2Control system wiring diagrams SD-03 Product Data

2.2Air conditioners 2.5Refrigerant piping and accessories 2.3Coatings for finned tube coils

SD-06 Test Reports 3.8.3Start-up and initial operational tests SD-08 Manufacturer’s Instructions

2.1Room air conditioners 2.2Air conditioners 2.5Refrigerant piping and accessories SD-10 Operation and Maintenance Data

2.1Room air conditioners 2.2Air conditioners

SD-11 Closeout Submittals 1.4.4Posted operating instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 32 PAGES

26 05 00.00 40 SD-01 Preconstruction Submittals 2.1Material, Equipment, and Fixture

Lists SD-03 Product Data

2.1.1Conduits and Raceways 2.1.3Wire and Cable 3.2.1.9Splices and Connectors 2.1.4Switches 2.1.5Receptacles 2.1.6Outlets, Outlet Boxes, and Pull

Boxes 2.1.8Circuit Breakers 2.1.7Panelboards 2.1.9Lamps and Lighting Fixtures 2.1.12Dry-Type Distribution

Transformers SD-06 Test Reports

3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test

SD-07 Certificates 1.4Certification

SD-08 Manufacturer’s Instructions Part 2Manufacturer's Instructions

26 05 13.00 40 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 32 PAGES

26 05 13.00 40 2.2.1 G[Multiple-Conductor Shielded Cables

2.2.2 G[Multiple-Conductor Nonshielded

Cables

2.2.3 G[Single-Conductor Shielded

Cables

2.2.4 G[Single-Conductor Nonshielded

Cables

2.2.5 G[Portable Cables

2.3.2 G[Nonmetallic Jacket

SD-06 Test Reports 3.2Dielectric-Absorption Tests 3.2Medium-Voltage Tests

3.2 G[Radiographic Tests

SD-07 Certificates 2.2.1.1Lead Sheath 2.5Flammability 3.1.4Minimum Bending Radius 3.2Medium-Voltage Tests 3.2Dielectric Absorption Tests 1.4Cable Splicers

SD-08 Manufacturer’s Instructions 3.3Medium-Voltage Power Cables 3.3Pothead Terminations

26 05 19.00 10 SD-03 Product Data 3.1Installation Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 32 PAGES

26 05 19.00 10 SD-06 Test Reports 3.2Tests, Inspections, and

Verifications 26 05 71.00 40 SD-02 Shop Drawings

3.1Protective Devices SD-03 Product Data

2.2Enclosures 2.3Circuit Breakers 3.1Control Devices 2.7Indicating Instruments

SD-06 Test Reports 3.2Dielectric Tests 3.2Final Test Reports

SD-08 Manufacturer’s Instructions 3.1Protective Devices

SD-10 Operation and Maintenance Data

2.3Circuit Breakers 26 08 00 SD-06 Test Reports

3.1Acceptance tests and inspections 1.4.3Acceptance test and inspections procedure 26 09 23.00 40 SD-03 Product Data

2.1.1Photoconductive Control Devices 3.1Installation Drawings 2.1.1Light-Sensitive Control Devices

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 32 PAGES

26 09 23.00 40 Lighting Contactor 2.2.2Photocell Switch 1.3Motion Sensors

SD-06 Test Reports 3.2System Operation Tests

26 11 14.00 10 SD-02 Shop Drawings 3.2General Installation

Requirements 1.2.4Detail Drawings 1.2.5As-Built Drawings

SD-03 Product Data

2.4.1 G[Support Structures

2.14.4Fault Current Analysis 2.14.1Protective Devices 2.14.5Coordination Study

2.9.2.1 G[Battery

2.2Nameplates 2.1Materials and Equipment 3.2General Installation

Requirements

3.8.1 G[Onsite Tests

SD-06 Test Reports 2.15Factory Tests 3.7Field Testing 3.7.1Field Test Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 32 PAGES

26 11 14.00 10 2.1Materials and Equipment SD-10 Operation and Maintenance Data

3.6 G[Operation and Maintenance

Manuals

26 20 00 SD-02 Shop Drawings 2.14Panelboards 2.17Transformers 2.4Busway 2.5Cable trays 2.24Wireways 3.1.10.1Marking strips

SD-03 Product Data 2.13Receptacles 2.14.3Circuit breakers 2.11Switches 2.17Transformers 2.15Enclosed circuit breakers

CATV outlets 2.20.3Grounding Busbar 2.25Surge protective devices

SD-06 Test Reports 3.5.2600-volt wiring test 3.5.5Grounding system test 3.5.3Transformer tests 3.5.4Ground-fault receptacle test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 32 PAGES

26 20 00 SD-09 Manufacturer’s Field Reports

2.27.1Transformer factory tests 26 24 16.00 40 SD-02 Shop Drawings

2.1.1Detail Drawings 2.1.1Outline Drawings

SD-03 Product Data 1.3Panelboards 2.1.1Panelboards

SD-06 Test Reports 3.2Continuity Tests 3.2Insulation Tests

SD-07 Certificates 1.4Statements

SD-08 Manufacturer’s Instructions 1.3Panelboards 2.1.1Panelboards

26 28 01.00 10 SD-03 Product Data 2.10Fault Current Analysis 2.10Protective Device Coordination

Study 2.1Equipment 1.4.1System Coordinator 3.3.5Protective Relays 3.2Installation

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 32 PAGES

26 28 01.00 10 3.3Field Testing SD-07 Certificates

1.6Devices and Equipment 26 28 21.00 40 SD-02 Shop Drawings

2.1Connection Diagrams 2.1Fabrication Drawings 2.1Installation Drawings

SD-03 Product Data 2.1Equipment and Performance

Data 2.3.1Contacts 2.3.2Indicating Lights 2.3.3Terminal Board 2.2.2Enclosures 2.5Accessories

SD-06 Test Reports 1.3Qualification Testing 1.3Operation Tests

SD-08 Manufacturer’s Instructions 2.3.2Automatic Transfer Switch

26 33 53.00 20 SD-02 Shop Drawings 1.6.1UPS Drawings 1.6.2UPS Installation

SD-03 Product Data 2.3UPS Module 2.9Factory Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 32 PAGES

26 33 53.00 20 2.2UPS System Spare Parts

SD-06 Test Reports 1.6.4Factory Test Plan 1.6.5Performance Test Plan 2.9Factory Tests 1.6.7Performance Tests Report 1.6.6Factory Tests Report

SD-09 Manufacturer’s Field Reports

3.2.2Initial Inspection and Tests 3.2.3Performance Tests

SD-10 Operation and Maintenance Data

1.10.1UPS Operation and Maintenance SD-11 Closeout Submittals

3.1Installation 26 41 00.00 40 SD-02 Shop Drawings

1.4.1Overall lightning protection system

1.4.1Each major component SD-03 Product Data

2.2.1Air Terminals 2.3Main and Secondary Conductors 2.2.2Ground Rods 2.4Clamp-Type Connectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 32 PAGES

26 41 00.00 40 2.5Lightning Protection Components 2.1Hardware 2.1Accessories

SD-06 Test Reports 3.6.1Grounding system test 3.6.2Lightning protection system inspection SD-07 Certificates UL listing or label or Equivalent

3.6.3Certificates 26 51 00 SD-03 Product Data

LED lighting fixtures LED lamps

2.7Lighting contactor 2.8Photocell switch 2.10LED Exit signs

LED Emergency lighting equipment

2.12Occupancy sensors SD-06 Test Reports

3.2Operating test 27 10 00 SD-02 Shop Drawings

1.6.1.1Telecommunications drawings 1.6.1.2Telecommunications Space

Drawings SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 32 PAGES

27 10 00 2.4Telecommunications cabling 2.5.6Patch panels 2.6Telecommunications outlet/connector assemblies 2.5.3Equipment support frame

SD-06 Test Reports 3.5.1Telecommunications cabling testing SD-07 Certificates

1.6.2.1Telecommunications Contractor 1.6.2.3Manufacturer Qualifications 1.6.3Test plan

SD-10 Operation and Maintenance Data

1.10.1Telecommunications cabling and pathway system

SD-11 Closeout Submittals 1.10.2Record Documentation

31 00 00 SD-01 Preconstruction Submittals

3.7 GShoring

1.3.2 GDewatering Work Plan

SD-03 Product Data

3.11 GUtilization of Excavated Materials

1.3.1.2Rock Excavation 3.6Opening of any Excavation or

Borrow Pit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 32 PAGES

31 00 00 SD-06 Test Reports 3.19Testing

SD-07 Certificates 3.19Testing

31 23 00.00 20 SD-01 Preconstruction Submittals 1.5.1Shoring and Sheeting Plan 1.5.2Dewatering work plan

SD-06 Test Reports Borrow Site Testing

3.12.2.1Fill and backfill 3.12.2.2Select material 3.12.2.3Density tests

32 16 13 SD-03 Product Data 2.1Concrete

SD-06 Test Reports 3.8Field Quality Control

32 92 23 SD-03 Product Data 2.3Fertilizer

SD-06 Test Reports Topsoil composition tests

SD-07 Certificates 2.1sods

33 11 00 SD-03 Product Data 2.1.1Piping Materials 2.1Water distribution main 2.2Water service line

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 32 PAGES

33 11 00 Corporation stops 2.1.2.2Valve boxes 2.2.2.2Valve boxes

SD-06 Test Reports 2.2.2.4Disinfection

SD-07 Certificates 2.1Water distribution main 2.2Water service line

Displacement Type Meters Compound Type Meters Hydro-neumatic equipment

SD-08 Manufacturer’s Instructions 1.3Delivery, storage, and handling

Installation 33 30 00 SD-01 Preconstruction Submittals

Existing Conditions SD-02 Shop Drawings

1.4.1Drawings 2.3.1Precast concrete manhole 2.3.3.1Frames, covers, and gratings

SD-03 Product Data 2.1Pipeline materials

SD-06 Test Reports 2.4Reports

SD-07 Certificates Gaskets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 32 PAGES

33 71 02 SD-03 Product Data Low voltage cable Low voltage cable terminations Sealing Material

2.11.2Manhole frames and covers 2.11.3Handhole frames and covers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR