Attach #5 Sub-Reg..pdf
PDF 241 KB Posted
- Attached to
- Cartagena Containers Federal contract opportunity
- Solicitation number
- 19AQMM19R0336
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q& A 19R0336.pdf | ||
| Attach # 5 Sub_ reg Rev 1.pdf | ||
| 19AQMM19R0336 B-M (Changes).pdf | ||
| 19AQMM19R0336 -A0001.pdf | ||
| Attach #1 CTG Containers Specifications Rev 1.pdf | ||
| Attach # 2 CTG Containers Drawings Rev 1.pdf | ||
| 19AQMM19R0336 B-M (A0001).pdf | ||
| Attach #10 SAM Reg.pdf | ||
| Attach # 1 Specification.pdf | ||
| Attach # 4 Insurance.pdf | ||
| Attach # 2 Drawings.pdf | ||
| Attach #8 Incident Report.docx | DOCX document | |
| 19AQMM19R0336 B-M.pdf | ||
| Synopsis.pdf | ||
| SF-1442.pdf | ||
| Attach #9 Mat& Prod Sub Req.doc | DOC document | |
| Attach #7 PPQ.docx | DOCX document | |
| Attach # 3 Bid_Chart.xlsx | XLSX spreadsheet |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 32 PAGES
CONTAINERS CARTAGENA
01 32 16.00 20 SD-01 Preconstruction Submittals 1.2Construction schedule
Submittal Register 01 33 00 SD-01 Preconstruction Submittals
1.6Submittal Register 01 50 00 SD-01 Preconstruction Submittals
1.3Construction site plan 01 78 00 SD-03 Product Data
As-Built Record of Equipment and Materials
1.6.1Warranty Management Plan 1.6.4Warranty Tags
Spare Parts Data SD-08 Manufacturer’s Instructions
1.5Preventative Maintenance 1.5Condition Monitoring (Predictive
Testing) 1.5Inspection 1.6.1Instructions
SD-10 Operation and Maintenance Data
1.7Operation and Maintenance Manuals
SD-11 Closeout Submittals 1.4.1Record Drawings
03 11 13.00 10 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 32 PAGES
03 11 13.00 10 3.1.1 GFormwork SD-03 Product Data
1.2Design 2.1Form Materials 2.1.6Form Releasing Agents
SD-04 Samples
1.4 GSample Panels
SD-06 Test Reports 3.5Inspection
3.4.1 GFormwork Not Supporting Weight
of Concrete SD-07 Certificates Fiber Voids
03 20 00.00 10 SD-02 Shop Drawings 3.1Reinforcement
SD-03 Product Data 1.3.1Welding
SD-04 Samples Reinforcement Bars
SD-07 Certificates 2.3Reinforcing Steel
03 30 00 SD-02 Shop Drawings 1.6.2.1Fabrication Drawings 1.6.2.2Formwork 1.6.2.2Formwork 1.6.2.1Special Construction
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 32 PAGES
03 30 00 1.6.2.3 GReinforcing steel SD-03 Product Data
2.4.7Materials for curing concrete 2.4.9Joint sealants 2.4.8Joint filler 2.4.1Cement 2.4.1.1Portland Cement 2.3.2Ready-Mix Concrete 2.4.6Vapor barrier 2.6Bonding Materials 2.3.3Concrete Curing Materials 2.5Reinforcement 1.6.2.1Reinforcement Materials 2.4.10Epoxy bonding compound 2.4.9.3Waterstops 3.13.2Waterstops 2.1.1Wood Forms 2.4.11Biodegradable Form Release
Agent SD-04 Samples
1.6.5.1Slab finish sample 2.4.9.3Dumbbell Type 2.4.9.3Rubber 2.4.9.3Polyvinylchloride (PVC)
SD-05 Design Data
2.3.1 Gmix design
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 32 PAGES
03 30 00 1.6.1.1Calculations SD-06 Test Reports
1.6.4.1 GConcrete mix design
1.6.4.2Aggregates 3.9.2.1Tolerance report 3.11.2.3Compressive strength tests 2.8.4Slump 2.8.1Air Entrainment
SD-07 Certificates 1.6.3.1Curing concrete elements 1.6.3.3Finishing plan 1.6.3.6Material Safety Data Sheets 2.5.5Steel Bar
05 12 00 SD-02 Shop Drawings 1.5.2.1Erection Plan 1.5.1Fabrication drawings
SD-03 Product Data 2.4Shop primer 2.3.1Welding electrodes and rods 2.2.5Load indicator washers
SD-06 Test Reports 2.4Class B coating 2.2Bolts, nuts, and washers
SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 32 PAGES
05 12 00 1.5.2.2Welding procedures and qualifications
05 50 13 SD-02 Shop Drawings 2.6structural steel door frames 2.3Access doors and panels 2.4Cover plates and frames
SD-03 Product Data 2.3Access doors and panels 2.4Cover plates and frames
Control-joint covers Floor gratings and roof walkways
2.6Structural steel door frames 05 51 00 SD-02 Shop Drawings
2.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars and
Strips
2.12 GMetal Stair System
SD-03 Product Data
2.2 GStructural Steel Plates, Shapes, and Bars
2.3 GStructural Steel Tubing
2.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.13 GProtective Coating
GSteel Tread Stairs SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 32 PAGES
05 51 00 1.3 GWelding Procedures
1.3 GWelder Qualification
SD-08 Manufacturer’s Instructions
2.2 GStructural Steel Plates, Shapes, and Bars
2.3 GStructural Steel Tubing
2.8 GGray Iron Castings
2.9 GMalleable Iron Castings
2.13 GProtective Coating
07 21 00 SD-03 Product Data Product Data Manufacturers Storage and Installation Instrucctions
SD-11 Closeout Submittals Warranty
07 41 63 SD-01 Preconstruction Submittals 1.5.1Qualification of Manufacturer 1.5.3Qualification of Manufacturer 1.5.1Qualification of Installer
SD-02 Shop Drawings 1.5.1Roofing Panels 1.5.1Flashing and Accessories 1.5.1Gutter/Downspout Assembly
SD-03 Product Data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 32 PAGES
07 41 63 1.5.1Closure Materials 1.5.1Pressure Sensitive Tape 1.5.1Sealants and Caulking 1.5.1Galvanizing Repair Paint 1.5.1Aluminized Steel Repair Paint 1.5.1Accessories
SD-04 Samples 1.5.1Roofing Panels 2.2.2Fasteners 2.4.1Metal Closure Strips 1.5.1Manufacturer s color charts and chips SD-05 Design Data
1.5.1Wind design analysis SD-07 Certificates
2.2.2Fasteners 1.5.1Enamel Repair Paint
SD-08 Manufacturer’s Instructions 1.5.1Installation of Roof panel assemblies SD-11 Closeout Submittals
1.8Warranty 1.5.1Instructions 1.5.1Material Safety Data Sheets
07 44 56 SD-03 Product Data Cementitious Panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 32 PAGES
07 44 56 Accessories SD-08 Manufacturer’s Instructions Manufacturers Instructions
SD-10 Operation and Maintenance Data Manufacturer maintenance instructions
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates 3.3.6Sealant
08 11 13 SD-03 Product Data Doors
2.1Doors Frames
2.4Frames 2.3Accessories 2.5Weatherstripping
SD-04 Samples Finishes and painting must comply with Finishes on Section
08 51 13 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 32 PAGES
08 51 13 2.2Windows 2.3.8.1Hardware 2.3.3Fasteners 1.9Window Performance 2.5Mullions 2.3.10Screens 2.3.2Weatherstripping 2.3.8Accessories 2.3.4Adhesives
SD-04 Samples 1.3.1.1Finish Sample 1.3.1.2Window Sample
SD-10 Operation and Maintenance Data
2.2Windows 08 71 00 SD-03 Product Data
2.1Hardware Items SD-08 Manufacturer’s Instructions
3.1Installation SD-11 Closeout Submittals
1.3.1Key Bitting 08 81 00 SD-03 Product Data
Glass SD-04 Samples
2.4.2Glazing Compound 2.4.5Tape
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 32 PAGES
08 81 00 2.4.3.1Sealant SD-07 Certificates Plastic/Acrylic Glazing.
SD-08 Manufacturer’s Instructions 2.4Setting and Sealing Materials 3.2Glass Setting
08 87 23.13 SD-03 Product Data 2.2Silver reflective Fragment
Retention Film 3.3Cleaning
SD-04 Samples 2.2Silver reflective fragment
Retention Film 09 06 90 SD-04 Samples
2.2Color Schedule 09 23 00 SD-03 Product Data
Data Sheet SD-08 Manufacturer’s Instructions
2.7Ready-mix gypsum plaster 09 30 10 SD-02 Shop Drawings
3.2Detail Drawings SD-03 Product Data
2.1 GTile
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 32 PAGES
09 30 10 2.1 GTile
2.1 GAccessories
2.1.2 GAccessories
2.1 GTransition Strips
2.5 GTransition Strips
2.4 GGrout
SD-07 Certificates 2.1Tile 2.4Mortar, Grout, and Adhesive
SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions
SD-10 Operation and Maintenance Data
3.2 GInstallation
SD-11 Closeout Submittals LEED Documentation
2.4Adhesives 09 65 00 SD-03 Product Data
2.6Resilient Flooring and Accessories
2.2Adhesives SD-08 Manufacturer’s Instructions
3.2Surface Preparation 3.1Installation
09 90 00 SD-02 Shop Drawings 3.11Piping identification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 32 PAGES
09 90 00 3.11stencil SD-03 Product Data Certification
2.1Coating 2.1Manufacturer's Technical Data
Sheets SD-04 Samples
1.9Color 1.4.2Textured Wall Coating System 1.4.3Sample Textured Wall Coating
System Mock-Up SD-07 Certificates Applicator's qualifications Qualification Testing
SD-08 Manufacturer’s Instructions Application instructions
3.7.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1Coatings:
09 96 00 SD-01 Preconstruction Submittals
1.3Material, Equipment and Fixture List
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 32 PAGES
09 96 00 Heat-Resistant Coatings 2.1Epoxy Coatings 2.2Polyurethane Coatings
Chlorinated-Rubber Coatings SD-04 Samples
1.3Color Chips SD-07 Certificates
2.1Epoxy Coatings 2.2Polyurethane Coatings
10 14 00.20 SD-02 Shop Drawings Detail Drawings
SD-03 Product Data 3.1Installation
SD-04 Samples Interior Signage
SD-10 Operation and Maintenance Data
3.1Approved Manufacturer's Instructions
3.1.2Protection and Cleaning 10 21 13 SD-03 Product Data
2.1Cleaning and Maintenance Instructions
2.8Colors And Finishes Acrylic // Polystyrene Sheet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 32 PAGES
10 21 13 2.2.2Anchoring Devices and Fasteners
2.2.4Hardware and Fittings 2.2.3Brackets 2.2.5Door Hardware 2.6Pilaster Shoes
SD-04 Samples 2.8Colors and Finishes 2.2.4Hardware and Fittings 2.2.2Anchoring Devices and
Fasteners SD-07 Certificates
1.4Warranty 10 44 16 SD-02 Shop Drawings
2.1Fire Extinguishers Accessories
2.4Cabinets 2.5Wall Brackets
SD-03 Product Data 2.1Fire Extinguishers
Accessories 2.5Wall Brackets
SD-04 Samples 2.1Fire Extinguisher 2.5Wall Brackets
Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 32 PAGES
10 44 16 SD-07 Certificates 2.1Fire Extinguishers 2.1Manufacturer's Warranty with
Inspection Tag 12 32 00 SD-02 Shop Drawings
2.2Fabrication SD-03 Product Data
2.3.1Cabinets 2.4Corrosion-Resistant Steel 2.4Plywood 2.4Hardwood 2.4Hardwood Plywood
Glass 2.4Adhesives 2.4Varnish 2.4Fasteners 2.4Steel Sinks 2.5Accessories and Hardware
Countertops SD-04 Samples
2.5Accessories and Hardware 1.3Manufacturer's Standard Color
Charts SD-08 Manufacturer’s Instructions
Part 3Manufacturer's Instructions 13 34 19 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 32 PAGES
13 34 19 1.3.1 GManufacturer's catalog data SD-07 Certificates
GQualification of Erector SD-08 Manufacturer’s Instructions
GInstallation of Roof and Wall panels
1.4 Gshipping, handling, and storage
SD-11 Closeout Submittals
3.10.1 GManufacturer's Warranty
3.10.2 GContractor's Warranty for
Installation 22 00 00 SD-02 Shop Drawings
3.6.1Plumbing System SD-03 Product Data
2.4Fixtures Water Saving valve urinals Water saving water closets Countertop sinks with water saving faucets
2.4.4Kitchen sinks with water saving faucets
Shower Saving Water Faucets 3.6.1Plumbing System
SD-06 Test Reports 3.6Tests, Flushing and Disinfection
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 32 PAGES
22 00 00 1.3Materials and Equipment SD-10 Operation and Maintenance Data
3.6.1Plumbing System 23 05 48.00 40 SD-02 Shop Drawings
1.2Installation Drawings 1.2Outline Drawings
SD-03 Product Data 1.2Equipment and Performance
Data 2.3Isolators
SD-06 Test Reports Type of Isolator Type of Base Allowable Deflection Measured Deflection
23 07 00 SD-03 Product Data Pipe Insulation Systems
SD-08 Manufacturer’s Instructions Pipe Insulation Systems
23 23 00 SD-02 Shop Drawings 2.3Refrigerant Piping System
SD-03 Product Data 2.3Refrigerant Piping System 3.5Refrigerant Piping Tests 3.4Demonstrations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 32 PAGES
23 23 00 3.1Verification of Dimensions SD-06 Test Reports
3.5Refrigerant Piping Tests SD-10 Operation and Maintenance Data
1.5Maintenance 3.4Operation and Maintenance
Manuals 23 34 23.00 40 SD-02 Shop Drawings
1.5Shop Drawings 3.1Installation Drawings 1.5Record Drawings
SD-03 Product Data 1.1Equipment and Performance
Data 1.5Equipment and Performance
Data 1.1Manufacturer's Catalog Data 1.5Manufacturer's Catalog Data 2.2Housing 2.3Fan 2.5Motor 2.6Bases 2.7Roof Curbs 2.8Dampers 2.9Screens
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 32 PAGES
23 34 23.00 40 2.10Sound Baffles SD-06 Test Reports
3.2Tests 23 81 00.00 20 SD-02 Shop Drawings
2.5.2Field-assembled refrigerant piping
1.4.2Control system wiring diagrams SD-03 Product Data
2.2Air conditioners 2.5Refrigerant piping and accessories 2.3Coatings for finned tube coils
SD-06 Test Reports 3.8.3Start-up and initial operational tests SD-08 Manufacturer’s Instructions
2.1Room air conditioners 2.2Air conditioners 2.5Refrigerant piping and accessories SD-10 Operation and Maintenance Data
2.1Room air conditioners 2.2Air conditioners
SD-11 Closeout Submittals 1.4.4Posted operating instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 32 PAGES
26 05 00.00 40 SD-01 Preconstruction Submittals 2.1Material, Equipment, and Fixture
Lists SD-03 Product Data
2.1.1Conduits and Raceways 2.1.3Wire and Cable 3.2.1.9Splices and Connectors 2.1.4Switches 2.1.5Receptacles 2.1.6Outlets, Outlet Boxes, and Pull
Boxes 2.1.8Circuit Breakers 2.1.7Panelboards 2.1.9Lamps and Lighting Fixtures 2.1.12Dry-Type Distribution
Transformers SD-06 Test Reports
3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test
SD-07 Certificates 1.4Certification
SD-08 Manufacturer’s Instructions Part 2Manufacturer's Instructions
26 05 13.00 40 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 32 PAGES
26 05 13.00 40 2.2.1 G[Multiple-Conductor Shielded Cables
2.2.2 G[Multiple-Conductor Nonshielded
Cables
2.2.3 G[Single-Conductor Shielded
Cables
2.2.4 G[Single-Conductor Nonshielded
Cables
2.2.5 G[Portable Cables
2.3.2 G[Nonmetallic Jacket
SD-06 Test Reports 3.2Dielectric-Absorption Tests 3.2Medium-Voltage Tests
3.2 G[Radiographic Tests
SD-07 Certificates 2.2.1.1Lead Sheath 2.5Flammability 3.1.4Minimum Bending Radius 3.2Medium-Voltage Tests 3.2Dielectric Absorption Tests 1.4Cable Splicers
SD-08 Manufacturer’s Instructions 3.3Medium-Voltage Power Cables 3.3Pothead Terminations
26 05 19.00 10 SD-03 Product Data 3.1Installation Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 32 PAGES
26 05 19.00 10 SD-06 Test Reports 3.2Tests, Inspections, and
Verifications 26 05 71.00 40 SD-02 Shop Drawings
3.1Protective Devices SD-03 Product Data
2.2Enclosures 2.3Circuit Breakers 3.1Control Devices 2.7Indicating Instruments
SD-06 Test Reports 3.2Dielectric Tests 3.2Final Test Reports
SD-08 Manufacturer’s Instructions 3.1Protective Devices
SD-10 Operation and Maintenance Data
2.3Circuit Breakers 26 08 00 SD-06 Test Reports
3.1Acceptance tests and inspections 1.4.3Acceptance test and inspections procedure 26 09 23.00 40 SD-03 Product Data
2.1.1Photoconductive Control Devices 3.1Installation Drawings 2.1.1Light-Sensitive Control Devices
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 32 PAGES
26 09 23.00 40 Lighting Contactor 2.2.2Photocell Switch 1.3Motion Sensors
SD-06 Test Reports 3.2System Operation Tests
26 11 14.00 10 SD-02 Shop Drawings 3.2General Installation
Requirements 1.2.4Detail Drawings 1.2.5As-Built Drawings
SD-03 Product Data
2.4.1 G[Support Structures
2.14.4Fault Current Analysis 2.14.1Protective Devices 2.14.5Coordination Study
2.9.2.1 G[Battery
2.2Nameplates 2.1Materials and Equipment 3.2General Installation
Requirements
3.8.1 G[Onsite Tests
SD-06 Test Reports 2.15Factory Tests 3.7Field Testing 3.7.1Field Test Reports
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 32 PAGES
26 11 14.00 10 2.1Materials and Equipment SD-10 Operation and Maintenance Data
3.6 G[Operation and Maintenance
Manuals
26 20 00 SD-02 Shop Drawings 2.14Panelboards 2.17Transformers 2.4Busway 2.5Cable trays 2.24Wireways 3.1.10.1Marking strips
SD-03 Product Data 2.13Receptacles 2.14.3Circuit breakers 2.11Switches 2.17Transformers 2.15Enclosed circuit breakers
CATV outlets 2.20.3Grounding Busbar 2.25Surge protective devices
SD-06 Test Reports 3.5.2600-volt wiring test 3.5.5Grounding system test 3.5.3Transformer tests 3.5.4Ground-fault receptacle test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 32 PAGES
26 20 00 SD-09 Manufacturer’s Field Reports
2.27.1Transformer factory tests 26 24 16.00 40 SD-02 Shop Drawings
2.1.1Detail Drawings 2.1.1Outline Drawings
SD-03 Product Data 1.3Panelboards 2.1.1Panelboards
SD-06 Test Reports 3.2Continuity Tests 3.2Insulation Tests
SD-07 Certificates 1.4Statements
SD-08 Manufacturer’s Instructions 1.3Panelboards 2.1.1Panelboards
26 28 01.00 10 SD-03 Product Data 2.10Fault Current Analysis 2.10Protective Device Coordination
Study 2.1Equipment 1.4.1System Coordinator 3.3.5Protective Relays 3.2Installation
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 32 PAGES
26 28 01.00 10 3.3Field Testing SD-07 Certificates
1.6Devices and Equipment 26 28 21.00 40 SD-02 Shop Drawings
2.1Connection Diagrams 2.1Fabrication Drawings 2.1Installation Drawings
SD-03 Product Data 2.1Equipment and Performance
Data 2.3.1Contacts 2.3.2Indicating Lights 2.3.3Terminal Board 2.2.2Enclosures 2.5Accessories
SD-06 Test Reports 1.3Qualification Testing 1.3Operation Tests
SD-08 Manufacturer’s Instructions 2.3.2Automatic Transfer Switch
26 33 53.00 20 SD-02 Shop Drawings 1.6.1UPS Drawings 1.6.2UPS Installation
SD-03 Product Data 2.3UPS Module 2.9Factory Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 32 PAGES
26 33 53.00 20 2.2UPS System Spare Parts
SD-06 Test Reports 1.6.4Factory Test Plan 1.6.5Performance Test Plan 2.9Factory Tests 1.6.7Performance Tests Report 1.6.6Factory Tests Report
SD-09 Manufacturer’s Field Reports
3.2.2Initial Inspection and Tests 3.2.3Performance Tests
SD-10 Operation and Maintenance Data
1.10.1UPS Operation and Maintenance SD-11 Closeout Submittals
3.1Installation 26 41 00.00 40 SD-02 Shop Drawings
1.4.1Overall lightning protection system
1.4.1Each major component SD-03 Product Data
2.2.1Air Terminals 2.3Main and Secondary Conductors 2.2.2Ground Rods 2.4Clamp-Type Connectors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 32 PAGES
26 41 00.00 40 2.5Lightning Protection Components 2.1Hardware 2.1Accessories
SD-06 Test Reports 3.6.1Grounding system test 3.6.2Lightning protection system inspection SD-07 Certificates UL listing or label or Equivalent
3.6.3Certificates 26 51 00 SD-03 Product Data
LED lighting fixtures LED lamps
2.7Lighting contactor 2.8Photocell switch 2.10LED Exit signs
LED Emergency lighting equipment
2.12Occupancy sensors SD-06 Test Reports
3.2Operating test 27 10 00 SD-02 Shop Drawings
1.6.1.1Telecommunications drawings 1.6.1.2Telecommunications Space
Drawings SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 32 PAGES
27 10 00 2.4Telecommunications cabling 2.5.6Patch panels 2.6Telecommunications outlet/connector assemblies 2.5.3Equipment support frame
SD-06 Test Reports 3.5.1Telecommunications cabling testing SD-07 Certificates
1.6.2.1Telecommunications Contractor 1.6.2.3Manufacturer Qualifications 1.6.3Test plan
SD-10 Operation and Maintenance Data
1.10.1Telecommunications cabling and pathway system
SD-11 Closeout Submittals 1.10.2Record Documentation
31 00 00 SD-01 Preconstruction Submittals
3.7 GShoring
1.3.2 GDewatering Work Plan
SD-03 Product Data
3.11 GUtilization of Excavated Materials
1.3.1.2Rock Excavation 3.6Opening of any Excavation or
Borrow Pit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 32 PAGES
31 00 00 SD-06 Test Reports 3.19Testing
SD-07 Certificates 3.19Testing
31 23 00.00 20 SD-01 Preconstruction Submittals 1.5.1Shoring and Sheeting Plan 1.5.2Dewatering work plan
SD-06 Test Reports Borrow Site Testing
3.12.2.1Fill and backfill 3.12.2.2Select material 3.12.2.3Density tests
32 16 13 SD-03 Product Data 2.1Concrete
SD-06 Test Reports 3.8Field Quality Control
32 92 23 SD-03 Product Data 2.3Fertilizer
SD-06 Test Reports Topsoil composition tests
SD-07 Certificates 2.1sods
33 11 00 SD-03 Product Data 2.1.1Piping Materials 2.1Water distribution main 2.2Water service line
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 32 PAGES
33 11 00 Corporation stops 2.1.2.2Valve boxes 2.2.2.2Valve boxes
SD-06 Test Reports 2.2.2.4Disinfection
SD-07 Certificates 2.1Water distribution main 2.2Water service line
Displacement Type Meters Compound Type Meters Hydro-neumatic equipment
SD-08 Manufacturer’s Instructions 1.3Delivery, storage, and handling
Installation 33 30 00 SD-01 Preconstruction Submittals
Existing Conditions SD-02 Shop Drawings
1.4.1Drawings 2.3.1Precast concrete manhole 2.3.3.1Frames, covers, and gratings
SD-03 Product Data 2.1Pipeline materials
SD-06 Test Reports 2.4Reports
SD-07 Certificates Gaskets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 32 PAGES
33 71 02 SD-03 Product Data Low voltage cable Low voltage cable terminations Sealing Material
2.11.2Manhole frames and covers 2.11.3Handhole frames and covers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .