Attachment_10_-_Submittal_Register.pdf
PDF 368 KB Posted
- Attached to
- AC Unit Installation - Honduras Federal contract opportunity
- Solicitation number
- 19AQMM18R0139
About this file
Attachment 10 - Submittal Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19AQMM18R0139_0002.pdf | ||
| 19AQMM18R0139_QA.pdf | ||
| 19AQMM18R0139_0001.pdf | ||
| Attachment_2_-_AC_DRAWINGS.zip | ZIP file | |
| Attachment_5_-_ANNEX_3.xls | XLS spreadsheet | |
| Attachment_1_-_AC_System_SOW.pdf | ||
| Attachment_3_-_ANNEX_1.xlsx | XLSX spreadsheet | |
| Attachment_9_-_Firm_and_Project_Information.pdf | ||
| Attachment_8_-_Past_Performance_Questionnaire.pdf | ||
| 19AQMM18R0139.pdf | ||
| Attachment_6_-_ANNEX_4.xls | XLS spreadsheet | |
| Attachment_7_-_SUMMARY_OF_ITEMS.xlsx | XLSX spreadsheet | |
| 19AQMM18R0139_B-M.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT:
FROM:
TO:
CHECK ONE
OF TRANSMITTAL #: ##
CONTRACT REFERENCE DOCUMENT OBSERVATIONS
SPEC # DRAWING # INFORM. ONLY GOV. APPROV Y N
Contractor Inspection System E.5 / F.9 /H.27
List of Proposed Subcontractors H.10 / F.9 / H.29
Contractor Licenses H.10 / I.10 /F.9
Project Schedule F.5 / F.9
Weekly inspection reports E.5 / F.9
Monthly progress report E.5 / F.10
Payment Tables F.9 / G.4
Schedule for progress payment G.3
Certification of Payment to Subcontractors G.5
Project Schedule F.5 / F.9
Health and Safety Plan H.10 /H.26 / F.9
Quality Control (QC) Plan E.5.
DBA Insurance H.1 / H.31
Bodily Injury H.3/ F.9
Property Damage H.3/ F.9
Motor Vehicle Liability H.3/ F.9
Personnel List H.32 / H.27
Local Social Security payment H.32
Implementation of temporary facilities H.30
Air Conditioning Units SOW 3.2
Air Conditioning Evaporation Units VRF System SOW 3.2 AA-01 / AA-04
Evaporation. VRF Cassette - 1 Way - Eva 28 SOW 3.2 / 3.4 AA-01 / AA-04
Evaporation. VRF Cassette - 1 Way - Eva 38 SOW 3.2 / 3.4 AA-01 / AA-04
Evaporation. VRF Cassette - 1 Way - Eva 45 SOW 3.2 / 3.4 AA-01 / AA-04
Evaporation. VRF Cassette - 4 Way - Eva 71 SOW 3.2 / 3.4 AA-01 / AA-04
Evaporation. VRF Cassette - 4 Way - Eva 90 SOW 3.2 / 3.4 AA-01 / AA-04
Evaporation. VRF Cassette - 4 Way - Eva 112 SOW 3.2 / 3.4 AA-01 / AA-04
Evaporation. VRF Cassette - 4 Way - Eva 140 SOW 3.2 / 3.4 AA-01 / AA-04
Evaporation. VRF Cassette - 4 Way - Eva 160 SOW 3.2 / 3.4 AA-01 / AA-04
Condensing Units VRF- Con 280 SOW 3.3 AA-01 / AA-04
Condensing Units VRF - Con 450 SOW 3.3 AA-01 / AA-04
Central 20 Ton Type Package Duct Includes: 14 "X14" SOW 3.2 AA-01 / AA-04
Diffusers, Return Grilles 48 "X20", P3 Duct. SOW 3.2 AA-01 / AA-04
4 Ton Mini-Split Ceiling Type (Data Center) SOW 3.2 AA-01 / AA-04
Evaporation Unit Mini Plus Air-Cooled - Eva 140PE SOW 3.2 / 3.4 AA-01 / AA-04
Condenser Unit - With 140PE SOW 3.3 AA-01 / AA-04
4 Ton Mini-Split Ceiling Type (Laboratory) SOW 3.2 AA-01 / AA-04
Evaporation Unit Mini Plus Air-Cooled - Eva 140PE SOW 3.2 / 3.4 AA-01 / AA-04
Condenser Unit - With 140PE SOW 3.3 AA-01 / AA-04
Refrigerant line SOW 3.5 AA-01 / AA-04
Bathroom Extraction System -1-100 Pcm SOW 3.6 AA-01 / AA-04
Bathroom Extraction System -1-200 Pcm SOW 3.6 AA-01 / AA-04
Air ducts SOW 3.6 AA-01 / AA-04
PRESENTATION DATE: 00/MONTH/0000
IEA Corporation
ITEM #
CHECK ON THIS ITEM FOR
AIR CONDITIONING SYSTEM FOR THE
CRIMINAL INVESTIGATION ACADEMY (EIC) COMAYAGUA
CONTRACT #:
TRANSMITTAL SUMMARY:
TRANSMITAL OF SHOP DRAWING, EQUIPMENT DATA, MATERIAL SAMPLES,
OR MANUFACTUR'S CERTIFICATE, COMPLIANCE
APPROVAL
TRANSMITTAL #:
PAGE:
# OF ATTACHEMENTS
DATE: 00/MONTH/0000
THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL
In this cell provide a short description of the purpose of the transmittal. Include informtion about the use of the items, for what type of work is going to be used, etc.
DESCRIPTION ITEM SUBMITTED
I certify that the submitted items have been reviewed in detail and are correct in strict conformance with the contract drawings and specifications, except as otherwise stated.
CONTRACTOR
NAME
PROCESS DATE: APPROVING DATE:
ENG.MARIO NARVAEZ
TECHNICAL ADVISOR CONTRACTING OFFICER'S REPRESENTATIVE
NAME
I recommend the approval of the items listed and appointed with "Y", while items appointed with "N" the contractor shall submit new transmittals. Items for "information only" do not require approval.
I approve the items listed and appointed with "Y", while items appointed with "N" are not approved and the contractor shall submit new transmittals. The approval of these items does not means the acceptance of the works. Items for "information only" do not require approval.
PROJECT:
FROM:
TO:
CHECK ONE
OF TRANSMITTAL #: ##
CONTRACT REFERENCE DOCUMENT OBSERVATIONS
SPEC # DRAWING # INFORM. ONLY GOV. APPROV Y N
Metal Support Structure SOW 3.1 / 3.3 AA-02
Electric Wiring SOW 3.1 AA-03
Electric pipes SOW 3.1 AA-03
Electric boards SOW 3.1 AA-03
Brakers SOW 3.1 AA-03
Electric and Airconditioning tests SOW 3 AA-01/02/03/04
Exhaust fans warranty H.38
Airconditioning warranty H.38
Sustantial Completion request E.2
Certification of completion of puch list E.2
Final Completion and Acceptance request E.4
As built drawings H.8
Maintenance plan H.20
Maintenance and operational manual H.20
Guarranty FAR 52.246-21 I.15
PRESENTATION DATE: 00/MONTH/0000
IEA Corporation
CONTRACTOR TECHNICAL ADVISOR CONTRACTING OFFICER'S REPRESENTATIVE
NAME ENG.MARIO NARVAEZ NAME
APPROVAL
PROCESS DATE: APPROVING DATE:
I certify that the submitted items have been reviewed in detail and are correct in strict conformance with the contract drawings and specifications, except as otherwise stated.
I recommend the approval of the items listed and appointed with "Y", while items appointed with "N" the contractor shall submit new transmittals. Items for "information only" do not require approval.
I approve the items listed and appointed with "Y", while items appointed with "N" are not approved and the contractor shall submit new transmittals. The approval of these items does not means the acceptance of the works. Items for "information only" do not require approval.
TRANSMITTAL SUMMARY:
In this cell provide a short description of the purpose of the transmittal. Include informtion about the use of the items, for what type of work is going to be used, etc.
THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL
ITEM # DESCRIPTION ITEM SUBMITTED
CHECK ON THIS ITEM FOR
TRANSMITAL OF SHOP DRAWING, EQUIPMENT DATA, MATERIAL SAMPLES,
OR MANUFACTUR'S CERTIFICATE, COMPLIANCE
TRANSMITTAL #: 1
PAGE: 2 of 2
# OF ATTACHEMENTS
DATE: 00/MONTH/0000
AIR CONDITIONING SYSTEM FOR THE
CONTRACT #: ########
CRIMINAL INVESTIGATION ACADEMY (EIC) COMAYAGUA
File details come from the government source that posted it.