Attachment_10_-_Submittal_Register.pdf

PDF 368 KB Posted

Attached to
AC Unit Installation - Honduras Federal contract opportunity
Solicitation number
19AQMM18R0139
Issued by
Department of State Office of Acquisition Management

About this file

Attachment 10 - Submittal Register

View the file

Other files for this federal contract opportunity

Other files attached to AC Unit Installation - Honduras, newest first.
File Type Posted
19AQMM18R0139_0002.pdf PDF
19AQMM18R0139_QA.pdf PDF
19AQMM18R0139_0001.pdf PDF
Attachment_2_-_AC_DRAWINGS.zip ZIP file
Attachment_5_-_ANNEX_3.xls XLS spreadsheet
Attachment_1_-_AC_System_SOW.pdf PDF
Attachment_3_-_ANNEX_1.xlsx XLSX spreadsheet
Attachment_9_-_Firm_and_Project_Information.pdf PDF
Attachment_8_-_Past_Performance_Questionnaire.pdf PDF
19AQMM18R0139.pdf PDF
Attachment_6_-_ANNEX_4.xls XLS spreadsheet
Attachment_7_-_SUMMARY_OF_ITEMS.xlsx XLSX spreadsheet
19AQMM18R0139_B-M.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT:

FROM:

TO:

CHECK ONE

OF TRANSMITTAL #: ##

CONTRACT REFERENCE DOCUMENT OBSERVATIONS

SPEC # DRAWING # INFORM. ONLY GOV. APPROV Y N

Contractor Inspection System E.5 / F.9 /H.27

List of Proposed Subcontractors H.10 / F.9 / H.29

Contractor Licenses H.10 / I.10 /F.9

Project Schedule F.5 / F.9

Weekly inspection reports E.5 / F.9

Monthly progress report E.5 / F.10

Payment Tables F.9 / G.4

Schedule for progress payment G.3

Certification of Payment to Subcontractors G.5

Project Schedule F.5 / F.9

Health and Safety Plan H.10 /H.26 / F.9

Quality Control (QC) Plan E.5.

DBA Insurance H.1 / H.31

Bodily Injury H.3/ F.9

Property Damage H.3/ F.9

Motor Vehicle Liability H.3/ F.9

Personnel List H.32 / H.27

Local Social Security payment H.32

Implementation of temporary facilities H.30

Air Conditioning Units SOW 3.2

Air Conditioning Evaporation Units VRF System SOW 3.2 AA-01 / AA-04

Evaporation. VRF Cassette - 1 Way - Eva 28 SOW 3.2 / 3.4 AA-01 / AA-04

Evaporation. VRF Cassette - 1 Way - Eva 38 SOW 3.2 / 3.4 AA-01 / AA-04

Evaporation. VRF Cassette - 1 Way - Eva 45 SOW 3.2 / 3.4 AA-01 / AA-04

Evaporation. VRF Cassette - 4 Way - Eva 71 SOW 3.2 / 3.4 AA-01 / AA-04

Evaporation. VRF Cassette - 4 Way - Eva 90 SOW 3.2 / 3.4 AA-01 / AA-04

Evaporation. VRF Cassette - 4 Way - Eva 112 SOW 3.2 / 3.4 AA-01 / AA-04

Evaporation. VRF Cassette - 4 Way - Eva 140 SOW 3.2 / 3.4 AA-01 / AA-04

Evaporation. VRF Cassette - 4 Way - Eva 160 SOW 3.2 / 3.4 AA-01 / AA-04

Condensing Units VRF- Con 280 SOW 3.3 AA-01 / AA-04

Condensing Units VRF - Con 450 SOW 3.3 AA-01 / AA-04

Central 20 Ton Type Package Duct Includes: 14 "X14" SOW 3.2 AA-01 / AA-04

Diffusers, Return Grilles 48 "X20", P3 Duct. SOW 3.2 AA-01 / AA-04

4 Ton Mini-Split Ceiling Type (Data Center) SOW 3.2 AA-01 / AA-04

Evaporation Unit Mini Plus Air-Cooled - Eva 140PE SOW 3.2 / 3.4 AA-01 / AA-04

Condenser Unit - With 140PE SOW 3.3 AA-01 / AA-04

4 Ton Mini-Split Ceiling Type (Laboratory) SOW 3.2 AA-01 / AA-04

Evaporation Unit Mini Plus Air-Cooled - Eva 140PE SOW 3.2 / 3.4 AA-01 / AA-04

Condenser Unit - With 140PE SOW 3.3 AA-01 / AA-04

Refrigerant line SOW 3.5 AA-01 / AA-04

Bathroom Extraction System -1-100 Pcm SOW 3.6 AA-01 / AA-04

Bathroom Extraction System -1-200 Pcm SOW 3.6 AA-01 / AA-04

Air ducts SOW 3.6 AA-01 / AA-04

PRESENTATION DATE: 00/MONTH/0000

IEA Corporation

ITEM #

CHECK ON THIS ITEM FOR

AIR CONDITIONING SYSTEM FOR THE

CRIMINAL INVESTIGATION ACADEMY (EIC) COMAYAGUA

CONTRACT #:

TRANSMITTAL SUMMARY:

TRANSMITAL OF SHOP DRAWING, EQUIPMENT DATA, MATERIAL SAMPLES,

OR MANUFACTUR'S CERTIFICATE, COMPLIANCE

APPROVAL

TRANSMITTAL #:

PAGE:

# OF ATTACHEMENTS

DATE: 00/MONTH/0000

THIS IS A NEW TRANSMITTAL

THIS IS A RESUBMITTAL

In this cell provide a short description of the purpose of the transmittal. Include informtion about the use of the items, for what type of work is going to be used, etc.

DESCRIPTION ITEM SUBMITTED

I certify that the submitted items have been reviewed in detail and are correct in strict conformance with the contract drawings and specifications, except as otherwise stated.

CONTRACTOR

NAME

PROCESS DATE: APPROVING DATE:

ENG.MARIO NARVAEZ

TECHNICAL ADVISOR CONTRACTING OFFICER'S REPRESENTATIVE

NAME

I recommend the approval of the items listed and appointed with "Y", while items appointed with "N" the contractor shall submit new transmittals. Items for "information only" do not require approval.

I approve the items listed and appointed with "Y", while items appointed with "N" are not approved and the contractor shall submit new transmittals. The approval of these items does not means the acceptance of the works. Items for "information only" do not require approval.

PROJECT:

FROM:

TO:

CHECK ONE

OF TRANSMITTAL #: ##

CONTRACT REFERENCE DOCUMENT OBSERVATIONS

SPEC # DRAWING # INFORM. ONLY GOV. APPROV Y N

Metal Support Structure SOW 3.1 / 3.3 AA-02

Electric Wiring SOW 3.1 AA-03

Electric pipes SOW 3.1 AA-03

Electric boards SOW 3.1 AA-03

Brakers SOW 3.1 AA-03

Electric and Airconditioning tests SOW 3 AA-01/02/03/04

Exhaust fans warranty H.38

Airconditioning warranty H.38

Sustantial Completion request E.2

Certification of completion of puch list E.2

Final Completion and Acceptance request E.4

As built drawings H.8

Maintenance plan H.20

Maintenance and operational manual H.20

Guarranty FAR 52.246-21 I.15

PRESENTATION DATE: 00/MONTH/0000

IEA Corporation

CONTRACTOR TECHNICAL ADVISOR CONTRACTING OFFICER'S REPRESENTATIVE

NAME ENG.MARIO NARVAEZ NAME

APPROVAL

PROCESS DATE: APPROVING DATE:

I certify that the submitted items have been reviewed in detail and are correct in strict conformance with the contract drawings and specifications, except as otherwise stated.

I recommend the approval of the items listed and appointed with "Y", while items appointed with "N" the contractor shall submit new transmittals. Items for "information only" do not require approval.

I approve the items listed and appointed with "Y", while items appointed with "N" are not approved and the contractor shall submit new transmittals. The approval of these items does not means the acceptance of the works. Items for "information only" do not require approval.

TRANSMITTAL SUMMARY:

In this cell provide a short description of the purpose of the transmittal. Include informtion about the use of the items, for what type of work is going to be used, etc.

THIS IS A NEW TRANSMITTAL

THIS IS A RESUBMITTAL

ITEM # DESCRIPTION ITEM SUBMITTED

CHECK ON THIS ITEM FOR

TRANSMITAL OF SHOP DRAWING, EQUIPMENT DATA, MATERIAL SAMPLES,

OR MANUFACTUR'S CERTIFICATE, COMPLIANCE

TRANSMITTAL #: 1

PAGE: 2 of 2

# OF ATTACHEMENTS

DATE: 00/MONTH/0000

AIR CONDITIONING SYSTEM FOR THE

CONTRACT #: ########

CRIMINAL INVESTIGATION ACADEMY (EIC) COMAYAGUA

File details come from the government source that posted it.