J-3-4_Insurance.pdf

PDF 198 KB Posted

Attached to
CNP Manual Eradication Base-Caucasia Federal contract opportunity
Solicitation number
19AQMM18R0048
Issued by
Department of State Office of Acquisition Management

About this file

Insurance

View the file

Other files for this federal contract opportunity

Other files attached to CNP Manual Eradication Base-Caucasia, newest first.
File Type Posted
A0003.pdf PDF
S01_to_S06.pdf PDF
A01.A.pdf PDF
Q&A's_19AQMM18R0048.xlsx XLSX spreadsheet
A03.A.pdf PDF
19AQMM18R0048(A002).pdf PDF
19AQMM18R0048_-_A0001.pdf PDF
J-2-3_IncidentReports.docx DOCX document
J-3-3E_Water Supply Drawings-ManErad Caucasia.pdf PDF
J-1-3_SAM_Registration.pdf PDF
J-3-2_Synopsis_MANUAL_ERADICATION_Base-Caucasia.pdf PDF
J-2-6_Bidding_Chart_ManErad_Caucasia.xlsx XLSX spreadsheet
J-2-2_Firm_and_Project_Information.docx DOCX document
J-3-3A_Architectural Drawings-ManErad Caucasia.pdf PDF
J-1-1_Past_Performance_Questionnaire_(PPQ).docx DOCX document
J-2-4_Tax_Exemption_(Exencion_de_Impuesto).doc DOC document
J-1-2_Past_Performance_and_References.xlsx XLSX spreadsheet
J-3-3C_Mechanical Drawings-ManErad Caucasia.pdf PDF
J-3-3B_Structural Drawings-ManErad Caucasia.pdf PDF
J-2-5__Submittal_Register.pdf PDF
J-3-1_Specifications_Man_Erad_Base_Caucasia.pdf PDF
SF_1442_Final.pdf PDF
J-3-3D_Electrical Drawings-ManErad Caucasia PDF
J-3-3F_Sewage Drawings-ManErad Caucasia.pdf PDF
J-2-1_Material_or_Product_Substitution_Form_Rev_1.docx DOCX document
19AQMM18R0048_Schedule_B-M.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4 ‐ INSURANCE FOR CONSTRUCTION CONTRACTS

Performance Policy (Póliza de Cumplimiento): Submitted after the contractor is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract and valid for the duration of the contract and a further two months, Payment Policy (Póliza de Pago de Salarios y Prestaciones Sociales): Submitted after the contract is signed and prior to the notice to proceed in a sum equal to 20% of the value of the contract, and valid for the duration of the contract and a further three years for the salaries and social benefits of the workers.

Liability Policy ( Póliza de Responsabilidad Civil Contractual): submitted after the contract is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract, and valid for the duration of the contract and a further two months covering contractual and Third Party Civil Liability, Stability Policy (Póliza de Estabilidad): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for three years from the date of the handover of the work/ substantial completion.

Elements Quality Policy ( Póliza de Calidad de Elementos): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion.

Correct Equipment Functioning Policy (Póliza de correcto funcionamiento de los equipos): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion

File details come from the government source that posted it.