J-2-6_Bidding_Chart_ManErad_Caucasia.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
CNP Manual Eradication Base-Caucasia Federal contract opportunity
Solicitation number
19AQMM18R0048
Issued by
Department of State Office of Acquisition Management

About this file

Bidding Chart

View the file

Other files for this federal contract opportunity

Other files attached to CNP Manual Eradication Base-Caucasia, newest first.
File Type Posted
Q&A's_19AQMM18R0048.xlsx XLSX spreadsheet
A0003.pdf PDF
S01_to_S06.pdf PDF
A01.A.pdf PDF
A03.A.pdf PDF
19AQMM18R0048(A002).pdf PDF
19AQMM18R0048_-_A0001.pdf PDF
J-3-2_Synopsis_MANUAL_ERADICATION_Base-Caucasia.pdf PDF
J-2-3_IncidentReports.docx DOCX document
J-3-3E_Water Supply Drawings-ManErad Caucasia.pdf PDF
J-1-3_SAM_Registration.pdf PDF
J-3-3D_Electrical Drawings-ManErad Caucasia PDF
J-3-3F_Sewage Drawings-ManErad Caucasia.pdf PDF
J-3-4_Insurance.pdf PDF
J-2-1_Material_or_Product_Substitution_Form_Rev_1.docx DOCX document
19AQMM18R0048_Schedule_B-M.pdf PDF
J-2-2_Firm_and_Project_Information.docx DOCX document
J-3-3A_Architectural Drawings-ManErad Caucasia.pdf PDF
J-1-1_Past_Performance_Questionnaire_(PPQ).docx DOCX document
J-2-4_Tax_Exemption_(Exencion_de_Impuesto).doc DOC document
J-1-2_Past_Performance_and_References.xlsx XLSX spreadsheet
J-3-3C_Mechanical Drawings-ManErad Caucasia.pdf PDF
J-3-3B_Structural Drawings-ManErad Caucasia.pdf PDF
J-2-5__Submittal_Register.pdf PDF
J-3-1_Specifications_Man_Erad_Base_Caucasia.pdf PDF
SF_1442_Final.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WBS

-8XXXxOFFICIAL BIDDING CHART
-7XXXxPROJECT:CNP Manual Eradication Base
-6XXXxPlace:CNP Facilities in Finca Paraguay, Caucasia, Antioquia, Colombia
-5XXXxDate:11/15/17
-4XXXx
-3XXXx
-2XXXxBASE BID
-1XXXx
StatusLinePHASEDIVSUBDIVSUBDIV ITEMITEMDESCRIPTIONMATERIAL UNITMATERIAL QUANTITYMATERIAL UNIT COSTLABOR UNITLABOR QUANTITYLABOR UNIT COSTEQUIPMENT UNITEQUIPMENT QUANTITYEQUIPMENT UNIT COSTTOTAL COSTTOTAL COST BY CHAPTER
x1AA. GENERAL REQUIREMENTS$ 0.00
x33A11GENERAL REQUIREMENTS$ 0.00
P43A101 30 0001 32 16 00 20Construction Progress Documentation$ 0.00
x44A101 30 00l$ 0.00
x45A101 30 00l
P43A101 30 0001 33 00Submittal Procedures$ 0.00
x44A101 30 00l$ 0.00
x45A101 30 00l
P49A101 50 0001 50 00Temporary Construction Facilities and Controls$ 0.00
x50A101 50 00l$ 0.00
x51A101 50 00l
P61A101 70 0001 78 00Execution and Closeout Submittals$ 0.00
x62A101 70 00l$ 0.00
x63A101 70 00l
x70BB. LODING AND ADMINISTRATIVE BUILDINGS$ 0.00
x71B22EXISTING CODITIONS$ 0.00
D72B202 41 0002 41 00Demolition$ 0.00
x73B202 41 00l$ 0.00
x74B202 41 00l
x75B33CONCRETE$ 0.00
D76B303 11 13.00 1003 11 13.00 10Stuctural Cast in place Concrete Forming$ 0.00
x77B303 11 13.00 10l$ 0.00
x78B303 11 13.00 10l
D79B303 20 00.00 1003 20 00.00 10Concrete Reinforcing$ 0.00
x80B303 20 00.00 10l$ 0.00
D82B303 30 0003 30 00Cast-in-Place Concrete$ 0.00
x83B303 30 00l$ 0.00
x84B303 30 00l
x85B44MASONRY$ 0.00
D86B404 20 0004 20 00Masonry$ 0.00
x87B404 20 00l$ 0.00
x88B404 20 00l
x89B55METALS$ 0.00
D90B505 05 2305 23.16Welding, Structural$ 0.00
x91B505 05 23l$ 0.00
x92B505 05 23l
D93B505 12 0005 12 00Structural Steel$ 0.00
x94B505 12 00l$ 0.00
x98B505 50 13l
D99B505 50 1405 50 13Metal: Miscellaneous and Fabrications$ 0.00
x100B505 50 14l$ 0.00
05 50 14Structural metal fabrications$ 0.00
$ 0.00
x101B505 50 14l
x102B66WOODS, PLASTICS AND COMPOSITES$ 0.00
D103B606 10 0006 10 00Rough Carpentry$ 0.00
x104B606 10 00l$ 0.00
x105B606 10 00l
D106B606 20 0006 20 00Finish Carpentry$ 0.00
x107B606 20 00l$ 0.00
x108B606 20 00l
x109B77THERMAL AND MOISTURE PROTECTION$ 0.00
D110B707 21 1607 41 63Fabricated Roof Panel assemblies$ 0.00
x111B707 21 16l$ 0.00
07 60 00Flashing and sheet metal$ 0.00
$ 0.00
x112B707 21 16l
D113B707 41 6307 92 00Joint Sealants$ 0.00
x114B707 41 63l$ 0.00
x115B707 41 63l
x125B88OPENINGS$ 0.00
08 11 16Aluminum doors and fames$ 0.00
x127B808 11 13l$ 0.00
x128B808 11 13l
D135B808 71 0008 51 13Aluminum Windows$ 0.00
x136B808 71 00l$ 0.00
x137B808 71 00l
D138B808 81 0008 71 00Door Hardware$ 0.00
x139B808 81 00l$ 0.00
x140B808 81 00l
D141B808 91 0008 81 00Glazing$ 0.00
x142B808 91 00l$ 0.00
08 87 23.13Safety Films$ 0.00
$ 0.00
x143B808 91 00l
x144B99FINISHES$ 0.00
D145B909 06 9009 06 90Color Schedule$ 0.00
x146B909 06 90l$ 0.00
09 24 23Stucco$ 0.00
$ 0.00
x147B909 06 90l
09 26 00Veneer Plaster$ 0.00
x155B909 30 00l$ 0.00
09 29 00Fiber Cement Ceiling$ 0.00
$ 0.00
x156B909 30 00l
09 30 00Ceramic, Quarry and Marbel Retail Tile$ 0.00
$ 0.00
x156B909 30 00l
D160B909 90 0009 90 00Paints and Coatings$ 0.00
x161B909 90 00l$ 0.00
09 96 00High Performance Coatings$ 0.00
$ 0.00
x162B909 90 00l
x163B1010SPECIALTIES$ 0.00
D167B1010 28 1310 14 00.20Interior Signage$ 0.00
x168B1010 28 13l$ 0.00
x169B1010 28 13l
D167B1010 28 1310 28 13Toilet Accessories$ 0.00
x168B1010 28 13l$ 0.00
x169B1010 28 13l
D170B1010 44 1610 44 16Fire Extinguishers$ 0.00
x194B1313 48 00l$ 0.00
12FURNISHINGS$ 0.00
12 36 00Countertops$ 0.00
$ 0.00
13SPECIAL CONSTRUCTION$ 0.00
13 48 00Siesmic Protection Miscellaneous Equipment$ 0.00
$ 0.00
x196B2222PLUMBING$ 0.00
D197B2222 00 0022 00 00Plumbing, General Purpose$ 0.00
x198B2222 00 00l$ 0.00
x199B2222 00 00l
x200B2323HEATING, VENTILATING, AND AIR CONDITIONING$ 0.00
D201B2323 00 0023 00 00Air Supply, Distribution, Ventilation and Exhaust Systems$ 0.00
x202B2323 00 00l$ 0.00
x203B2323 00 00l
D216B2323 34 23.00 4023 03 00.00 20BASIC MECHANICAL MATERIALS AND METHODS$ 0.00
x217B2323 34 23.00 40l$ 0.00
23 05 48.00 40VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT$ 0.00
$ 0.00
23 07 00THERMAL INSULATION FOR MECHANICAL SYSTEMS$ 0.00
$ 0.00
23 23 00REFRIGERANT PIPING$ 0.00
$ 0.00
23 81 00.00 20UNITARY AIR CONDITIONING EQUIPMENT$ 0.00
$ 0.00
x225B2626Electrical$ 0.00
D226B2626 20 0026 00 00.00 20Basic Electrical Materials and Methods$ 0.00
x227B2626 20 00l$ 0.00
x228B2626 20 00l
D226B2626 20 0026 05 00.00 40Common Work Results for Electrical$ 0.00
x227B2626 20 00l$ 0.00
26 05 19.00 10INSULATED WIRE AND CABLE$ 0.00
$ 0.00
26 05 71.00 40LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES$ 0.00
$ 0.00
26 08 00APPARATUS INSPECTION AND TESTING
$ 0.00
D226B2626 20 0026 09 13Power Monitoring System$ 0.00
$ 0.00
26 09 23.00 40LIGHTING CONTROL DEVICES$ 0.00
x227B2626 20 00l$ 0.00
D226B2626 20 0026 20 00Interior Distribution System$ 0.00
x227B2626 20 00l$ 0.00
D226B2626 20 0026 24 16.00 40Panelboards$ 0.00
$ 0.00
26 28 01.00 10COORDINATED POWER SYSTEM PROTECTION$ 0.00
x227B2626 20 00l$ 0.00
D235B2626 32 33.00 1026 33 53.00 20Uninterruptible Power Supply (UPS) System$ 0.00
x236B2626 32 33.00 10l$ 0.00
x237B2626 32 33.00 10l
D235B2626 32 33.00 1026 41 01.00 40Lightning Protection System$ 0.00
x236B2626 32 33.00 10l$ 0.00
x237B2626 32 33.00 10l
D238B2626 51 00.00 4026 51 00Lighting$ 0.00
x239B2626 51 00.00 40l$ 0.00
x240B2626 51 00.00 40l
x244B2727Communications$ 0.00
P245B2727 10 0027 10 00Building Telecommunications Cabling System$ 0.00
x246B2727 10 00l$ 0.00
x247B2727 10 00l
x252CC. EXTERIOR WORKS$ 0.00
x253C3131Earthwork$ 0.00
D254C3131 00 0031 00 00Earthwork$ 0.00
x255C3131 00 00l$ 0.00
x256C3131 00 00l
D257C3131 11 0031 11 00Clearing and Grubbing$ 0.00
x258C3131 11 00l$ 0.00
x259C3131 11 00l
D260C3131 23 00.00 2031 23 00.00 20Excavation and Fill$ 0.00
x261C3131 23 00.00 20l$ 0.00
31 60 00Foundation Preparation$ 0.00
$ 0.00
x262C3131 23 00.00 20l
x270C3232Exterior Improvements$ 0.00
D257C3131 11 0032 16 13Concrete Sidewalks and Curbs and Gutters$ 0.00
x258C3131 11 00l$ 0.00
x259C3131 11 00l
D271C3232 92 2332 92 23Sodding$ 0.00
x272C3232 92 23l$ 0.00
x273C3232 92 23l
x274C3333Utilities$ 0.00
P275C3333 11 0033 11 00Water Distribution$ 0.00
x276C3333 11 00l$ 0.00
x277C3333 11 00l
P278C3333 30 0033 30 00Sanitary Sewer$ 0.00
x279C3333 30 00l$ 0.00
x280C3333 30 00l
D281C3333 40 0033 40 00Storm Drainage Utilities$ 0.00
x282C3333 40 00l$ 0.00
x283C3333 40 00l
D287C3333 71 01.00 4033 71 02Underground Electrical and Telecomunications Distribution$ 0.00
x288C3333 71 01.00 40l$ 0.00
x289C3333 71 01.00 40l
x290DD. MARKUPS$ 0.00
x291DDDTOTAL DIRECT COST PHYSICAL ADECUATION WORKS$ 0.00
x292DDDAdministration%$ 0.00
x294DDDProfit%$ 0.00
x295DDDTAX(Over the profit value)%$ 0.00
DBA Insurance
x296DTTOTAL COSTS (Base bid) $$ 0.00
pSpec Pending
DSpec Done
PUSpec Pending Update
xN/A

CNP Manual Erad Base Page &P of &N Finca Paraguay, Caucasia, Antioquia