J-3-2_Synopsis_MANUAL_ERADICATION_Base-Caucasia.pdf

PDF 68 KB Posted

Attached to
CNP Manual Eradication Base-Caucasia Federal contract opportunity
Solicitation number
19AQMM18R0048
Issued by
Department of State Office of Acquisition Management

About this file

Synopsis

View the file

Other files for this federal contract opportunity

Other files attached to CNP Manual Eradication Base-Caucasia, newest first.
File Type Posted
Q&A's_19AQMM18R0048.xlsx XLSX spreadsheet
A0003.pdf PDF
S01_to_S06.pdf PDF
A01.A.pdf PDF
A03.A.pdf PDF
19AQMM18R0048(A002).pdf PDF
19AQMM18R0048_-_A0001.pdf PDF
J-3-3D_Electrical Drawings-ManErad Caucasia PDF
J-3-3F_Sewage Drawings-ManErad Caucasia.pdf PDF
J-3-4_Insurance.pdf PDF
J-2-1_Material_or_Product_Substitution_Form_Rev_1.docx DOCX document
19AQMM18R0048_Schedule_B-M.pdf PDF
J-2-3_IncidentReports.docx DOCX document
J-3-3E_Water Supply Drawings-ManErad Caucasia.pdf PDF
J-1-3_SAM_Registration.pdf PDF
J-2-6_Bidding_Chart_ManErad_Caucasia.xlsx XLSX spreadsheet
J-2-2_Firm_and_Project_Information.docx DOCX document
J-3-3A_Architectural Drawings-ManErad Caucasia.pdf PDF
J-1-1_Past_Performance_Questionnaire_(PPQ).docx DOCX document
J-2-4_Tax_Exemption_(Exencion_de_Impuesto).doc DOC document
J-1-2_Past_Performance_and_References.xlsx XLSX spreadsheet
J-3-3C_Mechanical Drawings-ManErad Caucasia.pdf PDF
J-3-3B_Structural Drawings-ManErad Caucasia.pdf PDF
J-2-5__Submittal_Register.pdf PDF
J-3-1_Specifications_Man_Erad_Base_Caucasia.pdf PDF
SF_1442_Final.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CNP MANUAL ERADICATION BASE CAUCASIA

The U.S. Embassy, International Narcotics and Law Enforcement section (INL) Bogotá, Colombia has a requirement for the Construction of three (3) buildings for the Colombian National Police (CNP) Facilities in Finca Paraguay, Caucasia (Antioquia) Colombia.

The project consists in the construction three (3) buildings for the Colombian National Police (CNP) for the Colombian National Police (CNP) Facilities in Finca Paraguay, Caucasia (Antioquia) Colombia to support the INL Manual Eradication program. The construction shall include the use of quality materials that are capable of withstanding tropical rainy climate.

The buildings have a length of 18.45 m, a width of 14.05 m, and total height of 3.00 m above finish floor; the structural system chosen for this building corresponds to reinforced masonry wall. The lightweight roof system is supported by purlins which are supported over concrete beam, supported over reinforced masonry wall. The foundation of the building consists in concrete cyclopean and footings. Also this facility shall have electrical, hydraulic and sewage utilities and internal installations, doors, door hardware, air conditioning, sanitary fittings, underground water tank, generator and finishes as indicated in the attached drawings. The building shall comply with the current standards of the Colombian Seismic Resistance Code (NSR Standard, 10).

The contractor shall be responsible for transportation, meals and lodging of the construction team on the work site (away from the project site), or as arranged with the CNP personnel. The contractor shall have a representative at the work site to receive materials, which shall be responsible for unloading materials and transporting it to the actual work site.

Place of Performance: Colombian National Police Finca Paraguay DIRAN CNP Facilities located in the city of Caucasia, Antioquia, Colombia. It is located at the northwest part of the country in the Atlantic Coast region, 7°59′N 75°12′W. It is located 693 Km from Bogota, capital city of Colombia, and can be accessed through commercial flights and by road. The elevation 150 m. (477 ft.) above sea level and the weather is dry.

File details come from the government source that posted it.