Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 31 PAGES
CNP Manual Erradication Lodging and Administrative PSIBs
01 11 00 SD-01 Preconstruction Submittals Submittal Register Performance insurance (Poliza de Cumplimiento):
Payment insurance (Poliza de Pagos de Salarios y Prestaciones Sociales:
Liability insurance (Poliza de Responsabilidad Civil Extracontractual):
Stability insurance (Poliza de Estabilidad):
Elements Quality insurance (Poliza de Calidad de Elementos):
Correct Equipment Functioning insurance (Poliza de Correcto funcionamiento de los Equipos):
Project Schedule Temporary Facilities Personnel List Field Personnel Qualifications Health and Safety Plan Quality Control (QC) Plan List of Proposed Subcontractors List of Proposed Products
01 32 16.00 20 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 31 PAGES
01 32 16.00 20 1.3Construction schedule Submittal Register
01 33 00 SD-01 Preconstruction Submittals 1.7Submittal Register
01 50 00 SD-01 Preconstruction Submittals 1.3Construction site plan
01 78 00 SD-03 Product Data As-Built Record of Equipment and Materials
1.6.1Warranty Management Plan 1.6.4Warranty Tags
Spare Parts Data SD-08 Manufacturer’s Instructions
1.5Preventative Maintenance 1.5Condition Monitoring (Predictive
Testing) 1.5Inspection 1.6.1Instructions
SD-10 Operation and Maintenance Data
1.7Operation and Maintenance Manuals
SD-11 Closeout Submittals 1.4.1Record Drawings
02 41 00 SD-01 Preconstruction Submittals
1.8 GExisting Conditions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 31 PAGES
02 41 00 SD-07 Certificates
1.2.1 GDemolition Plan
1.6 GNotification
03 11 13.00 10 SD-02 Shop Drawings
3.1.1 GFormwork
SD-03 Product Data 1.2Design 2.1Form Materials 2.1.6Form Releasing Agents
SD-04 Samples
1.4 GSample Panels
SD-06 Test Reports 3.5Inspection
3.4.1 GFormwork Not Supporting Weight
of Concrete SD-07 Certificates Fiber Voids
03 20 00.00 10 SD-02 Shop Drawings 3.1Reinforcement
SD-03 Product Data 1.3.1Welding
Material SD-04 Samples Reinforcement Bars
SD-06 Test Reports Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 31 PAGES
03 20 00.00 10 Tests, Inspections, and Verifications
SD-07 Certificates 2.3Reinforcing Steel
03 30 00 SD-02 Shop Drawings 1.6.2.1Fabrication Drawings 1.6.2.2Formwork 1.6.2.2Formwork 1.6.2.1Special Construction 1.6.2.3Reinforcing steel
SD-03 Product Data 2.4.7Materials for curing concrete 2.4.9Joint sealants 2.4.8Joint filler 2.4.1Cement 2.4.1.1Portland Cement 2.3.2Ready-Mix Concrete 2.4.6Vapor barrier 2.6Bonding Materials 2.3.3Concrete Curing Materials 2.5Reinforcement 1.6.2.1Reinforcement Materials 2.4.10Epoxy bonding compound 2.4.9.3Waterstops 3.13.2Waterstops 2.1.1Wood Forms
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 31 PAGES
03 30 00 2.4.11Biodegradable Form Release Agent
SD-04 Samples 1.6.5.1Slab finish sample 2.4.9.3Dumbbell Type 2.4.9.3Rubber 2.4.9.3Polyvinylchloride (PVC)
SD-05 Design Data 2.3.1mix design 1.6.1.1Calculations
SD-06 Test Reports 1.6.4.1Concrete mix design 1.6.4.2Aggregates
Tolerance report 3.11.2.3Compressive strength tests 2.7.4Slump 2.7.1Air Entrainment
SD-07 Certificates 1.6.3.1Curing concrete elements 1.6.3.3Finishing plan 1.6.3.6Material Safety Data Sheets 2.5.5Steel Bar
04 20 00 SD-02 Shop Drawings 1.4.4Detail Drawings
SD-03 Product Data 2.4.2Cement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 31 PAGES
04 20 00 2.5Water-Repellant Admixture SD-04 Samples
2.2Concrete Masonry Units (CMU) 2.7Anchors, Ties, and Bar
Positioners 2.10Expansion-Joint Materials 2.8Joint Reinforcement 1.4.2Portable Panel
SD-05 Design Data 2.4.3Pre-mixed Mortar 1.2.1.1Unit Strength Method
SD-06 Test Reports 3.15.1Field Testing of Mortar 3.15.2Field Testing of Grout 3.15.3Prism tests 1.4.3Masonry Inspector Qualifications 3.15.4Single-Wythe Masonry Wall
Water Penetration Test SD-07 Certificates
2.2Concrete Masonry Units (CMU) 2.4.1Admixtures for Masonry Mortar
05 05 23 SD-03 Product Data 1.5Welding Procedure Qualifications 1.5.5Welder, Welding Operator, and
Tacker Qualification 1.5.6Inspector Qualification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 31 PAGES
05 05 23 1.5.2Previous Qualifications 1.5.3Pre-qualified Procedures
SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination 1.5.1Certified Welding Procedure
Specifications (WPS) 1.5.1Certified Procedure Qualification
Records (PQR) 1.5.1Certified Welder Performance
Qualifications (WPQ) 05 12 00 SD-02 Shop Drawings
1.5.2.1Erection Plan 1.5.1Fabrication drawings
SD-03 Product Data 2.4Shop primer 2.3.1Welding electrodes and rods 2.2.5Load indicator washers
SD-06 Test Reports 2.4Class B coating 2.2Bolts, nuts, and washers
SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 1.5.2.2Welding procedures and qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 31 PAGES
05 50 13 SD-02 Shop Drawings 2.7structural steel door frames 2.3Access doors and panels 2.4Cover plates and frames
SD-03 Product Data 2.3Access doors and panels 2.4Cover plates and frames
Control-joint covers 2.7Structural steel door frames
05 50 14 SD-02 Shop Drawings 1.3.2Detail Drawings
SD-03 Product Data 2.2.2.1Welding of Structural Steel 2.3.4Structural Steel Welding Repairs
Materials Orders 2.1.1Materials List
Shipping Bill SD-06 Test Reports
2.3Tests, Inspections, and Verifications
SD-07 Certificates 1.3.1Qualification of Welders and
Welding Operators 06 20 00 SD-02 Shop Drawings
1.3Detail Drawings SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 31 PAGES
06 20 00 2.1.13Siding
2.1.13.9Epoxy-Aggregate Panels 2.1.13.7Wood
SD-04 Samples 2.1.13Siding
2.4Wood Shingles 2.1.13.9Moldings 2.3Fascias and Trim
SD-07 Certificates 1.4Certificates of grade 1.4Certificates of compliance
07 41 63 SD-01 Preconstruction Submittals 1.5.1Qualification of Manufacturer 1.5.3Qualification of Manufacturer 1.5.1Qualification of Installer
SD-02 Shop Drawings 1.5.1Roofing Panels 1.5.1Flashing and Accessories 1.5.1Gutter/Downspout Assembly
SD-03 Product Data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes 1.5.1Closure Materials 1.5.1Insulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 31 PAGES
07 41 63 1.5.1Pressure Sensitive Tape 1.5.1Sealants and Caulking 1.5.1Galvanizing Repair Paint 1.5.1Aluminized Steel Repair Paint 1.5.1Accessories
SD-04 Samples 1.5.1Roofing Panels 2.2.2Fasteners 2.4.1Metal Closure Strips 1.5.1Insulation 1.5.1Manufacturer s color charts and chips SD-05 Design Data
1.5.1Wind design analysis SD-07 Certificates
2.2.2Fasteners 1.5.1Enamel Repair Paint
SD-08 Manufacturer’s Instructions 1.5.1Installation of Roof panel assemblies SD-11 Closeout Submittals
1.8Warranty 1.5.1Instructions 1.5.1Material Safety Data Sheets
07 60 00 SD-02 Shop Drawings 3.1.7Gutters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 31 PAGES
07 60 00 3.1.8Downspouts 3.1.11Flashing at roof penetrations 3.1.9Eave flashing
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates 3.3.6Sealant
08 11 16 SD-04 Samples 1.5.1.1Finish sample
SD-08 Manufacturer’s Instructions 2.1Doors and frames
08 51 13 SD-03 Product Data 2.2Windows 2.3.8.1Hardware 2.3.3Fasteners 1.9Window Performance 2.5Mullions 2.3.10Screens 2.3.2Weatherstripping 2.3.8Accessories 2.3.4Adhesives
SD-04 Samples 1.3.1.1Finish Sample
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 31 PAGES
08 51 13 1.3.1.2Window Sample SD-10 Operation and Maintenance Data
2.2Windows 08 71 00 SD-03 Product Data
2.1Hardware Items SD-08 Manufacturer’s Instructions
3.1Installation SD-11 Closeout Submittals
1.3.1Key Bitting 08 81 00 SD-01 Preconstruction Submittals
Installation SD-02 Shop Drawings Glass
1.3Glazing Accessories SD-03 Product Data
2.3.2Glazing Compound 2.3.4Tape 2.3.3.1Sealant
SD-05 Design Data 2.3Setting and Sealing Materials 3.2Glass Setting
08 87 23.13 SD-03 Product Data 2.2Fragment Retention Film 3.3Cleaning
09 06 90 SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 31 PAGES
09 06 90 2.2Color Schedule 09 24 23 SD-02 Shop Drawings
3.2Lath SD-03 Product Data
3.4Proportions and Mixing SD-04 Samples
2.2Colored Stucco Finish Coat 1.3Sample Panel
09 26 00 SD-03 Product Data 2.1.4Gypsum base 2.1.5Gypsum veneer plaster
09 29 00 SD-03 Product Data 2.1.3Water-Resistant Gypsum
Backing Board 2.1.1Gypsum Board 2.1.7Accessories
SD-07 Certificates 2.1Asbestos Free Materials
SD-08 Manufacturer’s Instructions Material Safety Data Sheets
SD-10 Operation and Maintenance Data Manufacturer maintenance instructions
Waste Management SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 31 PAGES
09 29 00 2.1.1Gypsum Board Adhesives
09 30 00 SD-02 Shop Drawings 1.4Detail Drawings
SD-03 Product Data 2.1Tile 2.2Setting-Bed 2.4Mortar, Grout, and Adhesive
Certification SD-04 Samples
2.1Tile Accessories Marble Thresholds
2.4Grout SD-07 Certificates
2.1Tile 2.4Mortar, Grout, and Adhesive
09 90 00 SD-02 Shop Drawings 3.11Piping identification 3.11stencil
SD-03 Product Data Certification
2.1Coating 2.1Manufacturer's Technical Data
Sheets SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 31 PAGES
09 90 00 1.9Color 1.4.2Textured Wall Coating System 1.4.3Sample Textured Wall Coating
System Mock-Up SD-07 Certificates Applicator's qualifications Qualification Testing
SD-08 Manufacturer’s Instructions Application instructions
3.7.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1Coatings:
09 96 00 SD-01 Preconstruction Submittals
1.3Material, Equipment and Fixture List
SD-03 Product Data Heat-Resistant Coatings
2.1Epoxy Coatings 2.2Polyurethane Coatings
Chlorinated-Rubber Coatings SD-04 Samples
1.3Color Chips SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 31 PAGES
09 96 00 2.1Epoxy Coatings 2.2Polyurethane Coatings
10 14 00.20 SD-02 Shop Drawings Detail Drawings
SD-03 Product Data 3.1Installation
SD-04 Samples Interior Signage
SD-10 Operation and Maintenance Data
3.1Approved Manufacturer's Instructions
3.1.2Protection and Cleaning 10 28 13 SD-03 Product Data
2.1.2Finishes 2.2Accessory Items
SD-04 Samples 2.1.2Finishes 2.2Accessory Items
SD-07 Certificates 2.2Accessory Items
10 44 16 SD-02 Shop Drawings 2.1Fire Extinguishers
Accessories 2.4Cabinets 2.5Wall Brackets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 31 PAGES
10 44 16 SD-03 Product Data 2.1Fire Extinguishers
Accessories 2.5Wall Brackets
SD-04 Samples 2.1Fire Extinguisher 2.5Wall Brackets
Accessories SD-07 Certificates
2.1Fire Extinguishers 2.1Manufacturer's Warranty with
Inspection Tag 12 36 00 SD-02 Shop Drawings
2.3Fabrication 3.1Installation Drawings
SD-03 Product Data In situ polishedGranite material components
Tile SD-04 Samples
2.3Countertop 2.3Backsplash, Bronce Counter top joints Manufacturer's Standard Color Charts
2.2Filler Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 31 PAGES
12 36 00 SD-08 Manufacturer’s Instructions Manufacturer's Instructions
13 48 00 SD-03 Product Data 3.1Bracing 1.3Equipment Requirements
22 00 00 SD-02 Shop Drawings 3.6.1Plumbing System
SD-03 Product Data 2.4Fixtures 2.4.2Flush valve urinals 2.4.3Flush tank water closets
Wall hung lavatories 2.4.4Countertop lavatories
Kitchen sinks Service sinks Water heaters Shower Faucets
3.6.1Plumbing System SD-06 Test Reports
3.6Tests, Flushing and Disinfection SD-07 Certificates
1.3Materials and Equipment 2.1.1Bolts
SD-10 Operation and Maintenance Data
3.6.1Plumbing System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 31 PAGES
23 00 00 SD-02 Shop Drawings 1.4.5Detail Drawings
SD-03 Product Data Air Vents, Penthouses, and Goosenecks
Ceiling Exhaust Fans Air Handling Units
2.10.1Room Fan-Coil Units Test Procedures Diagrams
SD-06 Test Reports 3.8Performance Tests
SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation
Instructions 3.9.2Operation and Maintenance
Training SD-10 Operation and Maintenance Data
3.9.1Operation and Maintenance Manuals
23 05 48.00 40 SD-02 Shop Drawings 1.2Installation Drawings 1.2Outline Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 31 PAGES
23 05 48.00 40 1.2Equipment and Performance Data
2.3Isolators SD-06 Test Reports Type of Isolator Type of Base Allowable Deflection Measured Deflection
23 07 00 SD-03 Product Data Pipe Insulation Systems
SD-08 Manufacturer’s Instructions Pipe Insulation Systems
23 23 00 SD-02 Shop Drawings 2.3Refrigerant Piping System
SD-03 Product Data 2.3Refrigerant Piping System 3.5Refrigerant Piping Tests 3.4Demonstrations 3.1Verification of Dimensions
SD-06 Test Reports 3.5Refrigerant Piping Tests
SD-10 Operation and Maintenance Data
1.5Maintenance 3.4Operation and Maintenance
Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 31 PAGES
23 81 00.00 20 SD-02 Shop Drawings 2.5.2Field-assembled refrigerant piping 1.4.2Control system wiring diagrams
SD-03 Product Data 2.2Air conditioners 2.5Refrigerant piping and accessories 2.3Coatings for finned tube coils
SD-06 Test Reports 3.8.3Start-up and initial operational tests SD-08 Manufacturer’s Instructions
2.1Room air conditioners 2.2Air conditioners 2.5Refrigerant piping and accessories SD-10 Operation and Maintenance Data
2.1Room air conditioners 2.2Air conditioners
SD-11 Closeout Submittals 1.4.4Posted operating instructions
26 05 00.00 40 SD-01 Preconstruction Submittals 2.1Material, Equipment, and Fixture
Lists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 31 PAGES
26 05 00.00 40 SD-03 Product Data 2.1.1Conduits and Raceways 2.1.3Wire and Cable 3.2.1.9Splices and Connectors 2.1.4Switches 2.1.5Receptacles 2.1.6Outlets, Outlet Boxes, and Pull
Boxes 2.1.8Circuit Breakers 2.1.7Panelboards 2.1.9Lamps and Lighting Fixtures 2.1.12Dry-Type Distribution
Transformers SD-06 Test Reports
3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test
SD-07 Certificates 1.4Certification
SD-08 Manufacturer’s Instructions Part 2Manufacturer's Instructions
26 05 19.00 10 SD-03 Product Data 3.1Installation Instructions
SD-06 Test Reports 3.2Tests, Inspections, and
Verifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 31 PAGES
26 05 71.00 40 SD-02 Shop Drawings 3.1Protective Devices
SD-03 Product Data 2.2Enclosures 2.3Circuit Breakers 3.1Control Devices 2.7Indicating Instruments
SD-06 Test Reports 3.2Dielectric Tests 3.2Final Test Reports
SD-08 Manufacturer’s Instructions 3.1Protective Devices
SD-10 Operation and Maintenance Data
2.3Circuit Breakers 26 08 00 SD-06 Test Reports
3.1Acceptance tests and inspections 1.4.3Acceptance test and inspections procedure 26 09 23.00 40 SD-03 Product Data
2.1.1Photoconductive Control Devices 3.1Installation Drawings 2.1.1Light-Sensitive Control Devices
Lighting Contactor 2.2.2Photocell Switch 2.2.3Occupancy Sensors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 31 PAGES
26 09 23.00 40 1.3Motion Sensors SD-06 Test Reports
3.2System Operation Tests 26 20 00 SD-02 Shop Drawings
2.14Panelboards 2.17Transformers 2.4Busway 2.5Cable trays 2.24Wireways 3.1.10.1Marking strips
SD-03 Product Data 2.13Receptacles 2.14.3Circuit breakers 2.11Switches 2.17Transformers 2.15Enclosed circuit breakers
CATV outlets 2.20.3Grounding Busbar 2.25Surge protective devices
SD-06 Test Reports 3.5.2600-volt wiring test 3.5.5Grounding system test 3.5.3Transformer tests 3.5.4Ground-fault receptacle test
SD-09 Manufacturer’s Field Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 31 PAGES
26 20 00 2.27.1Transformer factory tests 26 24 16.00 40 SD-02 Shop Drawings
2.1.1Detail Drawings 2.1.1Outline Drawings
SD-03 Product Data 1.3Panelboards 2.1.1Panelboards
SD-06 Test Reports 3.2Continuity Tests 3.2Insulation Tests
SD-07 Certificates 1.4Statements
SD-08 Manufacturer’s Instructions 1.3Panelboards 2.1.1Panelboards
26 28 01.00 10 SD-03 Product Data 2.10Fault Current Analysis 2.10Protective Device Coordination
Study 2.1Equipment 1.4.1System Coordinator 3.3.5Protective Relays 3.2Installation
SD-06 Test Reports 3.3Field Testing
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 31 PAGES
26 28 01.00 10 1.6Devices and Equipment 26 33 53.00 20 SD-02 Shop Drawings
1.6.1UPS Drawings 1.6.2UPS Installation
SD-03 Product Data 2.3UPS Module 2.9Factory Testing 2.2UPS System
Spare Parts SD-06 Test Reports
1.6.4Factory Test Plan 1.6.5Performance Test Plan 2.9Factory Tests 1.6.7Performance Tests Report 1.6.6Factory Tests Report
SD-09 Manufacturer’s Field Reports
3.2.2Initial Inspection and Tests 3.2.3Performance Tests
SD-10 Operation and Maintenance Data
1.10.1UPS Operation and Maintenance SD-11 Closeout Submittals
3.1Installation 26 41 00.00 40 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 31 PAGES
26 41 00.00 40 1.4.1Overall lightning protection system
1.4.1Each major component SD-03 Product Data
2.2.1Air Terminals 2.3Main and Secondary Conductors 2.2.2Ground Rods 2.4Clamp-Type Connectors 2.5Lightning Protection Components 2.1Hardware 2.1Accessories
SD-06 Test Reports 3.6.1Grounding system test 3.6.2Lightning protection system inspection SD-07 Certificates UL listing or label or Equivalent
3.6.3Certificates 26 51 00 SD-03 Product Data
LED lighting fixtures LED lamps
2.7Lighting contactor 2.8Photocell switch 2.10LED Exit signs
LED Emergency lighting equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 31 PAGES
26 51 00 2.12Occupancy sensors SD-06 Test Reports
3.2Operating test 27 10 00 SD-02 Shop Drawings
1.6.1.1Telecommunications drawings 1.6.1.2Telecommunications Space
Drawings SD-03 Product Data
2.4Telecommunications cabling 2.5.6Patch panels 2.6Telecommunications outlet/connector assemblies 2.5.3Equipment support frame
SD-06 Test Reports 3.5.1Telecommunications cabling testing SD-07 Certificates
1.6.2.1Telecommunications Contractor 1.6.2.3Manufacturer Qualifications 1.6.3Test plan
SD-10 Operation and Maintenance Data
1.10.1Telecommunications cabling and pathway system
SD-11 Closeout Submittals 1.10.2Record Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 31 PAGES
31 00 00 SD-01 Preconstruction Submittals
3.5 GShoring
SD-03 Product Data 3.9Utilization of Excavated Materials
SD-06 Test Reports 3.17Testing 2.1Borrow Site Testing
SD-07 Certificates 3.17Testing
31 11 00 SD-03 Product Data 3.6.1Nonsaleable Materials
31 23 00.00 20 SD-06 Test Reports 1.6Borrow Site Testing 3.11.2.1Fill and backfill 3.11.2.2Select material 3.11.2.3Porous fill 3.11.2.4Density tests 3.11.2.5Moisture Content Tests
31 60 00 SD-03 Product Data 3.2.1.1Tools
32 16 13 SD-03 Product Data 2.1Concrete
SD-06 Test Reports 3.8Field Quality Control
32 92 23 SD-03 Product Data 2.3Fertilizer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 31 PAGES
32 92 23 SD-06 Test Reports Topsoil composition tests
SD-07 Certificates 2.1sods
33 11 00 SD-03 Product Data 2.1.1Piping Materials 2.1Water distribution main 2.2Water service line
Corporation stops 2.1.2.2Valve boxes 2.2.2.2Valve boxes
SD-06 Test Reports 2.2.2.4Disinfection
SD-07 Certificates 2.1Water distribution main 2.2Water service line
Displacement Type Meters Compound Type Meters
SD-08 Manufacturer’s Instructions 1.3Delivery, storage, and handling
Installation 33 30 00 SD-01 Preconstruction Submittals
Existing Conditions SD-02 Shop Drawings
1.4.1Drawings 2.3.1Precast concrete manhole
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 31 PAGES
33 30 00 2.3.3.1Frames, covers, and gratings SD-03 Product Data
2.1Pipeline materials SD-06 Test Reports
2.4Reports SD-07 Certificates Gaskets
33 40 00 SD-03 Product Data 3.3Placing Pipe
SD-04 Samples 2.1Pipe for Culverts and Storm
Drains SD-07 Certificates
2.1.1Resin Certification 3.7Pipeline Testing 3.6.5Determination of Density 2.3.5Frame and Cover for Gratings
33 71 02 SD-03 Product Data Low voltage cable Low voltage cable terminations Sealing Material
2.11.2Manhole frames and covers 2.11.3Handhole frames and covers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR