Addl_Questions_and_Answers_Received.pdf
PDF 72 KB Posted
- Attached to
- Falcon Power Plant Gates Maintenance and Repairs
- Solicitation number
- 191BWC19R0007
About this file
Additional Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| headgate4.pdf | ||
| headgate2.pdf | ||
| Draf_Tube_Gate.pdf | ||
| Headgate_1.pdf | ||
| headgate3.pdf | ||
| headgate5.pdf | ||
| headgate7.pdf | ||
| headgate8.pdf | ||
| headgate6.pdf | ||
| 0001.pdf | ||
| Questions_and_Answers_Received_Against_191BWC19R0007.pdf | ||
| 191BWC19R0007.pdf | ||
| Wage_Determination_2015-5309_Rev_9_06062019.pdf | ||
| PWS__Falcon_Plant_Gates_Maintenance___Repairs_rev2.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Received Against 191BWC19R0007 Falcon Power Plant Gates Maintenance and Repairs
1. Please explain what is broken on the guides, how many guides need to be repaired, and how you want them repaired.
Only One Penstock gate needs to be inspected and repaired if necessary, for this project All 3 draft tube gates need to be inspected and repaired if necessary, for this project
2. Are the rubber seals being replaced on all 4 penstock gates and all 3 draft tube gates?.
Only One Penstock gate needs to be inspected and repaired if necessary, for this project all 3 draft tube gates need to be inspected and repaired if necessary, for this project
3. Who is supplying the new seals and do the fasteners need to be replaced and if so, who will supply the fasteners?
We supply seals and fasteners for the draft tube gates (3). Contractor supplies seals and fasteners for the Penstock Gate (1