Addl_Questions_and_Answers_Received.pdf

PDF 72 KB Posted

Attached to
Falcon Power Plant Gates Maintenance and Repairs
Solicitation number
191BWC19R0007
Issued by

About this file

Additional Questions and Answers

View the file

Other files

File Type Posted
headgate4.pdf PDF
headgate2.pdf PDF
Draf_Tube_Gate.pdf PDF
Headgate_1.pdf PDF
headgate3.pdf PDF
headgate5.pdf PDF
headgate7.pdf PDF
headgate8.pdf PDF
headgate6.pdf PDF
0001.pdf PDF
Questions_and_Answers_Received_Against_191BWC19R0007.pdf PDF
191BWC19R0007.pdf PDF
Wage_Determination_2015-5309_Rev_9_06062019.pdf PDF
PWS__Falcon_Plant_Gates_Maintenance___Repairs_rev2.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Received Against 191BWC19R0007 Falcon Power Plant Gates Maintenance and Repairs

1. Please explain what is broken on the guides, how many guides need to be repaired, and how you want them repaired.

Only One Penstock gate needs to be inspected and repaired if necessary, for this project All 3 draft tube gates need to be inspected and repaired if necessary, for this project

2. Are the rubber seals being replaced on all 4 penstock gates and all 3 draft tube gates?.

Only One Penstock gate needs to be inspected and repaired if necessary, for this project all 3 draft tube gates need to be inspected and repaired if necessary, for this project

3. Who is supplying the new seals and do the fasteners need to be replaced and if so, who will supply the fasteners?

We supply seals and fasteners for the draft tube gates (3). Contractor supplies seals and fasteners for the Penstock Gate (1