Prebid_Handouts.pdf

PDF 1 MB Posted

Attached to
Vado West Floodplain Repair Federal contract opportunity
Solicitation number
191BWC19B0002
Issued by
International Boundary and Water Commission U.S.-Mexico

About this file

Pre Bid Handouts

View the file

Other files for this federal contract opportunity

Other files attached to Vado West Floodplain Repair, newest first.
File Type Posted
191BWC19B0002_0004.pdf PDF
A004_191BWC19B0002_Vado_Specs_20190909.pdf PDF
Questions_and_Answers_Received_Against_191BWC19B0002.pdf PDF
191BWC19B0002_0003.pdf PDF
Prebid_Sign_In_Sheets.pdf PDF
191BWC19B0002_Vado_Specs_20190827.pdf PDF
191BWC19B0002_0002.pdf PDF
191BWC19B0002_001.pdf PDF
J_11_191BWC19B0002_IBWC_Form_245A.pdf PDF
J_01_191BWC19B0002_Vado_Specs_20190812.pdf PDF
J_02_191BWC19B0002_Vado_Drawings_20190808_HS.pdf PDF
J_12_191BWC19B0002_IBWC_Form_245B.pdf PDF
191BWC19B0002_Vado_West.pdf PDF
J_07_IBWC_Form_110.pdf PDF
J_04_DOCS-00-31-24.zip ZIP file
J_08_IBWC_Form_116.pdf PDF
J_05_DOCS-00-31-32.zip ZIP file
J_03_DOCS-00-31-19.zip ZIP file
J_09_IBWC_Form_117.pdf PDF
J_02_191BWC19B0002_Vado_Drawings_20190808_FS.pdf PDF
J_06_NM20190039_Wage_Decision.pdf PDF
J_10_191BWC19B0002_IBWC_Form_245.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

191BWC19B0002 Page 1 of 2 Vado West Floodplain Repair

191BWC19B0002

Prebid Conference

Meeting Date: August 28, 2019 at 9:00 am

Location: USIBWC American Dam Facility

Please understand that the Prebid Conference is intended to aid Contractors and ensure that misunderstandings are minimized to provide a better project for all involved. However, the

Government is not bound by verbal responses. Contractors shall submit written questions to the

Contracting Officer (CO) for official clarification and responses. All written questions and answers received prior to the cutoff date shall be added to this Solicitation as an amendment;

only these written responses bind the Government during performance of this Contract.

Items of Note for Contractors

1. Davis Bacon project

a. Applies to all subcontractors.

b. Certified payrolls required for all workers, including truck drivers (unless owner-operator).

c. Owner-operators have special reporting requirements.

2. SF-1413 forms are required for all subcontractors. This includes service providers but not suppliers.

3. Review requirements for Safety and Health Officer. Section 01.35.23 1.13.

4. CPR and first aid required for all employees onsite, including subcontractors. Section

01.35.23 1.17.

5. All subcontractors working onsite during any month shall complete Form 153 (Monthly

Exposure and First Aid Report). Sections 01.29.00 and 01.35.23.

6. Quality Control Systems Manager must be an engineer and shall have no other duties on the project. Section 01.45.00 1.11.

7. All surveys shall be performed by or under the direction of a professional surveyor.

(Multiple specification references)

8. Surveys are required: prior to removal of islands, after removal of islands, prior to project site disturbance, after backfill, after installation of gabions and Reno mattresses, after installation of topsoil, after planting each type of vegetation, and upon completion of the project. See Section 02.21.00 31, 3.2, and 3.3 for more information.

9. Review premobilization submittals: Section 01.11.00 3.1.

a. Baseline Schedule (Section 01.32.16)

b. Scheduler Qualifications (Section 01.32.16)

c. Video and Photographs of Existing Conditions (Section 01.32.33)

d. Submittal Register (Section 01.33.00)

e. Accident Prevention Plan and applicable AHAs (Section 01.35.23)

f. Site Safety and Health Officer Qualifications (Section 01.35.23)

191BWC19B0002 Page 2 of 2

g. Employee First-Aid and CPR Training Records (Section 01.35.23)

h. Quality Control Plan (Section 01.45.00)

i. Contractor Quality Control System Manager Qualifications (Section 01.45.00)

j. Staging Area/Haul Routes/Trailer Location/Storage (Section 01.52.13 and 01.57.00)

k. SWPP Plan (Section 01.57.19)

l. SWPP NOI (Section 01.57.19)

m. Resource Conservation Construction Plan (Section 01.74.19)

n. Flood Protection Plan (Section 02.01.00)

o. Preconstruction Survey (Section 02.21.00)

10. Floodplain is available as staging area at Contractor's risk.

11. Floodplain is not available for Contractor's office.

12. Seeding (revegetation): Lump sum item included with shrub and tree planting.

a. Both planting areas require seeding.

b. Channel of Rio Grande and islands shall not be seeded.

c. All additional areas disturbed during construction shall be seeded.

13. Vegetation maintenance continues until the later of November 2020, 85% establishment of each species of shrubs, coyote willows, and trees, or 70% seeded vegetation cover.

14. Any questions about IBWC Form 245?

15. Any questions about Bid Schedule?

CLIN DESCRIPTION UNIT QTY

1 Mobilization/Demobilization 1 LS

2 Install 3'x3' Gabions 2,340 SY

3 Install 12" thick Reno Mattresses 3,260 SY

4 Site Earthwork 1 LS

5 Relocate and Plant Willows 1 LS

6 Site Vegetation and Seeding 1 LS

7 Vegetation Maintenance 1 LS

8 Receiving Lines 20 EA

16. We are going to start the site visit on the eastside of the Rio Grande directly across from this project. I plan on stopping there so you can view the western bank and then we will go across Vado Bridge to the actual project site. Are there other areas where people wish to stop?

a. The levee and floodplain are available to pedestrian access all of the time. You are welcome to go back and revisit any of the things that you see today on your own time. However, the gates will be locked, blocking vehicular access.

Written questions are due to the CO by September 5, 2019 at noon.

RFQ Deadline is September 16, 2019 at 2:00 pm MDT

CO is Philip Johnson philip.johnson@ibwc.gov mailto:philip.johnson@ibwc.gov

191BWC19B0002 Page 1 Vado West Levee Floodplain Repair, Doña Ana County, NM

Directions from American Dam to Project Site

One way trip approximately 28 miles.

Because the westbound on ramp to I-10 is closed, take Paisano Drive to the new I-10 distributor lanes.

There are three access points from the frontage road to Paisano Drive. Take any of them and head north on Paisano staying the left lane.

Continue on Paisano until it merges with I-10. You will want to be in the left lane as Paisano travels over I-10 in order to enter the freeway. The on ramp is on the left.

191BWC19B0002 Page 2

Once on north Paisano, stay in the left lane. Even when you see signs about a toll road, stay in the left lane. There is no toll where you will be driving.

Once over the flyover, marge to the left again and enter I-10 just before the Mesa Exit.

Travel west (actually driving north) on I-10 for approximately 21 miles.

Take Exit 155 - Vado, NM.

There are two traffic circles on this exit. Continue around the first circle and then cross I-10, heading west. Continue around the next traffic circle, taking Vado Drive (NM 227) also heading west. At this point you should be heading down the hill past the Texaco gas station.

191BWC19B0002 Page 3

Continue on Vado Drive until it T's (stop sign) with NM 478. It's about 1.75 miles. The stop sign will be just past a Family Dollar store.

At this stop sign, turn left (south).

Travel south just a ¼ mile (see blue line below). Turn right (west) on NM 189. There is a warehouse for Crop Production Services (CPS) as well as several large, cylindrical, metal storage tanks on either side of NM 189.

Go straight on NM 189 (yellow line above) across the railroad tracks. The turn for the levee is less than a ¼ mile from NM 478.

Turn left (south) onto the levee (red line above) before the bridge over the Rio Grande.

The project is on the westside of the river, but the tour will begin on eastside so that the full extent of the bank erosion can be viewed.

191BWC19B0002 Page 4

First

Stop

Second

Stop