J_11_191BWC19B0002_IBWC_Form_245A.pdf

PDF 210 KB Posted

Attached to
Vado West Floodplain Repair Federal contract opportunity
Solicitation number
191BWC19B0002
Issued by
International Boundary and Water Commission U.S.-Mexico

About this file

J.11 IBWC Form 245A

View the file

Other files for this federal contract opportunity

Other files attached to Vado West Floodplain Repair, newest first.
File Type Posted
191BWC19B0002_0004.pdf PDF
A004_191BWC19B0002_Vado_Specs_20190909.pdf PDF
Questions_and_Answers_Received_Against_191BWC19B0002.pdf PDF
191BWC19B0002_0003.pdf PDF
Prebid_Sign_In_Sheets.pdf PDF
Prebid_Handouts.pdf PDF
191BWC19B0002_Vado_Specs_20190827.pdf PDF
191BWC19B0002_0002.pdf PDF
191BWC19B0002_001.pdf PDF
J_01_191BWC19B0002_Vado_Specs_20190812.pdf PDF
J_02_191BWC19B0002_Vado_Drawings_20190808_HS.pdf PDF
J_12_191BWC19B0002_IBWC_Form_245B.pdf PDF
191BWC19B0002_Vado_West.pdf PDF
J_05_DOCS-00-31-32.zip ZIP file
J_03_DOCS-00-31-19.zip ZIP file
J_09_IBWC_Form_117.pdf PDF
J_07_IBWC_Form_110.pdf PDF
J_04_DOCS-00-31-24.zip ZIP file
J_08_IBWC_Form_116.pdf PDF
J_02_191BWC19B0002_Vado_Drawings_20190808_FS.pdf PDF
J_06_NM20190039_Wage_Decision.pdf PDF
J_10_191BWC19B0002_IBWC_Form_245.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTERNATIONAL BOUNDARY & WATER COMMISSION

MINIMUM QUALIFICATIONS FOR AWARD

(Joint Venture)

IBWC Form 245A(ESD) Updated 11/26/2018 Page 1 of 2 www.ibwc.gov

Joint Venture Participant's Name:

Each participant in the Joint Venture shall complete a separate form.

USIBWC acknowledges that the purpose of a joint venture is to join companies with different abilities in order to perform the required work; therefore, not every company within the joint venture will meet the minimum technical requirements. Each JV participant shall complete this form. All JV participants must meet the "MINIMUM QUALIFICATIONS FOR JOINT VENTURE PARTICIPANTS." At least one of the JV participants shall meet each of the "MINIMUM TECHNICAL QUALIFICATIONS."

The JV shall submit either an organizational chart or narrative explaining the structure of the JV and how project responsibilities will be split between all of the Joint Venture participants.

MINIMUM QUALIFICATIONS FOR JOINT VENTURE PARTICIPANTS

Answer the following questions: YES NO

Do you have a Dun & Bradstreet (D&B) PAYDEX (up to 24 month) Score of 65 or greater?

100-Best, 0-Worst

Do you have a Dun & Bradstreet (D&B) Portfolio Comparison Score of 5 or better?

1-Best, 9-Worst 5 or better indicates score of 5, 4, 3, 2, or 1

A 'No' answer, by any participant, disqualifies a Joint Venture from bidding on this Project.

MINIMUM TECHNICAL QUALIFICATIONS

Answer the following questions: YES NO

Do you have experience as a prime contractor with the Federal Government on projects similar in magnitude to this project?

Valid experience must have occurred within the last 10 years.

Contractor must have had a contract directly with a Federal agency.

Do you have experience on earthwork and/or gabion construction projects similar in magnitude, scope, and complexity to that described in the solicitation?

Valid experience must have occurred within the last 15 years.

INTERNATIONAL BOUNDARY & WATER COMMISSION

MINIMUM QUALIFICATIONS FOR AWARD

(Joint Venture)

IBWC Form 245A(ESD) Updated 11/26/2018 Page 2 of 2 www.ibwc.gov

MINIMUM TECHNICAL QUALIFICATIONS

Answer the following questions: YES NO

Do you have experience with vegetative mitigation projects within West Texas or New Mexico similar in magnitude and scope to that described in the solicitation?

Valid experience must have occurred within the last 10 years.

Notes: Magnitude refers to dollar amount of work.

Scope refers to technical requirements of work.

Complexity refers to difficulty of performing work due to many varied interrelated parts.

Similar in magnitude refers to projects priced at 85% of your bid and above.

Similar in scope refers to the same type of work with comparable or greater quantities.

Concrete flatwork including, but not limited to, slabs, sidewalks, parking lots, curbs, and roads is NOT similar in scope to structural concrete.

Complete IBWC Form 245B-Backup Information for each project which supports your 'yes' answers above. USIBWC will run a D&B Federal Information Report to determine the validity of the D&B score answers.

I certify that my answers to these questions are true and correct.

If additional backup information is required by the Contracting Officer to further aide in determining responsibility in accordance with the general standards under Federal Acquisition Regulation (FAR) 9.104-1, I certify I will be able to submit that information within twenty-four (24) hours of the request.

If backup information is not provided when requested by the Contracting Officer or if information fails to support the answer provided, the Bidder will be found to be ineligible for award.

Sign Date

Joint Venture Participant's Representative Name Joint Venture Participant's Representative Title

Note2: Use signature image
Contractor_Signature:
Click here1: Click below to add signature image to form
Check: Off
Note1: Use digital signature
Date:
Button2:
Print:
Note: Form must be "printed" to pdf prior to submittal to USIBWC.
buttonClear:
buttonClear2:
Contractor Name:
Button3:
BoxQ1: Off
BoxQ2: Off
BoxQ3: Off
BoxQ4: Off
BoxQ5: Off
CR Name:
CR Title:

File details come from the government source that posted it.