191BWC19B0002_Vado_Specs_20190827.pdf
PDF 3 MB Posted
- Attached to
- Vado West Floodplain Repair Federal contract opportunity
- Solicitation number
- 191BWC19B0002
About this file
191BWC19B0002 Vado Spec
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A004_191BWC19B0002_Vado_Specs_20190909.pdf | ||
| 191BWC19B0002_0004.pdf | ||
| Questions_and_Answers_Received_Against_191BWC19B0002.pdf | ||
| Prebid_Sign_In_Sheets.pdf | ||
| 191BWC19B0002_0003.pdf | ||
| Prebid_Handouts.pdf | ||
| 191BWC19B0002_0002.pdf | ||
| 191BWC19B0002_001.pdf | ||
| J_05_DOCS-00-31-32.zip | ZIP file | |
| J_03_DOCS-00-31-19.zip | ZIP file | |
| J_09_IBWC_Form_117.pdf | ||
| J_07_IBWC_Form_110.pdf | ||
| J_04_DOCS-00-31-24.zip | ZIP file | |
| J_08_IBWC_Form_116.pdf | ||
| J_11_191BWC19B0002_IBWC_Form_245A.pdf | ||
| J_01_191BWC19B0002_Vado_Specs_20190812.pdf | ||
| J_02_191BWC19B0002_Vado_Drawings_20190808_HS.pdf | ||
| J_12_191BWC19B0002_IBWC_Form_245B.pdf | ||
| 191BWC19B0002_Vado_West.pdf | ||
| J_02_191BWC19B0002_Vado_Drawings_20190808_FS.pdf | ||
| J_06_NM20190039_Wage_Decision.pdf | ||
| J_10_191BWC19B0002_IBWC_Form_245.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
International Boundary and Water Commission United States and Mexico United States Section
Front Cover
Technical Specifications Rio Grande Canalization Project Vado West Floodplain Repair Doña Ana County, New Mexico
Solicitation 191BWC19B0002
August 27, 2019
United States and Mexico United States Section Engineering Services Division El Paso, Texas
These Technical Specifications may be reprinted after Contract award using the awarded Contract number instead of the Solicitation number currently shown. The reprint shall have all changes indicated incorporated.
Reissuance of the awarded Technical Specifications with the Contract number will proceed without an amendment or modification.
Reissuance with the Contract number will NOT result in a new date being displayed on the Technical
Specifications.
State of New Mexico
PLEASE NOTE - Technical Specifications should be printed double sided.
Printing this document single sided will take 186 additional pages of paper and 29 of those pages will be blank to facilitate double sided printing.
Changes related to the August 27, 2019 version in comparison to the August 12, 2019 version. All changes in the document are highlighted.
Section 01.45.00 1.11 C. revised with some requirements deleted
Section 31.25.14 2.6 added
Minor grammatical changes made to Section 32.93.33 3.2 A.1.a., Section 32.93.43 3.2 C.1., and Section
32.96.33 3.2 A.1.
USIBWC Rio Grande Canalization Project
August 27, 2019 Division 00
USIBWC Solicitation 191BWC19B0002 Procurement and Contracting Requirements-Page 1
US International Boundary & Water Commission
International Boundary and Water Commission United States Section
TECHNICAL SPECIFICATIONS
DIVISION 00
PROCUREMENT AND CONTRACTING
REQUIREMENTS
Vado West Floodplain Repair US International Boundary & Water Commission Rio Grande Canalization Project Procurement and
Contracting Requirements
Division 00
Division 00-Procurement and Contracting Requirements
August 27, 2019 Division 00
USIBWC Solicitation 191BWC19B0002 Procurement and Contracting Requirements-Page 2
This page intentionally left blank for double sided printing.
August 27, 2019 Table of Contents Governing
USIBWC Solicitation 191BWC19B0002 00.01.10-Page 1
SECTION 00.01.10
TABLE OF CONTENTS GOVERNING
00.01.10 Table of Contents Governing 00.01.10-Table of Contents Governing
Table of Contents
DIVISIONS AND SECTIONS
Division 00-Procurement and Contracting Requirements 00.01.10-Table of Contents Governing 00.01.15-List of Contract Drawings 00.21.13-Instructions to Bidders 00.31.19-Existing Condition Information 00.31.21-Survey Information 00.31.24-Environmental Information 00.31.26-Existing Hazardous Material Information 00.31.32-Geotechnical Data 00.31.43-Permit Application 00.60.00-USIBWC Forms and Standard Documents 00.70.00-Delivery of Data to USIBWC 00.70.13-Project Data 00.73.63-Security Requirements
Division 01-General Requirements 01.11.00-Summary of Work 01.22.00-Measurement and Payment 01.29.00-Payment Procedures 01.29.15-Certified Payroll 01.31.00-Project Coordination 01.32.16-Construction Progress Schedule 01.32.33-Photographic Documentation 01.33.00-Submittal Procedures 01.35.23-Safety 01.42.00-References 01.43.26-Testing and Inspection Agencies 01.45.00-Quality Control 01.51.00-Temporary Utilities 01.52.13-Field Offices and Sheds 01.55.00-Vehicular Access and Parking 01.57.00-Temporary Controls for Work Areas 01.57.19-Temporary Environmental Controls 01.61.00-Common Product Requirements 01.61.16-Use of Recovered Materials and Biobased Products 01.74.19-Construction Waste Management and Disposal 01.77.19-Closeout Requirements 01.78.36-Warranties 01.78.39-Record Drawings
USIBWC Solicitation 191BWC19B0002 00.01.10-Page 2
Division 02-Existing Conditions 02.01.00-Existing Conditions & Facilities 02.21.00-Surveys 02.21.13-Cultural Resources Surveys
Division 05-Metal 05.05.13-Galvanizing 05.05.23-Welding 05.50.03-Metalwork Miscellaneous Provisions 05.50.04-Miscellaneous Metalwork
Division 31-Earthwork 31.05.13-Geological Materials 31.05.19-Geotextile for Earthwork 31.23.16-Excavation 31.23.23-Backfill 31.25.14-Stabilization Measures for Erosion Control 31.36.13-Gabions 31.36.19-Reno Mattresses
Division 32-Exterior Improvements 32.15.00-Aggregate Road Surfacing 32.91.19-Topsoil 32.92.19-Vegetation for Erosion Control 32.93.33-Planting Shrubs 32.93.43-Planting Trees 32.96.33-Willow Transplanting
Division 35-Waterway Construction 35.41.00-Construction of Levee
Technical Specification Tables
Table 1 - Index of Drawings Table 2 - Required Minimum Biobased Content Table 3 - Required Minimum Recovered Content Table 4 - Warranty Priority Code C Table 5 - Warranty Priority Code D Table 6 - Galvanizing Standards Table 7 - Geotextile Requirements Table 8 - Aggregate Surfacing Gradation Requirements Table 9 - Levee Plant Varieties and Seeding Rates Table 10 - Floodplain Plant Varieties and Seeding Rates Table 11 - Longstem Shrubs Table 12 - Seeded Shrubs Table 13 - Trees
USIBWC Solicitation 191BWC19B0002 00.01.10-Page 3
Technical Specification Figures
Figure 1 - Fillable Form (not printed) Figure 2 - Printed Fillable Form Figure 3 - Miscellaneous Qualification: Fillet Weld Break Specimen Figure 4 - Miscellaneous Qualification: Method of Rupturing Specimen Figure 5 - General Planting Depths Figure 6 - Shrub Planting Depth Figure 7 - Island Locations
--End of Section--file:///C:/00_Work/191BWC19B0002%20Vado%20West/21-Solicitation%20Files/Specs/191BWC19B0002%20Vado%20Specs%2020190827.docm%23_Toc17895020 file:///C:/00_Work/191BWC19B0002%20Vado%20West/21-Solicitation%20Files/Specs/191BWC19B0002%20Vado%20Specs%2020190827.docm%23_Toc17895021 file:///C:/00_Work/191BWC19B0002%20Vado%20West/21-Solicitation%20Files/Specs/191BWC19B0002%20Vado%20Specs%2020190827.docm%23_Toc17895024
USIBWC Solicitation 191BWC19B0002 00.01.10-Page 4
August 27, 2019 List of Contract Drawings
USIBWC Solicitation 191BWC19B0002 00.01.15-Page 1
SECTION 00.01.15
LIST OF CONTRACT DRAWINGS
00.01.15 List of Contract Drawings 00.01.15-List of Contract Drawings
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Measurement and Payment
1.3 Drawing Titles
1.4 Drawing Index
Part 2 - Products
2.1 Additional or Revised Drawings
Part 3 - Execution (Not Used) --End of Section--
1.2 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.3 DRAWING TITLES
A. The Contract Drawings applicable to this Contract are entitled:
Vado West Levee (CW1) Floodplain Repair
1.4 DRAWING INDEX
A. The Contract Drawings include the following:
Table 1 - Index of Drawings
SHEET NO. SHEET TITLE
26466 Title Sheet
26467 General Project Layout
26468 Plan View 1
26469 Plan View 2
26470 Plan View 3
26471 Typical Section A
26472 Typical Section B
26473 Typical Section C
26474 Typical Section D
26475 Gabion Details
August 27, 2019 List of Contract Drawings
USIBWC Solicitation 191BWC19B0002 00.01.15-Page 2
SHEET NO. SHEET TITLE
26476 Upstream Riparian Planting Area
26477 Downstream Riparian Planting Area
PART 2 - PRODUCTS
2.1 ADDITIONAL OR REVISED DRAWINGS
A. Except as provided in these Technical Specifications for drawings to be furnished by Contractor, Contract Drawings will be supplemented by additional or revised general and detail drawings as necessary or desirable as work progresses.
B. Additional or revised general and detail drawings will show dimensions and details necessary for construction purposes more completely than are shown on these Contract Drawings for features of work.
C. Perform work in accordance with additional general and detail drawings or revisions at applicable prices bid in schedule for such work.
PART 3 - EXECUTION
(Not Used)
August 27, 2019 Instructions to Bidders
USIBWC Solicitation 191BWC19B0002 00.21.13-Page 1
SECTION 00.21.13
INSTRUCTIONS TO BIDDERS
00.21.13 Instructions to Bidders 00.21.13-Instructions to Bidders
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Reference Standards
1.3 Measurement and Payment
1.4 Definitions
1.5 Duty to Inquire
1.6 Bid Submission
Part 2 - Products (Not Used) Part 3 - Execution
3.1 Requests for Interpretation (Duty to Inquire)
--End of Section--
1.2 REFERENCE STANDARDS
A. Federal Acquisition Regulation (FAR)
1. FAR 52.236-3, Site Investigation and Conditions Affecting the Work
1.3 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4 DEFINITIONS
A. Within this section, the following terms are used interchangeably.
1. Bid - Offer - Proposal
2. Solicitation - Request for Proposal - RFP
3. Bidder - Offeror - Contractor
1.5 DUTY TO INQUIRE
A. Contractors shall review the full Solicitation and all Contract Documents including, but not limited to, Technical Specifications, Contract Drawings, USIBWC provided data, referenced items, attachments, etc. to determine the full scope of work required.
B. If during review of these items, the Contractor finds discrepancies, omissions, conflicts, defects, errors, or ambiguities, they have a duty to inquire. The Contractor shall also inquire about items that are open to interpretation.
C. The Contractor shall inquire about items as soon as they are discovered, whether before deadline for submission of bidder questions, whether after deadline for submission of bidder questions, whether after submission of bids, or whether after Contract award.
August 27, 2019 Instructions to Bidders
USIBWC Solicitation 191BWC19B0002 00.21.13-Page 2
D. If the Contractor fails to inquire, they forfeit their right to any claim based upon said discrepancies, omissions, conflicts, defects, errors, ambiguities, or items that are open to interpretation. The
Contractor shall be proceeding at their own risk based upon only their unilateral interpretation.
E. The Contractor shall take no advantage of any item of which they have a duty to inquire.
1.6 BID SUBMISSION
A. Submission of a bid shall be conclusive evidence that the Bidder has reviewed, investigated, and acknowledged all items detailed in FAR 52.236-3.
B. Submission of a bid shall be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, the character, quality, and scope of work to be performed, the quantities of materials to be furnished.
C. Submission of a bid constitutes agreement that Bidder has provided written notice of all discrepancies, omissions, conflicts, defects, errors, ambiguities, or items that are open to interpretation discovered in the Contract Documents, that responses to these written notices are acceptable to Bidder, and that Contract Documents are sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing required work.
D. Bidder has the sole responsibility to make such independent instigation and examination as they deem necessary in order to satisfy themselves as to the conditions to be encountered in the performance of work and the quantities required to complete the work in a accordance with the
Contract Documents.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
3.1 REQUESTS FOR INTERPRETATION (DUTY TO INQUIRE)
A. Contractors shall submit requests for interpretation, questions, and other concerns about the
Solicitation and Contract Documents including, but not limited to, Technical Specifications, Contract Drawings, USIBWC provided data, referenced items, attachments, etc. to the Contracting
Officer identified on SF-1442.
B. Such requests shall be made even if the question and answer period identified in the Solicitation has passed.
C. Failure to request interpretation prior to providing a bid shall result in the Contractor being fully responsible for any cost or time impacts involved to perform the work required.
August 27, 2019 Existing Condition Information
USIBWC Solicitation 191BWC19B0002 00.31.19-Page 1
SECTION 00.31.19
EXISTING CONDITION INFORMATION
00.31.19 Existing Condition Information 00.31.19-Existing Condition Information
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Related Requirements
1.3 Measurement and Payment
1.4 General
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2 RELATED REQUIREMENTS
A. Section 00.31.32-Geotechnical Data
1.3 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4 GENERAL
A. The following reports contain data on the project site and the general area. Both of these reports were written before levee construction was performed so they will not exactly match current conditions.
1. Field assessment of existing conditions within the project limits was performed by Tetra Tech
Inc. The findings are available in a report, entitled "Rehabilitation Improvements for the Vado
East Levee – Final Design Memorandum," dated July 29, 2011.
2. Additional assessment was performed by S&B Infrastructure in the report entitled "Final
Design Report for Upper Rio Grande Flood Control Project, Canutillo Levee Segment, from
Vado Bridge to Borderland Bridge, Doña Ana County, New Mexico and El Paso County, Texas," dated November 16, 2009.
B. Construction drawings for relocation of the river and work on the eastern levee under USIBWC
Contract IBM15C0007 are available as are both construction and as-built drawings for work on the western levee under USIBWC Contract IBM10C0006.
1. Excerpt of construction drawings for USIBWC's Canutillo Levee project (IBM10C0006)
2. Excerpt of as-built drawings for USIBWC's Canutillo Levee project (IBM10C0006)
3. Excerpt of construction drawings for USIBWC's Vado East Levee project (IBM15C0007)
4. Excerpt of survey control drawings for USIBWC's Vado East Levee project (IBM15C0007)
C. Geotechnical investigations were performed as noted in Section 00.31.32.
August 27, 2019 Existing Condition Information
USIBWC Solicitation 191BWC19B0002 00.31.19-Page 2
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
August 27, 2019 Survey Information
USIBWC Solicitation 191BWC19B0002 00.31.21-Page 1
SECTION 00.31.21
SURVEY INFORMATION
00.31.21 Survey Information 00.31.21-Survey Information
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Related Requirements
1.3 Measurement and Payment
1.4 Existing Information
1.5 Existing Utility Survey
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2 RELATED REQUIREMENTS
A. Section 02.01.00-Existing Conditions & Facilities
1.3 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4 EXISTING INFORMATION
A. Project is located in S29 and S32, T25S, R3E, New Mexico Prime Meridian.
B. Construction drawings for USIBWC Contracts IBM10C0006 and IBM15C0007 contain survey layout data. Survey control maps are also provided for IBM15C0007.
C. The Contractor shall note that the site will have varied from that shown in these drawings, not only from the bank erosion, but also from the variations in the river bed.
D. No field survey had been performed for this project.
E. USIBWC owns all of the property from the eastern landside levee toe to the western landside levee toe inclusive of the Rio Grande. ROW maps can be provided to Contractor after award.
1. Please be aware that ROW maps are from the 1930s and 1940s and are based upon township and range data available at the time. Revising this data to current survey systems shall be the
Contractor's responsibility.
1.5 EXISTING UTILITY SURVEY
A. Both construction and as-built drawings note utilities in the area.
1. NOTE: It is the Contractor’s responsibility to verify locations of all existing utilities (shown and not shown) prior to construction.
2. Additionally, attention is called to Sections 02.01.00 for additional requirements and guidelines for existing utility survey.
August 27, 2019 Survey Information
USIBWC Solicitation 191BWC19B0002 00.31.21-Page 2
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
August 27, 2019 Environmental Information
USIBWC Solicitation 191BWC19B0002 00.31.24-Page 1
SECTION 00.31.24
ENVIRONMENTAL INFORMATION
00.31.24 Environmental Information 00.31.24-Environmental Information
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Related Requirements
1.3 Reference Standards
1.4 Measurement and Payment
1.5 General
1.6 Preservation of Cultural and Natural Resources and the Environment
1.7 Other Considerations
1.8 NEPA Documentation
1.9 Use of Geologic Materials on a Federally Funded Project
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2 RELATED REQUIREMENTS
A. Section 01.57.00-Temporary Controls for Work Areas
B. Section 01.57.19-Temporary Environmental Controls
C. Section 02.21.13-Cultural Resources Surveys
1.3 REFERENCE STANDARDS
A. United States Code (USC)
1. Clean Air Act, 42 USC 7401 et seq.
2. Clean Water Act (CWA), 33 USC 1251 et seq.
3. Endangered Species Act (ESA), 16 USC 1531 et seq.
4. Migratory Bird Treaty Act (MBTA), 16 USC 703 - 712
5. National Environmental Policy Act (NEPA), 42 USC 4321-4347
6. National Historic Preservation Act (NHPA), 54 USC 300101 et seq.
7. National Wildlife Refuge System Improvement Act of 1997, 16 USC 668dd
8. Native American Graves Protection and Repatriation Act (NAGPRA), 25 USC 3001 et. seq.
9. Refuge Recreation Act, 16 USC 460k - 460k-4
1.4 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
USIBWC Solicitation 191BWC19B0002 00.31.24-Page 2
1.5 GENERAL
A. The Contractor shall review and comply with the requirements provided in the environmental documents listed below.
1. "Final Biological Opinion for U.S. International Boundary and Water Commission Long-
Term River Management of the Rio Grande Canalization Project, New Mexico," dated August
16, 2017.
2. "Programmatic Agreement Between the United States Section, International Boundary and
Water Commission, the New Mexico State Historic Preservation Office, U.S. Fish and Wildlife
Service, Regarding Improvements to Existing Rio Grande Canalization Project Along the Rio
Grande, New Mexico," signed December 2017.
3. "Final Environmental Assessment, Flood Control Improvements to the Rio Grande
Canalization Project," dated December 2007.
4. "Final Supplemental Environmental Assessment, Flood Control Improvements to the Rio
Grande Canalization Project in Vado, New Mexico," dated July 2014.
5. "Riparian Habitat Compensatory Mitigation Plan for Vado East Levee Rehabilitation, Dona
Ana County, New Mexico," written by USIBWC and dated May 2015.
6. "Conceptual Restoration Plan and Cumulative Effects Analysis, Rio Grande - Caballo Dam to
American Dam, New Mexico and Texas," dated March 5, 2009 by USACE
B. These documents lists environmentally and culturally sensitive areas that need to be protected from any disturbances of construction activities. The environmentally and culturally sensitive areas that were identified on the document are identified below.
1. Biological Resources
Work should be scheduled to occur outside of the bird breeding season whenever possible.
Migratory birds may be present within the project area; birds, nests, and eggs are to be protected and avoided during construction. The breeding and nesting season is identified in
Section 01.57.19. If work continues into the bird breeding/nesting season the areas proposed for disturbance shall be surveyed in order to avoid the inadvertent destruction of nests and eggs.
2. Natural Resources
Equipment cannot be parked, staged, or used under large, mature trees. Keeping equipment away from the large, mature trees will prevent incidental damage to the tree and prevent compression of the root ball.
C. Further details of environmental requirements are in Sections 01.57.00 and 01.57.19.
1.6 PRESERVATION OF CULTURAL AND NATURAL RESOURCES AND THE
ENVIRONMENT
A. If the Contractor initiates changes to the Contract and USIBWC approves the changes, the
Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agencies.
B. Culturally Sensitive Areas
If a site, building, or location of historical, archaeological, educational, or scientific interest is discovered within the right of way, cease all work immediately, secure the site from further disturbance and possible vandalism, and notify USIBWC. The site, building, or location will be investigated and evaluated by USIBWC.
USIBWC Solicitation 191BWC19B0002 00.31.24-Page 3
1.7 OTHER CONSIDERATIONS
The Contractor is required to ensure that all Environmental Permits, Issues, and Comments (EPIC), which are included within the Contract Documents are followed and implemented to ensure potential impacts are avoided.
1.8 NEPA DOCUMENTATION
The USIBWC shall complete appropriate NEPA documentation prior to the construction of the project.
The USIBWC will be responsible for compliance with National Environmental Policy Act (NEPA).
1.9 USE OF GEOLOGIC MATERIALS ON A FEDERALLY FUNDED PROJECT
A. To ensure preservation of historical and archaeological data, prior to use of any offsite soil, rock, or gravel, the source must first be compliance confirmed by the COR to ensure compliance with
Section 106 of the National Historic Preservation Act (NHPA).
B. Take no action to use or alter the proposed location until written approval for site use is received from the COR.
C. If the quarry or borrow site already provides materials for NMDOT, USACE, or other governmental agency, a copy of the environmental approvals from said agencies may be provided to the COR.
D. Include permission for Government access to any geological source locations.
E. Full details of requirements for geological materials are in Section 02.21.13.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
USIBWC Solicitation 191BWC19B0002 00.31.24-Page 4
August 27, 2019 Existing Hazardous Material Information
USIBWC Solicitation 191BWC19B0002 00.31.26-Page 1
SECTION 00.31.26
EXISTING HAZARDOUS MATERIAL INFORMATION
00.31.26 Existing Hazardous Material Information 00.31.26-Existing Hazardous Material Information
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Related Requirements
1.3 Measurement and Payment
1.4 General
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2 RELATED REQUIREMENTS
A. Section 00.31.24-Environmental Information
1.3 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4 GENERAL
Based on the environmental report(s) identified in Section 00.31.24, there are no hazardous material or waste storage, disposal sites, or spill sites, identified within the immediate project area.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
August 27, 2019 Existing Hazardous Material Information
USIBWC Solicitation 191BWC19B0002 00.31.26-Page 2
August 27, 2019 Geotechnical Data
USIBWC Solicitation 191BWC19B0002 00.31.32-Page 1
SECTION 00.31.32
GEOTECHNICAL DATA
00.31.32 Geotechnical Data 00.31.32-Geotechnical Data
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Measurement and Payment
1.3 Geotechnical Reports
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.3 GEOTECHNICAL REPORTS
A. Geotechnical analysis for this project was previously performed and summarized in the flowing reports:
1. Borehole data from "Final Technical Memorandum, Volume I and II, for Geotechnical
Explorations of Levee System within the Rio Grande Canalization Project, Canutillo Levee
Segment," dated December 22, 2008 by S&B Infrastructure, Ltd.
2. "Design of Rehabilitation Improvements for Rio Grande Canalization Flood Control Project, Vado Segment - East Levee, Vado, Doña Ana County, New Mexico," dated May 25, 2011 by
Raba-Kistner Consultants, Inc.
B. These reports were prepared prior to their associated levee work. The reconstruction of the levees will have changed the geotechnical data within that area.
C. The data and report are not intended as a representation or warranty of continuity of conditions between soil borings nor of groundwater levels at dates and times other than date and time when measured. Additional test borings and other exploratory operations may be made by Contractor subsequent to award of the Contract.
D. Due to the site location adjacent to the Rio Grande, groundwater levels may fluctuate, sometimes to extreme levels, based upon time of year and amount of water in the river. Higher groundwater levels than those shown in the bore logs may occur causing changes in soil saturation and strength.
E. The worksite is adjacent to the Rio Grande and is located in an area where the river flowed in the past. Fluvial deposits can change rapidly in type (sand, silt, clay, loam, gravel, rocks, etc.) both horizontally and vertically due to depositional characteristics and channel shifting. Rocks may be present even if not visible on the ground surface. Rocks larger than the borehole would not have been captured in any logging data.
F. The Contractor is charged with the duty to read and understand the geotechnical data provided, including any data referenced within. The Contractor shall consider all geotechnical information
August 27, 2019 Geotechnical Data
USIBWC Solicitation 191BWC19B0002 00.31.32-Page 2 including geotechnical reports, bore logs, and site visits as a whole. The Contractor shall consider the limitations of any geotechnical tests performed including the auger size, borehole spacing and location, consistency of borehole data, as well as the frequency of testing, results of testing, and groundwater level at time.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
August 27, 2019 Permit Application
USIBWC Solicitation 191BWC19B0002 00.31.43-Page 1
SECTION 00.31.43
PERMIT APPLICATION
00.31.43 Permit Application 00.31.43-Permit Application
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Reference Standards
1.3 Measurement and Payment
1.4 General
1.5 Work in Waters of the United States
1.6 Responsibilities
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2 REFERENCE STANDARDS
A. Doña Ana County, NM
1. Doña Ana County Code Chapter 157, Design and Construction Standards
2. Doña Ana County Stormwater Management Ordinance
B. Environmental Protection Agency (EPA)
1. Modified General Construction Permit 2017
2. National Pollutant Discharge Elimination System (NPDES) Permit Program
C. State of New Mexico
1. New Mexico Environmental Department application of Clean Water Act §401
D. US Army Corps of Engineers (USACE)
1. Section 404 of Clean Water Act, 33 USC §1251 et seq.
1.3 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4 GENERAL
Prior to the beginning of construction, the Contractor shall be responsible for researching, coordinating, obtaining, and paying all applicable fees for all permits required by Federal, state, and local entities, including, but not limited to, a specific or general stormwater permit prepared in accordance with the requirements of Stormwater Pollution Prevention Plan (SWPPP) 2017 National Pollutant Discharge
Elimination System (NPDES).
1.5 WORK IN WATERS OF THE UNITED STATES
A. For work in the right of way, USIBWC will obtain any required Section 404 permits from the US
Army Corps of Engineers before work begins.
August 27, 2019 Permit Application
USIBWC Solicitation 191BWC19B0002 00.31.43-Page 2
B. The Contractor must adhere to all agreements, mitigation plans, and standard best management practices required by this permit.
C. If Contractor initiated changes in the construction method result in impacts to waters of the US, the
Contractor shall have sole responsibility to obtain all required new or revised Section 404 permit and shall adhere to all agreements, mitigation plans, and standard best management practices required by these permits.
1.6 RESPONSIBILITIES
A. The Contractor shall be responsible for providing the proposed location of the project staging areas for compliance confirmation of the COR prior to installation of stormwater pollution prevention
(SWPP) measures.
B. The Federal Government is not subject to local jurisdictions' building codes, nor is it required to obtain building permits from local jurisdictions for construction on real estate owned or controlled by the USIBWC. However, borrow pits and other offsite locations are subject to local regulations.
The Contractor is responsible for researching and obtaining all necessary permits for offsite work.
C. The Contractor shall be responsible for obtaining all necessary permits and rights of entry for all work required under this Contract.
D. The Contractor will also be required to research the need for any other required permits, based on the information available from the Contract Drawings and Technical Specifications prior to the beginning of construction. For the work under this Contract, the Contractor shall be responsible for coordinating and obtaining all permits required by Federal, state, and local entities, unless otherwise specified within the Contract Provisions and these Technical Specifications.
E. The Contractor shall apply and pay for all required permits. The Government is not responsible for any existing or newly introduced permits required before, during and/or after construction.
F. The Contractor shall be responsible for and shall give and maintain any and all notices required by applicable regulations, laws, or permitting authorities pertaining to construction of this project.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
August 27, 2019 USIBWC Forms and Standard Documents
USIBWC Solicitation 191BWC19B0002 00.60.00-Page 1
SECTION 00.60.00
USIBWC FORMS AND STANDARD DOCUMENTS
00.60.00 USIBWC Forms and Standard Documents 00.60.00-USIBWC Forms and Standard Documents
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Measurement and Payment
1.3 General
1.4 Location of Items
Part 2 - Products (Not Used) Part 3 - Execution
3.1 Using USIBWC Forms
3.2 Printing
--End of Section--
1.2 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.3 GENERAL
A. The USIBWC ftp site is available at:
Address: 63.96.218.8
User Name: ESD_User
Password: 2erAsatu
B. USIBWC's ftp site must be accessed using ftp software. Internet browsers (e.g., Internet Explorer, Chrome, Firefox, etc.) will not work.
C. Ftp software is available as freeware or as commercial software. Examples of available ftp software include FileZilla, WinSCP, SmartFTP, and Ipswitch.
D. Contractor shall use the most current version of each form.
E. Form filenames contain a date. This date is the revision date of the form. Keeping the date in the filename can cause confusion when submitting files. Prior to submitting the forms, rename the file as suggested in these Technical Specifications or as agreed to with the COR.
1.4 LOCATION OF ITEMS
A. All forms are under the directory entitled 'Construction\Forms.'
B. Posters are under the directory entitled 'Construction\Posters.'
USIBWC Solicitation 191BWC19B0002 00.60.00-Page 2
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
3.1 USING USIBWC FORMS
A. Providing Fillable Forms to USIBWC
1. Fillable forms shall be "printed" prior to sending to USIBWC. Printing a fillable form to pdf fixes the form data permanently so it cannot be changed. It also allows the merging of multiple pdf files without compromising form data.
a. Printing resolution shall not be less than 400 dpi. 1200 dpi is preferred and easily handled by Adobe Acrobat.
Figure 1 - Fillable Form (not printed)
Figure 2 - Printed Fillable Form
B. Providing Adobe Electronic Signatures to USIBWC
Whenever an Adobe digital signature is used, ensure that the file is printed to pdf afterwards. This ensures that the digital signature is locked and cannot change, but is also allows the resulting file to be combined without pdf files without errors.
USIBWC Solicitation 191BWC19B0002 00.60.00-Page 3
C. Using Electronic Versions of Forms
1. Unless otherwise allowed by the COR or this Section, the electronic version all forms shall be used. This means that forms shall not be printed and then filled out by hand. Instead they shall be filled out electronically and then printed to pdf.
2. The following forms are allowed to be filled out by hand: 162, 164, 166, 227, 231, 237, 238, 358, and 359. Once completed by hand, they shall be scanned at no less than 400 dpi resolution and provided to USIBWC in a pdf document.
3.2 PRINTING
The Contractor is responsible for printing copies of items provided in electronic format for their own use.
USIBWC Solicitation 191BWC19B0002 00.60.00-Page 4
August 27, 2019 Delivery of Data to USIBWC
USIBWC Solicitation 191BWC19B0002 00.70.00-Page 1
SECTION 00.70.00
DELIVERY OF DATA TO USIBWC
00.70.00 Delivery of Data to USIBWC 00.70.00-Delivery of Data to USIBWC
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Related Requirements
1.3 Measurement and Payment
1.4 General
1.5 Adobe PDF Files
1.6 Image Files
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2 RELATED REQUIREMENTS
A. Section 01.32.33-Photographic Documentation
1.3 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4 GENERAL
A. USIBWC will perform most document transfer communications via email.
B. The Contractor shall send all files electronically via email whenever possible. USIBWC's email system can accept files up to 25 MB. Very large files shall be transferred via private ftp sites or via
CD/DVD.
1. The US Army Aviation and Missile Research Development and Engineering Center
(AMRDEC) provides a free, safe ftp system which can be used to deliver items up to 2 GB.
This is available at: safe.amrdec.army.mil/safe/.
2. USIBWC cannot accept USB thumb drives and portable hard drives unless the COR allows their use for transfer of final closeout items. Any drives thus provided to the Government become US Government property.
C. Placing documents on a cloud server, sharepoint, online drop box, "web hub," or online management system (e.g. Owner Insite) is unacceptable as a delivery method.
D. Direct delivery via drop off, US Postal Service, FedEx, UPS, etc. is acceptable.
1. No delivered boxes shall exceed forty (40) pounds.
E. Electronic files shall be provided in their native format (MSWord, Excel, Primavera, etc.) as well as
Adobe pdf.
1. The entire filename shall not exceed thirty (30) characters, excluding extension.
https://safe.amrdec.army.mil/safe/
August 27, 2019 Delivery of Data to USIBWC
USIBWC Solicitation 191BWC19B0002 00.70.00-Page 2
2. Filenames shall not contain periods (i.e. ".") except to separate the file extension.
F. Hard copies shall not be provided in 3-ring binders (except for O&M manuals, if required). Large, lengthy hard copies shall be grouped in expandable folders. Folders shall not exceed 3.5 inches in width.
1.5 ADOBE PDF FILES
A. Pdfs shall be produced directly via software whenever possible. Pdfs shall include valid electronic signatures or they shall be scans of the original documents.
1. Valid electronic signatures include digital signatures created through the pdf program or inserted scans of a true signature. By submitting an item using either of these items, the
Contractor is certifying that the signature is valid.
B. The minimum scanning resolution shall be:
1. Color-400 dpi
2. Grayscale-400 dpi
3. Black and White-600-dpi
C. Color documents shall be scanned in color. NCR pages that are other than white (e.g. all yellow or all pink) are not considered color documents and may be scanned in grayscale or black and white.
D. Pdfs shall be sized at ANSI A (8 ½" x 11"), ANSI B (11" x 17"), or ANSI D (22" x 34") unless the original is another size, then the pdf shall be the size of the original document.
E. The Contractor shall ensure that the electronic copy is legible.
F. Pdf files that contain form fields shall be "printed" to pdf prior to submittal to USIBWC. Printing the file to pdf locks the data and prevents the form field from being changed.
G. Pdf files shall not be "locked" or otherwise blocked from changes unless the password is also provided to USIBWC.
1.6 IMAGE FILES
See Section 01.32.33 for requirements of image files.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
August 27, 2019 Project Data
USIBWC Solicitation 191BWC19B0002 00.70.13-Page 1
SECTION 00.70.13
PROJECT DATA
00.70.13 Project Data 00.70.13-Project Data
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Reference Standards
1.3 Measurement and Payment
1.4 General
1.5 Definitions
Part 2 - Products (Not Used) Part 3 - Execution
3.1 Data First Produced in the Performance of this Contract
3.2 Data Not First Produced in the Performance of this Contract
3.3 Release and Use Restrictions
--End of Section--
1.2 REFERENCE STANDARDS
A. United States Code (USC)
1. 17 USC §401-§402
1.3 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4 GENERAL
The Government shall have unlimited rights in all data delivered under this Contract and in all data first produced in the performance of this Contract. The Government shall also have the right to limit assertion of copyright in data first produced in the performance of this Contract and to obtain assignment of copyright in that data. The Government has the right to limit the release and use of certain data.
1.5 DEFINITIONS
A. "Data" means recorded information, regardless of form or the media on which it may be recorded.
The term includes all technical data and testing data. The term does not include information incidental to Contract administration, such as financial, administrative, cost or pricing, management information, or computer software.
1. Data examples include, but are not limited to:
a. The production of audiovisual works, including motion pictures or television recordings with or without accompanying sound, or for the preparation of motion picture scripts, musical compositions, sound tracks, translation, adaptation, and the like.
b. Photographs, negatives, and slides.
c. Histories of the respective agencies, departments, services, or units thereof.
USIBWC Solicitation 191BWC19B0002 00.70.13-Page 2
d. Surveys of Government establishments including any associated survey data and drawings produced from such surveys.
e. Works pertaining to the instruction or guidance of Government officers and employees in the discharge of their official duties.
f. The compilation of reports, books, studies, surveys, or similar documents.
g. The collection of data containing personally identifiable information such that the disclosure thereof would violate the right of privacy or publicity of the individual to whom the information relates.
h. Investigatory reports.
i. The development, accumulation, or compilation of data, the early release of which could prejudice follow-on acquisition activities or agency regulatory or enforcement activities.
j. Drawings.
B. "Unlimited rights" means the rights of the Government to use, disclose, reproduce, prepare derivative works, distribute copies to the public, and perform publicly and display publicly, in any manner and for any purpose, and to have or permit others to do so.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
3.1 DATA FIRST PRODUCED IN THE PERFORMANCE OF THIS CONTRACT
A. The Contractor shall not assert or authorize others to assert any claim to copyright subsisting in any data first produced in the performance of this Contract without prior written permission of the
Contracting Officer.
B. The Contractor grants to the Government, and others acting on its behalf, a paid-up, nonexclusive, irrevocable, worldwide license for all delivered data to reproduce, prepare derivative works, distribute copies to the public, and perform publicly and display publicly, by or on behalf of the
Government.
3.2 DATA NOT FIRST PRODUCED IN THE PERFORMANCE OF THIS CONTRACT
The Contractor shall not, without prior written permission of the Contracting Officer, incorporate in data delivered under this Contract, any data not first produced in the performance of this Contract and that contain the copyright notice of 17 USC 401 or 402, unless the Contractor identifies such data and grants to the Government, or acquires on its behalf, a nonexclusive, irrevocable, worldwide license.
3.3 RELEASE AND USE RESTRICTIONS
A. Except as otherwise specifically provided for in this Contract, the Contractor shall not use, release, reproduce, distribute, or publish any data first produced in the performance of this Contract, nor authorize others to do so, without written permission of the Contracting Officer.
B. The Contractor shall indemnify the Government and its officers, agents, and employees acting for the Government against any liability, including costs and expenses, incurred as the result of:
1. The violation of trade secrets, copyrights, or right of privacy or publicity, arising out of the creation, delivery, publication, or use of any data furnished under this Contract.
USIBWC Solicitation 191BWC19B0002 00.70.13-Page 3
2. Any libelous or other unlawful matter contained in such data. The provisions of this paragraph do not apply unless the Government provides notice to the Contractor as soon as practicable of any claim or suit, affords the Contractor an opportunity under applicable laws, rules, or regulations to participate in the defense of the claim or suit, and obtains the Contractor’s consent to the settlement of any claim or suit other than as required by final decree of a court of competent jurisdiction; and do not apply to material furnished to the Contractor by the
Government and incorporated in data to which this clause applies.
USIBWC Solicitation 191BWC19B0002 00.70.13-Page 4
August 27, 2019 Security Requirements
USIBWC Solicitation 191BWC19B0002 00.73.63-Page 1
SECTION 00.73.63
SECURITY REQUIREMENTS
00.73.63 Security Requirements 00.73.63-Security Requirements
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Measurement and Payment
1.3 General
1.4 Security
1.5 Insurance
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.3 GENERAL
The project site may be exposed to vandalism and theft. The Contractor shall be responsible for providing adequate security of the project site in order to prevent vandalism and theft.
1.4 SECURITY
A. The Contractor is responsible for securing the worksite, equipment, and materials from vandalism and theft.
B. The Contractor shall implement a security program that:
1. Protects the work, the existing premises, and the Government’s operations from theft, vandalism, and unauthorized entry.
2. Initiates a security program in coordination with Government’s existing security system at mobilization.
3. Maintains the security program throughout construction duration until Contract Closeout.
C. The Contractor shall implement entry control to the work area that notifies people of the construction area, of PPE required, and of the dangers of entry.
D. The Government shall not be responsible for the security of any items within the work area and associated PSLs.
1.5 INSURANCE
A. When not required by the Contract clauses, the Contractor has the right to purchase coverage for property insurance, builder's risk insurance (including perils of wind, collapse, vandalism/malicious mischief, and theft, including theft of materials whether or not attached to any structure), and/or flood insurance or to be self-insured for these exposures.
August 27, 2019 Security Requirements
USIBWC Solicitation 191BWC19B0002 00.73.63-Page 2
B. The Contractor shall be held liable for all costs associated with losses, deductibles, and self-insurance for coverages not required by the Contract clauses.
1. Losses shall include architects' and engineers' fees that may be necessary to provide drawings and specifications for the repair and/or replacement of damaged property.
2. Losses shall include appropriate supervision and quality control of all work for the repair and/or replacement of damaged property.
C. Any insurance policies purchased for work or property related to this Contract for coverages not required by the Contract clauses shall list the International Boundary and Water Commission, United States Section, as an additional insured.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
August 27, 2019 Division 01
USIBWC Solicitation 191BWC19B0002 General Requirements-Page 1
United States Section
TECHNICAL SPECIFICATIONS
DIVISION 01
GENERAL REQUIREMENTS
General Requirements Division 01 Division 01-General Requirements
August 27, 2019 Division 01
USIBWC Solicitation 191BWC19B0002 General Requirements-Page 2
August 27, 2019 Summary of Work
USIBWC Solicitation 191BWC19B0002 01.11.00-Page 1
SECTION 01.11.00
SUMMARY OF WORK
01.11.00 Summary of Work 01.11.00-Summary of Work
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Related Requirements
1.3 Reference Standards
1.4 Measurement and Payment
1.5 Work Covered by the Contract Documents
1.6 Sequence of Work/Time for Completion of Work
1.7 Work Under Other Contracts
1.8 Labor and Staffing
1.9 Project Location
1.10 Investigation of Site Conditions
1.11 Other Contractual Requirements
Part 2 - Products
2.1 Government Furnished Materials
2.2 Products to be Furnished by the Contractor
Part 3 - Execution
3.1 Submittals Required Prior to Mobilization
3.2 Use of Right-of-Way
3.3 Occupancy of Right-of-Way
--End of Section--
1.2 RELATED REQUIREMENTS
A. Section 01.32.16-Construction Progress Schedule
B. Section 01.32.33-Photographic Documentation
C. Section 01.33.00-Submittal Procedures
D. Section 01.35.23-Safety
E. Section 01.45.00-Quality Control
F. Section 01.51.00-Temporary Utilities
G. Section 01.52.13-Field Offices and Sheds
H. Section 01.55.00-Vehicular Access and Parking
I. Section 01.57.19-Temporary Environmental Controls
J. Section 01.57.00-Temporary Controls for Work Areas
K. Section 01.74.19-Construction Waste Management and Disposal
L. Section 02.01.00-Existing Conditions & Facilities
USIBWC Solicitation 191BWC19B0002 01.11.00-Page 2
M. Section 02.21.00-Surveys
1.3 REFERENCE STANDARDS
A. United States Code (USC)
1. Davis Bacon Act (DBA), 40 USC §3141-3148
1.4 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.5 WORK COVERED BY THE CONTRACT DOCUMENTS
A. The work for this project generally consists of repairing an approximately one half (0.5) mile segment of floodplain (Vado West Floodplain) to prevent erosion of the floodplain and levee system. This floodplain area will also serve as a rehabilitation project to provide riparian habitat as part of the environmental mitigation associated with the work done on the east levee directly across the Rio Grande. The current floodplain has eroded and fill will be required to re-establish normal boundaries to protect the existing levee system. This fill may come from existing islands inside the main river channel. These islands may also provide willows and other plants necessary to establish a riparian belt on the proposed floodplain site.
B. The major construction efforts include, but are not limited to, the following tasks:
1. Installing gabions.
2. Installing Reno mattresses.
3. Backfilling eroded and excavated areas.
4. Transplanting coyote willows.
5. Planting longstem shrubs.
6. Pole planting trees.
7. Seeding to revegetate site.
8. Maintenance of all vegetation for at least one (1) year.
C. The final product shall consist of a new armored floodplain shall be constructed to meet the operational requirements of the Rio Grande Project and for the purposes of rehabilitating the attendant riparian zone to meet the environmental mitigation obligations stipulated in the Vado East
Levee project (IBM15C0007) while protecting the levee so that it still meets FEMA requirements of
44 CFR §65.10.
1.6 SEQUENCE OF WORK/TIME FOR COMPLETION OF WORK
A. The Contractor shall comply with all submittal requirements as covered under these Technical
Specifications and obtain Government review of each submission.
1. No construction shall be started, until the Government reviews the required submittals and determines they are satisfactory for purposes of beginning construction.
2. The Government will not grant any time extension for any resubmittal required when, in the opinion of the CO, the initial submission failed to meet the minimum quality requirements as set forth in the Contract.
USIBWC Solicitation 191BWC19B0002 01.11.00-Page 3
3. If the Government allows the Contractor to proceed with limited construction based on pending minor revisions to the reviewed submittals, no payment will be made for any in-place construction related to the pending revisions until they are completed, resubmitted and are satisfactory to the Government.
4. No payment will be made for any in-place construction until all submittals required for that portion of the work and/or required prior to the start of construction have been made, reviewed, and are satisfactory to the Government.
B. The work under this Contract shall be completed within the timeframe specified in the Contract
Provisions.
1.7 WORK UNDER OTHER CONTRACTS
No construction work is anticipated to be performed at the…