19-137-08 SCS Engineers_Cost_Proposal (1).pdf

PDF 85 KB Posted

Attached to
Emergency Response Zone Contract
Contract number
19-137-08
Issued by
Wisconsin

About this file

This document is a cost information pricing sheet for WDNR RFP #19-137-08, an Emergency Response Zone Contract involving the Wisconsin Department of Natural Resources (WDNR) and SCS Engineers. The document provides comprehensive pricing for emergency response services that may be required for environmental spill response projects throughout Wisconsin.

The contract covers professional staff services with hourly rates ranging from $70 for Administrative Assistants and Technicians up to $194 for Project Directors in office settings, with separate field/travel rates generally $10-72 lower than office rates. Equipment rental pricing includes air monitoring equipment ($15-85 per day), personal protective equipment ($5-75 per day per person), vehicles ($0.535 per mile to $250 per day), pumps and sampling equipment ($5-120 per day), and containment materials ($1-250 per item). Laboratory analysis costs range from $11 for basic metals testing to $924 for Waste Management Protocol B, with a 10% SCS markup included. The pricing structure covers emergency response equipment inventory including generators, monitoring instruments, protective gear, containment systems, and restoration materials, with quantities available ranging from single units to thousands of items depending on the equipment type.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C OS T I N F OR MA T I ON

WDNR RFP #19-137-08

SCS Staff Types and Rates for Emergency Response Zone Contract This list includes the portion of SCS staff that may be expected to work on the WDNR Emergency Response Zone Contract.

Staff Type Office

Billing Rate Field/Travel Billing Rate

Project Director $194 $122 Senior Project Manager* $153 $122 Project Manager/Senior Project Professional* $122 $112 Project Professional $112 $102 Staff Professional* $108 $102 Associate Professional* $102 $92 Senior Designer/CAD Technician $97 $92 Senior Technician* $92 $92 Project Administrator $87 NA Designer/CAD Technician* $82 NA Technician* $70 $70 Administrative Assistant* $70 NA

* indicates staff most likely to be used on a spill response project and Materials Price List

Equipment Quantity Available Rate Unit

Air Monitoring Equipment Photo-Ionization Detector (PID) 6 $85 day Four gas meter (O2, H2S, CO, %LEL) 3 $75 day Chemical-Specific Detector Tubes $15 each Draeger Tube Pump 2 NC day Personal Air Sampling Pump 2 $30 day

Personal Protective Equipment Level D $5 day per person Modified Level D $15 day per person Level C $50 day per person Level B Not Available Nomex (flame resistant) Coveralls 5 $15 day per person Nitrile Inner Gloves 5,000 NC Neoprene Outer Gloves 20 $12 pair KleenGuard Coveralls 48 $20 ea Tychem CPF 3 Splash Suit 6 $75 ea Respirator Cartridge (OV/AG/P100) 15 $30 pr Disposable Overboots 10 $10 pr

Vehicles Pickup/Van/Car 12 $0.535 mile Spill trailer (14 ft) 1 $200 day Utility Trailer (5 x 8 ft) 1 $40 day Dump Trailer (6 x 10ft, 3 ton acpacity) 1 $175 day Boom Trailer 1 $250 day Boat (14 ft) 1 $40 day

Other Monitoring Equipment & Instruments Landfill Gas Meter (Gem) 1 $120 day GPS - Survey Grade 1 $20 hr GPS - Mapping Grade 2 $50 day Optical/Laser Level 5 $5 hr pH Meter 4 $20 day Water Level Indicator 7 $30 day Oil/Water Interface Probe 3 $70 day Metal Detector 3 $35 day Pipe & Cable Tracer 1 $75 day Scale (0-200g) 8 $25 day

SCS Emergency Response Equipment

Quantity Available Rate Unit

SCS Emergency Response Equipment

Pumps, Bailers & Hose 2-inch Trash Pump (Gas Engine) 2 $45 day 2-inch Trash Pump (Submersible) 1 $30 day 2-inch Diaphragm Pump (electric/explosion proof)

1 $100 day

Lutz-Drum Pump (electric-explosion/proof) 1 $75 day Miscellaneous Hand Pumps 10 $10 day Sump Pump 5 $10 day 2-inch Grundfos Submersible Well Pump 2 $120 day Peristaltic Pump 3 $30 day 2-inch Whale (Submersible Well) Pump 6 $10 day 2" Petroleum Hardwall Hose (25 ft) 4 $15 day 2" Lay Flat Hose 12 $5 day

Other Groundwater Sampling Equipment 1.5-inch PVC Bailer 30 $65 each

1.5 inch Disposable Bailer 20 $15 each Conductivity, Temperature and TDS Meter 2 $20 each Dissolved Oxygen Meter 1 $40 day Field Filters 80 $16 each Field Filtering Apparatus 4 $22 each Well Caps 10 $18 each Brass Well Locks 32 $15 each

Generators & Gas Powered Equip Generator (2 to 4 kW) 5 $50 day Pressure Washer 1 $25 day Air Compressor (5 hp, gas) 1 $40 day Stihl Cut-off Saw 1 $50 day Chain Saw 2 $50 day

Other Electric Powered Equipment Concrete Core Drill 1 $120 day Sawzall 4 $20 day 16-Inch High Volume Blower (explosion proof)

2 $75 day

HEPA Vacuum 1 $40 day Shop Vacuum 4 $15 day Small Power Tools $15 day

Quantity Available Rate Unit

SCS Emergency Response Equipment

Miscellaneous Items CO2 Gas Cylinder w/Regulator 1 $30 50 lb Traffic Control Signs 20 $5 day Lath Stakes 1 $0.75 each

Containers / Containment 55-Gallon Steel Open Head Drums, Unlined

30 $55 each

55-Gallon Poly Closed Head Drums 6 $55 each 500-Gallon Poly Tank 3 $75 day 1,000-Gallon Poly Tank 1 $75 day 95-Gallon Poly Overpack Drum 3 $250 each 10-inch Hard Boom (per foot) 1000 $1.80 day per foot 6 mil Plastic Sheeting (20 x 100 ft) 4 $90 roll

Sorbents Oil Sorbent Boom 8" x 10' 8 $90 each Oil Sorbent Boom 5" x 10' 12 $70 each Oil Sorbent Pad (heavy weight) 300 $1.00 each Granular Sorbent (diatomaceous earth) 40 pound bag

50 $8 bag

Restoration Materials Curlex Blanket Roll w/Staples 4 x 101 ft 5 $65 roll Grass Seed (lb) 30 $5 pound

SCS Emergency Response Laboratory Costs

Analysis Soil Cost Water Cost

GRO $28 $28

DRO $34 $34

GRO/PVOCs $30 $30 GRO/PVOC + Naphthalene $39 $39

PVOC $28 $28

PVOC + Naphthalene $30 $30 VOCs (8260B) $65 $65 SDWA VOCs $0 $118

PAH $72 $72

PCBs $72 $72 Lead $11 $11 TCLP Lead $66 -- Cadmium $11 $11 Paint Filter $13 -- Flash Point $28 $26 TCLP VOCs $120 -- TCLP SVOCs $248 -- TCLP Metals $138 -- Waste Management Protocol B $924 -- RCRA Metals $83 $83

TKN $22 $22

Nitrogen, Ammonia $22 $22 Organic Matter, percent $33 --

TOC $55 $22

Phosphorus $20 $22 Iron $11 $11 Manganese $11 $11 Sulfate $13 $13 pH $11 $11 Total Suspended Solids -- $13 Oil & Grease -- $50 Alkalinity -- $13 Methane -- $44 Hardness -- $11 BOD, Total -- $22 Total Dissolved Solids -- $13

COD $22 $22

* Costs include 10 Percent SCS Markup

cost information
01_SCS ER Labor Rates.pdf
Item 1
Price Lists.pdf
Equipment-2018
Lab 2018
01_SCS ER Labor Rates.pdf
Item 1
Price Lists.pdf
Equipment-2018
Lab 2018

File details come from the government source that posted it. Updated .