18-R. Price Schedule - West District B.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Median Maintenance Services
- Solicitation number
- 269-2026-149
- Issued by
- Mecklenburg County, Charlotte City, North Carolina
About this file
This document is a Price Schedule for a Median Maintenance Services contract for West District B, issued by the City of Charlotte, North Carolina, under RFP #269.2026.149. The contract covers maintenance services for 15 specific median and landscaped areas across various locations in the West District, including parks, roundabouts, road medians, and right-of-way landscaped corners. The contract is structured for three years, with each location requiring 26 weeks of maintenance per year. Locations include areas around Ashley Park, Beam-Shopton Roundabout, Clanton Road, Morris Field Drive, Mulberry Church Road, Remount Road, and several other specified sites.
The price schedule shows zero dollar amounts for each line item and for the total contract value, which suggests this is a template or placeholder document awaiting actual pricing from bidders. The solicitation allows contractors to bid on one or all districts, with the city's intent to award all locations within a given district to a single contractor. The maintenance services encompass comprehensive landscape maintenance, including turf care, tree and shrub maintenance, concrete divider upkeep, debris removal, mulch replacement, and plant replacement. A 5% contingency is built into the pricing structure, indicating potential flexibility for unexpected maintenance requirements.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 RFP # 269.2026.149 Median Maintenance WEST DISTRICT B
| YEAR 1 | YEAR 2 | YEAR 3 | |||||||||
| Item # | Section # | Description | Qnty | Unit | Price | Extended | Price | Extended | Price | Extended | |
| 1 | SP-1 | Ashley Park Medians | |||||||||
| (includes 1 median at 2400 Columbus Cir. and 1 median on Heywood Ave. at Meredith Ave.) | 26 | WK | $ - 0 | $ - 0 | $ - 0 | ||||||
| 2 | SP-1 | Beam-Shopton Roundabout | |||||||||
| (includes Roundabout only at the intersection of Beam Rd. and Shopton Rd.) | 26 | WK | $ - 0 | $ - 0 | $ - 0 | ||||||
| 3 | SP-1 | Clanton Rd. Medians | |||||||||
| (Medians on Clanton Rd. from West Blvd. to Sargent Dr.) | 26 | WK | $ - 0 | $ - 0 | $ - 0 | ||||||
| 4 | SP-1 | Mayfair Connectivity Path | |||||||||
| (2700 Mayfair Ave - includes both sides of walking path to wood line between Mayfair Ave. and Kenhill Dr.) | 26 | WK | $ - 0 | $ - 0 | $ - 0 | ||||||
| 5 | SP-1 | Morris Field Dr. Medians | |||||||||
| (Medians on Morris Field Dr. from Billy Graham Pkwy to Wilkinson Blvd.) | 26 | WK | $ - 0 | $ - 0 | $ - 0 | ||||||
| 6 | SP-1 | Mulberry Church Rd. Roundabout |
(Roundabout at Mulberry Church Rd. and Westport Rd.; includes 3 concrete medians around the perimeter of the roundabout.)
| 26 | WK | $ - 0 | $ - 0 | $ - 0 | ||
| 7 | SP-1 | Remount Rd. Medians | ||||
| (Medians on Remount Rd. from Youngblood St. to West Blvd.) | 26 | WK | $ - 0 | $ - 0 | $ - 0 | |
| 8 | SP-1 | Sheets Circle Median | ||||
| (1 median on Sheets Circle at Tuckaseegee Rd.) | 26 | WK | $ - 0 | $ - 0 | $ - 0 | |
| 9 | SP-1 | Sirus Ln. Median | ||||
| (1 median on Sirus Ln. at Byrum Dr.) | 26 | WK | $ - 0 | $ - 0 | $ - 0 | |
| 10 | SP-1 | Steelecreek Medians |
(includes medians on Steelecreek Rd. from Rigsby Rd. to Shopton Rd. West, medians on Dixie River Rd. from Steele Creek Rd. to Shopton Rd., and 1 median on Shopton Rd. West at Steelcreek Rd.)
| 26 | WK | $ - 0 | $ - 0 | $ - 0 | ||||||
| 11 | SP-1 | Tilden Rd. Median | ||||||||
| (1 Median on Tilden Rd. at Moore’s Chapel Rd.) | 26 | WK | $ - 0 | $ - 0 | $ - 0 | |||||
| 12 | SP-1 | Tyvola Rd. West Medians | ||||||||
| (Medians on Tyvola Rd. West from S. Tryon St. to Sugar Creek bridge) | 26 | WK | $ - 0 | $ - 0 | $ - 0 | |||||
| 13 | SP-1 | West Blvd. Right-of-Way | ||||||||
| (Landscaped Corners on West Blvd. at Old Steele Creek Rd., Clanton Rd., and Remount Rd.; includes 3 landscape beds and 3 medians on West Blvd. at the ramps to I-77 and Revolution Park Dr.; and 1 landscape bed on Markland Dr. at Old Steele Creek Rd.) | 26 | WK | $ - 0 | $ - 0 | $ - 0 | |||||
| 14 | SP-1 | Westinghouse Blvd. Median | ||||||||
| (1 median on Westinghouse Blvd. at Pioneer Ave) | 26 | WK | $ - 0 | $ - 0 | $ - 0 | |||||
| 15 | SP-1 | Wilkinson Blvd. Medians | ||||||||
| (Medians on Wilkinson Blvd. from Suttle Ave. to Billy Graham Pkwy. overpass; also includes 2 triangular medians at the intersection of Stafford Dr./Harlee Ave. at Wilkinson Blvd.) | 26 | WK | $ - 0 | $ - 0 | $ - 0 | |||||
| Subtotal | $ - 0 | $ - 0 | $ - 0 | |||||||
| 5 % Contingency | $ - 0 | $ - 0 | $ - 0 | |||||||
| Total Year -1 | $ - 0 | Total Year -2 | $ - 0 | Total Year -3 | $ - 0 | |||||
| GRAND TOTAL | $ - 0 |
File details come from the government source that posted it. Updated .