17677 Specs.pdf

PDF 636 KB Posted

Attached to
Two Rivers Correctional Institution Intercom and Lighting Controls Upgrade
Solicitation number
S-29100-00017677
Issued by
Oregon

About this file

Summary

This is a comprehensive specification document for the Oregon Department of Corrections (ODOC) outlining the intercom and lighting controls upgrade project at Two Rivers Correctional Institution. The project encompasses replacement of the existing lighting control panels, integration with the current PLC and touch screen systems, and reorganization of the intercom system headend components. The work spans Division 26 (electrical) and Division 28 (electronic security) and includes furnishing and installation of UL-listed low-voltage conductors, raceways, lighting control panels, CAT6 cabling, discrete I/O connections, and all associated hardware. The contractor must maintain continuous facility operation during construction with phasing schedules coordinated with institutional staff, ensure no individual housing unit lighting control system remains offline for more than 10 hours with outages occurring only during daylight hours, and provide shop drawings in AutoCAD format with complete as-built documentation prior to final completion. Work includes system testing in the contractor's shop prior to site delivery, on-site pre-testing before cutover, and final testing in the presence of the owner's commissioning agent and designated maintenance staff.

The contractor must comply with all applicable codes including NFPA-70 and NFPA-72, provide a one-year warranty from final acceptance, and deliver operator and maintenance training consisting of four hours for maintenance staff and two to three hours for operators. The lighting controls contractor must be located within 250 miles of the facility, be factory authorized by the lighting controls manufacturer, and either possess or subcontract the ability to install supporting conduit infrastructure. A qualified detention electronics sub-contractor is required for all touch screen and PLC programming modifications. The project requires extensive coordination meetings with owner's designated maintenance staff, a minimum 5 percent spares inventory (or 1 unit, whichever is greater) of all active electronics, complete operations and maintenance manuals in hard-copy ring binders and digital format, and submission of all existing system software and programming prior to any modifications. Project record drawings documenting all deviations and modifications must be provided in both PDF and AutoCAD format (r2018 or newer) prior to final payment.

View the file

Other files

File Type Posted
17677 Addenda 1.pdf PDF
17677 ITB GTC SC~1.pdf PDF
17677 Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

262103- Intercom and Lighting Controls Upgrade Facilities Services Two Rivers Correctional Institution

Background and Statement of Work

Background: The Oregon Department of Corrections is upgrading the intercom and lighting control systems at Two Rivers Correctional Institution to resolve reliability issues, replace outdated components, and bring the facility’s electrical and electronic security infrastructure up to current standards. The project spans both Division 26 (electrical) and Division 28 (electronic security), requiring careful coordination of new low-voltage cabling, raceways, grounding, lighting control panels, PLC interfaces, and interfacing to the existing touch-screen HMI systems.

Project: The contractor will furnish and install new UL-listed low-voltage conductors, raceways, supports, and associated hardware; integrate new lighting control panels using CAT6 cabling to DOC network IDFs;

and connect all field devices, discrete I/O, and PLC/touch-screen controls in accordance with the specifications. Work includes demolition of affected existing systems, installation of new wiring and components, protection of existing facility finishes, and full coordination with ODOC representatives to minimize disruption. Shop drawings, product data, and AutoCAD-formatted record drawings must be maintained throughout the project, documenting all routing, terminations, and deviations.

The contractor is responsible for sequencing the work to maintain continuous facility operation, adhering to all applicable codes, and providing a clean, safe jobsite. All installed systems must be fully tested, commissioned, and verified to meet performance requirements, with a one-year warranty from final acceptance.

TWO RIVERS CORRECTIONAL INSTITUTION

COMBINED INTERCOM AND LIGHTING CONTROLS UPGRADE PROJECTS

June 30, 2026 Section 26 05 00 - Basic Electrical Requirements Page 1 of 7

SECTION 26 05 00 – BASIC ELECTRICAL REQUIREMENTS

PART 1 GENERAL

1.1 SUMMARY

A. Work included:

1. The Work described in Section 280500 Common Work Results for Electronic Systems is included in this Section as if written herein.

B. Section includes:

1. This Section includes electrical power system requirements that shall be applicable to all Work.

1.2 RELATED SECTIONS

A. 26 05 19 - Low Voltage Conductors and Cables B. 26 05 26 - Grounding And Bonding for Electrical Systems C. 26 05 33 - Raceways And Boxes for Electrical Systems D. 26 40 43 – Lighting Control System E. 28 05 00 - Common Work Results for Electronic Security F. 28 80 00 – Commissioning for Electronic Security

1.3 REFERENCES

A. Comply with the following:

1. ANSI

2. NFPA-70, 72

3. NEMA, 1

4. OSHA

5. IBC

6. U. L.

7. Local Codes and Regulations

8. State of Oregon General Conditions for Public Improvement Contracts (General Conditions)

9. State of Oregon General Conditions for Public Improvement Contracts – Supplemental General Conditions (SGC)

1.4 GENERAL PROVISIONS

A. Provide material, equipment, and systems indicated on the Drawings and specified herein in accordance and in compliance with the State of Oregon General Conditions For Public Improvement Projects, i.e. the “General Conditions”, Section A- General Provisions, Sub-Section A.2- Scope of Work.

B. Refer to Related Sections and the drawings for additional requirements.

June 30, 2026 Section 26 05 00 - Basic Electrical Requirements Page 2 of 7

C. Examine Specifications and Drawings to be familiar with items which require electrical connections and coordination in compliance with the General Conditions, Section A - General Provisions, Sub-Section A.4-Examination of Plans, Specifications, and Site. Coordinate electrical work provided with other Divisions so as to assure proper and complete installation of all connections and equipment.

1.5 DEFINITIONS

A. Terms used on the drawings or in the specifications shall have the following meanings:

1. Approved: An item suggested by the Contractor that is allowed by the

Owner’s Designated Point of Contact (POC) to replace an item listed in the Specifications or Drawings. The burden of proof of equality is the responsibility of the Contractor per the General Conditions, Section B – Administration of Contract, Sub-Section B.19- Substitutions. Owner’s POC to decide.

2. Concealed: Embedded in or below masonry or concrete construction, installed in furred spaces, within partitions, above suspended ceilings, in trenches, crawl spaces or in enclosures.

3. Exposed: Not installed underground or "concealed" as defined above.

4. Furnish: Supply all materials, labor, equipment, testing apparatus, controls, tests, accessories, and all other items customarily required for the proper and complete application for the particular work referred to.

5. Install: Join, unite, fasten, link, attach, set up or otherwise connect together before testing and turning over to Owner, complete and ready for regular operation, the particular work referred to.

6. Provide: "Furnish" and "Install."

7. Owner Furnished, Contractor Installed: The Owner will furnish at his cost and the Contractor shall receive, store and install under his contract for this work.

8. Raceway: All raceways, fittings, hangers, supports, sleeves, etc.

9. National Electrical Code Article 100 definitions apply to Division 16.

10. Adult in Custody (AIC): Any / All areas within the Institution where AIC, have access. Spaces such as electrical rooms, mechanical rooms, and electronics rooms AIC accessible.

1.6 SUMMARY

A. The Division 26 Specifications and Drawings are complementary; what is called for by one is binding, as if called for by both in accordance with the General Conditions, Section A - General Provisions, Sub-Section A.3 – Interpretation of Contract Documents and A.4 Examination of Plans, Specifications, and Site, AND; SGC, Part 1 – Additional Supplemental General Conditions, SGC-2 Add the following new Sections A.3.5 and A.3.6 AFTER A.3.4 (under Interpretation of Contract Documents). Items shown on the Drawings are not necessarily included in the Specifications and vice versa. Where these documents contain a conflict, interpretation will be based on the General Conditions, Section A - General

June 30, 2026 Section 26 05 00 - Basic Electrical Requirements Page 3 of 7

Provisions, Sub-Section A.3 – Interpretation of contract documents, (See Sub- Section A.3.1).

B. All Sections of Division 26, Electrical Specifications, are interrelated. Use Division 26, in its entirety, when interpreting any material, method or direction listed in any Section.

C. Listing and Labeling: Provide products specified in this Section that are listed and labeled. The Terms “Listed and Labeled”: As defined in the National Electrical Code, Article 100.

D. Existing Conditions: Refer to the drawings and related sections.

E. As-built Drawings: Contractor shall maintain at the site one complete set of blue line prints for recording “As-Installed” conditions in accordance with the General Conditions, Section B – Administration of the Contract, Sub-Section B.9 – Access to Records (See B.9.1). Keep “As-Installed” drawings clean, undamaged and up to date as work progresses. Accurately indicate work as actually installed with indications of all deviations, additions and omissions. All As-Installed Drawings shall be on AutoCAD r2018 or newer. Provide revised CD-ROM after approvals.

1.7 CODES AND STANDARDS

A. Perform work specified in Division 26 in accordance with the latest adopted codes and standards listed below and in compliance with the General Conditions, Section B – Administration of the Contract, Sub-Section B.5 – Compliance with Government Laws and Regulations. Where these specifications are more stringent, they shall take precedence. In case of conflict, obtain a decision from the Owner’s Designated Point of Contact (POC).

1. NFPA-70, National Electrical Code.

2. ANSI Electrical Systems.

3. ANSI NEMA-1 Installation Standards.

1.8 INSPECTION AND WARRANTY

A. Guarantee electrical work against faulty material or workmanship for a period of one year from the date of Final Acceptance by the Owner in accordance with the General Conditions, Section I – Correction of Work, Sub-Section I.2 – Warranty Work, AND SGC-13 Sub-Section I.2, Warranty Work, (Add the Following). If the project is occupied or the systems placed in operation in several phases at the request of the Owner, the guarantee of each system or piece of equipment used shall begin on the date each system or piece of equipment was placed in satisfactory operation and accepted as such, in writing, by the Owner in accordance with the General Conditions, Section H – Schedule of Work, Sub-Section H.3 – Partial Occupancy or Use. The use of building equipment for temporary service and testing or phases of work completed prior to the projects acceptance by the Owner does not constitute the beginning of the warranty in accordance with the General Conditions, Section H

– Schedule of Work, Sub-Section H.3 – Partial Occupancy or Use.

1.9 SUBMITTALS

A. General: Submit Product data, for all materials, equipment in all Sections of this

Division as required by individual sections of this specification and in accordance with the General Conditions, Section B – Administration of the Contract, Sub-Section

June 30, 2026 Section 26 05 00 - Basic Electrical Requirements Page 4 of 7

B.18 – Submittals, Shop Drawings, Product Data and Samples, and in accordance with: SECTION 28 05 00 - Common Work Results for Electronic Security.

1.10 SEQUENCING

A. Installation shall be sequenced to minimize disruption of the existing operation of the facility in accordance with the General Conditions, Section H – Schedule of Work, Sub-Section H.3 – Partial Occupancy or Use.

1.11 FEES AND PERMITS

A. Obtain and pay for all necessary permits and inspection fees required for electrical installation in accordance with the General Conditions, Section B – Administration of the Contract, Sub-Section B.4 – Permits.

1.12 PROJECT RECORD DRAWINGS

A. Provide Project Record drawings of Division 26 work in accordance with the

Submittal Requirements of the General Conditions, Section K – Contract Close Out, Sub-Section K.1 – Record Documents AND SGC, SG-16 Section K.1 Record Drawings, including “As a condition of final payment (refer also to General Conditions, Section E.6- Final Payment), Contractor shall comply with the following:

Contractor shall provide to Owner's Authorized Representative, Record Documents of the entire project. Record Documents shall depict the project as constructed and shall reflect each and every change, modification, and deletion made during the construction. Record Documents are part of the Work and shall be provided prior to the Owner's issuance of final payment. Record Documents include all modifications to the Contract Documents unless otherwise directed”.

B. Keep a set of prints at the job site exclusively for recording deviations from the drawings which are necessary because of job conditions in accordance with the General Conditions, Section B – Administration of the Contract, Sub-Section B.9 – Access to Records. Record locations and depths of buried and concealed conduits from fixed, easily identifiable objects, such as building walls or other fixed physical objects. Where conduits are concealed in walls or other fixed physical objects, indicate distances from building corners or other building features not likely to be disturbed by fixture alterations.

C. Prior to Substantial Completion, Contractor shall provide a complete set of electronic CAD drawings in accordance with the General Conditions, Section K – Contract Close Out, Sub-Section K.1 – Record Documents AND SGC, SG-16 Section K.1 Record Drawings, (add the following…). Submit one set of blueprints of these revised drawings for review in PDF format. Make necessary changes and deliver to Owner’s Designated POC one set of reproducibles and one electronic copy in AutoCAD format prior to Final Completion. Coordinate AutoCAD version that these drawings are to be provided in with the Owner’s Designated POC prior to shop drawing preparation and provide in the provided AutoCAD version.

PART 2 PRODUCTS

2.1 MATERIALS AND EQUIPMENT

A. Materials and equipment used in carrying out these specifications shall be new and have UL listing and labeling, or listing and labeling by other recognized testing laboratory when such listings are available.

June 30, 2026 Section 26 05 00 - Basic Electrical Requirements Page 5 of 7

B. Channel and angle support systems, hangers, anchors, sleeves, brackets, fabricated items, and fasteners are designed to provide secure support from the building structure for electrical components.

1. Material: Steel, except as otherwise indicated, protected from corrosion with zinc coating or with treatment of equivalent corrosion resistance using approved alternative finish or inherent material characteristics.

2. Metal Items for Use Outdoors or in Damp Locations: Hot-dip galvanized steel, except as otherwise indicated.

C. Expansion Anchors: Carbon-steel wedge or sleeve type.

D. Toggle Bolts: All-steel springhead type.

PART 3 EXECUTION

3.1 DELIVERY AND STORAGE

A. Deliver items in manufacturers' original packaging in accordance with the General

Conditions, Section B- Administration of The Contract, Sub-Section B.3- Materials and Workmanship. Cover items with protective materials to keep them from being damaged. Use care in loading, transporting, unloading, and storage to keep items from being damaged.

B. Store items in a clean, dry place, and protect from damage. If any item is damaged, do not install, but take immediate steps to obtain replacement.

3.2 COORDINATION

A. Visit site and observe conditions under which work must be performed in accordance with the General Conditions, Section B- Administration of The Contract, Sub-Section A- Examination of Plans, Specifications, and Site.

B. Coordination: Provide all equipment, materials, and labor necessary to provide the systems shown in the drawings and described in this section and all related sections.

C. Drawings are diagrammatic and shall not be scaled for exact sizes. Adjust location of conduits and pull boxes to accommodate the work and to prevent interferences.

1. Make offsets, transitions, and changes in direction in raceways as required to maintain proper headroom pitch of sloping lines.

2. The drawings do not show every offset, bend, conduit body, elbow or junction box that may be required to install work in the space provided and avoid conflicts. Follow the Drawings as closely as is practical and install additional bends, offsets and elbows where needed by local job site conditions. Provide necessary junction boxes to meet code regulations for the allowed number of conduit bends.

D. Provide supports, blocking, hangers, and auxiliary structural members required for support of work.

E. Furnish and set all sleeves for passage of raceways through structural, masonry, and concrete walls, floors, and elsewhere for proper protection of the raceways.

F. Coordinate rough-in for equipment with equipment supplier and installer.

3.3 INSTALLATION

June 30, 2026 Section 26 05 00 - Basic Electrical Requirements Page 6 of 7

A. Verify all dimensions by field measurements.

B. Install systems, materials, and equipment to provide the maximum headroom possible.

C. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed exposed in finished spaces.

D. Install items level, plumb, and parallel and perpendicular to other building systems and components, except where otherwise indicated.

E. Connect for ease of disconnecting, with minimum interference with other installations.

F. Outdoors Supports: Hot-dip galvanized materials or nonmetallic, U-channel system components.

G. Dry Locations Supports: Steel materials.

H. Strength of Supports: Adequate to carry all present and future loads, times a safety factor of at least 4; 200-lb- (90-kg-) minimum design load.

I. Wiring at Outlets: Install with at least 12 inches (300 mm) of slack conductor at each outlet.

J. Install devices to securely and permanently fasten and support electrical components.

K. Demolition:

1. Removal: Remove demolished material from the Project site.

2. Cutting and Patching: Cut, channel, chase, and drill floors, walls, partitions, ceilings, and other surfaces necessary for electrical installations. Perform cutting by skilled mechanics of the trades involved. Repair disturbed surfaces to match adjacent undisturbed surfaces in accordance with the General Conditions, Section F – Job Site Conditions, Sub-Section F.3 – Cutting And Patching.

3.4 FIRE WALL PENETRATIONS

A. Perform necessary fire-rated wall sealing for the electrical work in accordance with the applicable Building Codes.

3.5 EQUIPMENT SUPPORT

A. Provide a system of supporting devices and hangers for support and bracing of conduit and electrical equipment provided under this Division as indicated on plans and as described herein.

B. Support devices in accordance with mounting details shown on drawings. Where mounting details are not provided, comply with NUSIG - National Uniform Seismic Installation Guidelines.

C. Do not install supporting devices so as to obstruct access to equipment.

D. Do not support electrical conduits, conductors, or equipment from other conduits, ceiling grids, equipment, piping, ductwork, or ceiling supports. In all cases, provide independent supports for electrical conduits and equipment.

June 30, 2026 Section 26 05 00 - Basic Electrical Requirements Page 7 of 7

3.6 CUTTING, PATCHING, EXCAVATING AND CORE DRILLING

A. Do not cut or break any steel framing, concrete, masonry, or partitions, etc., without permission from the Owners Designated POC or as shown on the Drawings.

B. Cut, channel, chase and drill floors, walls, partitions and ceilings as necessary for the proper installation, support and anchorage of raceway, boxes, and other equipment.

1. Repair any damage to the building, piping, equipment, or finish in accordance with the General Conditions, Section F – Job Site Conditions, Sub-Section F.3 – Cutting And Patching.

a. Perform repairs with materials matching the original, and install in accordance with appropriate sections of these Specifications.

3.7 WATERPROOFING

A. Avoid, if possible, penetrations of waterproof membranes.

3.8 CLEANING

A. At all times keep the premises free from accumulation of waste materials or rubbish caused by the employees or the work. At the completion of the work, remove all superfluous materials, equipment and debris resulting from the work done under this contract in accordance with the General Conditions, Section F- Job Site Conditions, Sub-Section F.4- Cleansing Up.

B. All equipment, pull boxes, etc., shall be free of debris, filings, clippings, etc., and shall be left clean from dust, dirt and miscellaneous accumulations.

END OF SECTION

June 30, 2026 Section 26 05 19 – Low Voltage Electrical Power Conductors and Cables Page 1 of 2

SECTION 26 05 19 - LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

PART 1 GENERAL

1.1 SUMMARY

A. Work included:

1. The Work described in Sections 280500 Common Work Results for Electronic Systems and 260500 Basic Electrical Requirements is included in this Section as if written herein.

B. Section includes:

1. This Section includes electrical power system requirements that shall be applicable to all Work.

1.2 RELATED SECTIONS

A. 26 05 00 – Basic Electrical Requirements

B. 26 05 26 - Grounding And Bonding for Electrical Systems

C. 26 05 33 - Raceways And Boxes for Electrical Systems

D. 26 40 43 – Lighting Control System

E. 28 05 00 - Common Work Results for Electronic Security

1.3 DESCRIPTION

A. Listing and Labeling: Provide wires and cables specified in this Section that are UL listed and labeled.

PART 2 EQUIPMENT

2.1 PRODUCTS

A. Building Wires and Cables: UL-listed building wires and cables with conductor material, insulation type, cable construction, and rating as specified.

1. Rubber Insulation Material: Comply with NEMA WC 3.

2. Thermoplastic Insulation Material: Comply with NEMA WC 5.

3. Conductor Material: Copper.

B. Connectors and Splices: UL-listed, live spring type, Scotchlok, Ideal Wire Nut, Buchanan B-Cap, or approved equal.

PART 3 EXECUTION

June 30, 2026 Section 26 05 19 – Low Voltage Electrical Power Conductors and Cables Page 2 of 2

3.1 INSTALLATION

A. Branch Circuits: Type THHN/THWN, in raceway.

B. Install wires and cables according to NECA's "Standard of Installation."

C. Pull Conductors: Use manufacturer-approved pulling compound or lubricant where necessary. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values.

D. Use splice and tap connectors compatible with conductor material.

E. Connect outlets and components to wiring and to ground.

F. Color Coding:

1. 120/208: Phase A: black, Phase B: red, Phase C: blue. Neutral and Ground per NEC.

2. 277/480: Phase A: brown, Phase B: orange, Phase C: yellow. Neutral and Ground per NEC.

June 30, 2026 Section 26 05 26 – Grounding And Bonding For Electrical Systems Page 1 of 3

SECTION 26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

PART 1 GENERAL

1.1 SUMMARY

A. Work included:

1. The Work described in Sections 280500 Common Work Results for Electronic Systems and 260500 Basic Electrical Requirements are included in this Section as if written herein.

B. Section includes:

1. This Section includes electrical grounding requirements that shall be applicable to all Work.

1.2 RELATED SECTIONS

A. 26 05 00 – Basic Electrical Requirements

B. 26 05 19 - Low Voltage Conductors and Cables

C. 26 05 33 - Raceways And Boxes for Electrical Systems

D. 26 40 43 – Lighting Control System

E. 28 05 00 - Common Work Results for Electronic Security

F. 28 80 00 – Commissioning for Electronic Security

1.3 REFERENCES

A. Comply with the following:

1. ANSI

2. NFPA-70, 72

3. NEMA, 1

4. OSHA

5. IBC

6. U. L.

7. Local Codes and Regulations

8. State of Oregon General Conditions for Public Improvement Contracts (General Conditions)

June 30, 2026 Section 26 05 26 – Grounding And Bonding For Electrical Systems Page 2 of 3

9. State of Oregon General Conditions for Public Improvement Contracts – Supplemental General Conditions (SGC)

1. 4 DESCRIPTION

A. Comply with NFPA 70.

B. Comply with UL 467.

C. Listing and Labeling: Provide products specified in this Section that are listed and labeled.

1. Listing and Labeling Agency Qualifications: A "Nationally Recognized Testing Laboratory" (NRTL) as defined in OSHA Regulation 1910.7.

PART 2 - EQUIPMENT

2.1 PRODUCTS

A. Wire and Cable Grounding Conductors: Comply with Division 26 Section "Wires and Cables." Conform to NEC Table 8, except as otherwise indicated, for conductor properties, including stranding.

1. Material: Copper.

2. Equipment Grounding Conductors: Insulated with green color insulation.

B. Pressure Connectors: High-conductivity-plated units.

PART 3 EXECUTION

3.1 INSTALLATION

A. Equipment Grounding Conductors: Comply with NEC Article 250 for types, sizes, and quantities of equipment grounding conductors, except where specific types, larger sizes, or more conductors than required by NEC are indicated.

1. Install equipment grounding conductor in all conduits containing power conductors.

2. Liquid tight Flexible Metallic Conduit: Install an equipment grounding conductor.

3. Installation: Ground electrical systems and equipment according to NEC.

B. Connections: Make connections so possibility of galvanic action or electrolysis is minimized. Select connectors, connection hardware, conductors, and connection methods so metals in direct contact will be galvanically compatible.

1. Use electroplated or hot-tin-coated materials to assure high conductivity and to make contact points closer in order of galvanic series.

June 30, 2026 Section 26 05 26 – Grounding And Bonding For Electrical Systems Page 3 of 3

2. Make connections with clean, bare metal at points of contact.

3. Coat and seal connections having dissimilar metals with inert material to prevent future penetration of moisture to contact surfaces.

4. Equipment Grounding-Wire Terminations: For No. 8 AWG and larger, use pressure-type grounding lugs. No. 10 AWG and smaller grounding conductors may be terminated with winged pressure-type connectors.

5. Non-contact Metal Raceway Terminations: Where metallic raceways terminate at metal housings without mechanical and electrical connection to housing, terminate each conduit with a grounding bushing. Connect grounding bushings with a bare grounding conductor to grounding bus or terminal in housing. Bond electrically non-continuous conduits at both entrances and exits with grounding bushings and bare grounding conductors, except as otherwise indicated.

June 30, 2026 26 05 33 – Raceways And Boxes For Electrical Systems Page 1 of 2

SECTION 26 05 33 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

1.1 DESCRIPTION

A. Listing and Labeling: Provide raceways and boxes specified in this Section that are UL listed and labeled.

B. Comply with NECA's "Standard of Installation."

C. Comply with NFPA 70.

PART 2 EQUIPMENT

2.1 PRODUCTS

A. RSC: Rigid Steel Conduit: ANSI C80.1.

B. EMT and Fittings: ANSI C80.3, with set-screw or compression type fittings.

C. LTFMC: Liquid-Tight Flexible Metal Conduit. PVC coated Zinc-coated steel.

D. Fittings: NEMA FB 1; compatible with conduit/tubing materials.

E. Sheet Metal Boxes: NEMA OS 1.

F. Small Sheet Metal Pull and Junction Boxes: NEMA OS 1.

PART 3 INSTALLATION

3.1 EXECUTION

A. Use the following wiring methods: Concealed Dry Locations: EMT.

B. Minimum Raceway Size: 1/2-inch trade size.

C. Complete raceway installation before starting conductor installation.

D. Support raceways as specified in Section 26 26 05 00 - Basic Electrical Requirements.

E. Use temporary closures to prevent foreign matter from entering raceways.

F. Use raceway fittings compatible with raceways and suitable for use and location.

G. Run concealed raceways, with a minimum of bends, in the shortest practical distance considering the type of building construction and obstructions, unless otherwise indicated.

H. Install exposed raceways parallel to or at right angles to nearby surfaces or structural members, and follow the surface contours as much as practical.

June 30, 2026 26 05 33 – Raceways And Boxes For Electrical Systems Page 2 of 2

1. Run parallel or banked raceways together, on common supports where practical.

2. Make bends in parallel or banked runs from same centerline to make bends parallel. Use factory elbows only where elbows can be installed parallel;

otherwise, provide field bends for parallel raceways.

I. Join raceways with fittings designed and approved for the purpose and make joints tight.

1. Make raceway terminations tight. Use bonding bushings or wedges at connections subject to vibration. Use bonding jumpers where joints cannot be made tight.

2. Use insulating bushings to protect conductors.

J. Tighten set screws of threadless fittings with suitable tools.

K. Terminations: Where raceways are terminated with locknuts and bushings, align raceways to enter squarely and install locknuts with dished part against the box.

Where terminations are not secure with 1 locknut, use 2 locknuts: 1 inside and 1 outside the box.

L. Where raceways are terminated with threaded hubs, screw raceways or fittings tightly into the hub so the end bears against the wire protection shoulder. Where chase nipples are used, align raceways so the coupling is square to the box and tighten the chase nipple so no threads are exposed.

M. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and Installer that ensure coatings, finishes, and cabinets are without damage or deterioration at the time of Substantial Completion.

1. Repair damage to galvanized finishes with zinc-rich paint recommended by Manufacturer.

June 30, 2026 26 40 43 – Lighting Control System Page 1 of 12

SECTION 26 40 43 – LIGHTING CONTROL SYSTEM

1.1 SUMMARY

A. Work included:

1. The Work described in Sections 280500 Common Work Results for

Electronic Systems and 260500 Basic Electrical Requirements are included in this Section as if written herein.

B. Section includes:

1. This Section includes electrical power system requirements that shall be applicable to all Work.

1.2 RELATED SECTIONS

A. 26 05 00 – Basic Electrical Requirements

B. 26 05 19 - Low Voltage Conductors and Cables

C. 26 05 26 - Grounding And Bonding for Electrical Systems

D. 26 05 33 - Raceways And Boxes for Electrical Systems

E. 28 05 00 - Common Work Results for Electronic Security

F. 28 05 53 - Identification For Electronic Systems

G. 28 80 00 – Commissioning for Electronic Security

1.3 REFERENCES

A. Comply with the following:

1. ANSI

2. NFPA-70, 72

3. NEMA, 1

4. OSHA

5. IBC

6. U. L.

7. Local Codes and Regulations

June 30, 2026 26 40 43 – Lighting Control System Page 2 of 12

8. State of Oregon General Conditions for Public Improvement Contracts

(General Conditions)

9. State of Oregon General Conditions for Public Improvement Contracts –

Supplemental General Conditions (SGC)

1.4 DESCRIPTION

A. The Work of this Section includes the replacement of all existing Lighting Control Panels inclusive of the demolition of the existing Lighting Control Panels and the reconnection of all field cabling, I/O, communications cable, and the interfaces to existing PLC systems as necessary to provide full lighting controls from:

1. All existing external systems, so as to maintain full control of the lighting including:

a. The existing control panel mounted mechanical switches located at the existing Master Control Room Officer’s Stations and at each of the existing Housing Unit Officer’s Stations; except at the North and South (Disciplinary Segregation Unit - DSU) Officer’s Stations.

b. The existing Touch Screen systems located at the existing North and South DSU Officer’s Stations.

c. Cell mounted touch bolt switches that currently control plumbing chase mounted lighting control relays shall remain functional and shall be confirmed to be fully operational at the end of the project.

2. All existing external system, so as to extend new control of the lighting including:

a. New Touch Screen control of lights at the Housing Units’ Officer’s Stations (except at the North and South DSU Officer’s Stations) so as to replicate at each Officer’s Station Touch Screen computer the existing control panel mounted lighting control switches for all lights within the Housing Unit.

3. The replacement of all system headend lighting control components (nodes).

a. The connections of the nodes to one another shall be on new CAT6 cables connected to existing Ethernet Switches located in the electrical rooms as shown on the drawings.

1) The new lighting control nodes shall be located at, or adjacent to, the existing wall mounted lighting control nodes as necessary to support the UL listing requirements of the new nodes.

2) It is anticipated that between the removal of the existing nodes, and the installation, programming, and final testing of the new nodes, cutover will necessitate the temporary loss of

June 30, 2026 26 40 43 – Lighting Control System Page 3 of 12 lighting control during the construction process. Phasing installation schedule shall be provided and coordinated with Institutional Maintenance and Security Staff to minimize interruption. Lighting circuits in each Housing Unit may be down for a period of up to 4-hours.

3) Phasing the sequence of Housing Units’ order to be upgraded shall be coordinated with the Institution’s Designated Maintenance Staff. It is anticipated that any empty Housing Units will be upgraded in the early phases and the DSU Housing Units upgraded in the last phases.

b. There shall be one location within the lighting control network that will be the single point of communication with the existing PLC system.

This shall consist of a MODBUS PLUS that shall be the electronic interface between the two systems.

1) This interface shall be hard wired electrically through a copper non-proprietary connection. The specific PLC processor and the specific Lighting Control Node to be interfaced through the MODBUS shall be maintained in the same location as is currently implemented.

c. All communications between the existing touch screen computers and the existing PLC systems shall remain in place without change.

Software of both the touch screen computer and PLC’s shall remain the same, but additional programming of both systems shall be provided to facilitate touch screen control of lighting through the PLC system.

1) Software, Touch Screen: Citect through multiple PLC processor manufactures including GE Fanuc, Modicon, M340.

d. Auxiliary lighting control will be provided through new computers to be located at:

1) The existing Maintenance Desk.

2) The existing Master Control Room.

B. Provide replacement of all existing lighting control panels and network together as recommended by the system manufacturer.

1. Provide network cable as necessary. Include all software and programming as necessary to replicate existing operations and functionality.

2. Provide all necessary discrete I/O to replicate existing functionality inclusive of maintaining existing control switch and touch bolt switch control of lighting so as to maintain existing functions through those systems.

C. Provide modifications to the existing Touch Screen system software and PLC system software for Touch Screen control of lighting circuits to replicate the functionality of

June 30, 2026 26 40 43 – Lighting Control System Page 4 of 12 the existing lighting control panels at the Officer’s Stations from the existing Touch Screen Stations.

1. All PLC programming and Touch Screen system programming shall be by Qualified Detention Electronics contractor.

2. All Lighting Control programming shall be by Lighting Control Contractor / Sub-contractor.

3. Coordinate interfaces between systems as required.

D. Programming:

1. Lighting Controls to be programmed by system Manufacture.

2. Touch Screen and PLC programming to be by Qualified Detention Electronics contractor.

3. All new programming of touch screen icons to replicate existing control switch functionality.

4. Contractor to update all existing software for the PLC and Touch Screen systems to the most current versions at the time of construction.

5. The Contractor is to confirm lighting control system programming details with the Owner’s Designated Maintenance Staff during the construction period.

This is specific to what lights are automatically turned on where and when.

Provide two each 4-hour meetings with the Owner’s Designated Maintenance Staff and that the Contractor are to include 16 hours of programming time to implement the Owners coordination requirements.

6. The Contractor is to confirm touch screen control system programming details with the Owner’s Designated Maintenance Staff during the construction period. This is specific to what symbols are used on the touch screens to indicate lights on/off and which lights are to be individually controlled verses to be controlled in groups. Provide two each 4-hour meetings with the Owner’s Designated Maintenance Staff and include 12 hours of programming time to implement the Owners coordination requirements.

E. The Lighting Controls Contractor shall:

1. Be located within 250 miles of the facility.

2. Be factory authorized and licensed by the lighting controls manufacturer.

3. Be or sub-contract all touch screen and PLC system programming to a qualified detention electronics systems Sub-contractor. Sub-Contractors need not be local to the facility but shall have internet access to facilitate programming updates and troubleshooting.

4. The General Contractor shall have either the ability or a Sub-contractor with the ability to install conduit to support the needs of the project. In the event

June 30, 2026 26 40 43 – Lighting Control System Page 5 of 12 that this is a Sub-Contractor, the conduit installation contractor need not have a local office/shop.

5. The Installation Contractor shall obtain necessary permitting and shall be responsible for coordination of all inspections and securing all approvals.

F. System Testing:

1. Shop Testing: The Contractor will be required to have all equipment delivered to its shop and will fully test the equipment within their shop prior to delivery to confirm that there are no out-of-box failures and that all preliminary programming has been done and that all communication paths/protocols have been confirmed to be operational. This will include the Contractor testing:

a. All communications links between the lighting control nodes inclusive of nodes of dis-similar module numbers.

b. The MODBUS PLUS interface.

c. All I/O utilizing the existing discrete switches.

d. Touch Screen system programming.

e. PLC system programming.

f. Lighting Control system programming.

g. Lighting Control Computer system programming.

2. On-Site Pre-testing/Substantial Completion Testing to be done on-site prior to cutover.

3. On-Site Final-testing to be done in the presence of the Owner’s Commissioning Agent, Project Engineer, and Owner’s Designated Maintenance Staff.

G. Project Closeout:

1. Adhere to Section K of GTC’s and applicable sections of SGC’s.

2. Operator and Maintenance system training for both the Lighting Control System and the Touch Screen/PLC systems. To be done:

a. In 2-hour seminars.

b. Utilizing Power Point presentations.

c. Prior to final system cut-over.

d. Maintenance, PLC: 2 hours total.

June 30, 2026 26 40 43 – Lighting Control System Page 6 of 12

e. Maintenance, Lighting: 2 hours total.

f. Operator, Touch Screen: 1 hour total.

g. Operator, Lighting: 2 hours total.

PART 2 EQUIPMENT

2.1 EXISTING EQUIPMENT

A. Existing Low Voltage panels are: Powerline Communications Inc., Control Keeper

B. Existing Low Voltage lighting panels are in two sizes and the I/O boards within them are modular providing 4 circuits per board. Most panels have 4 boards but some have as many 8 (32 point I/O). Refer to the drawings for locations and sizes of existing panels.

2.2 PRODUCTS

A. Lighting Control Laptop Computer, Maintenance Office and Master Control Room: I7, Win11, 16GB, 500GB SSD drive, ethernet port, two USB-C ports, HDMI port, computer. Contractors to install and test all software required by this Section.

a. Dell Pro Rugged 14 Laptop or Approved Equal

B. Lighting Control Computer Software: ETC Unison Paradigm LightDesigner; or approved equal.

1. Environment:

a. Configurable for multiple system configurations.

b. There shall be undo and redo functionality.

c. There shall be an auto-backup feature.

d. Application interface based on:

1) Tree-view.

2) A workspace area, a property editor and item selection.

3) Plan views support zoom. Plan views to support a layout grid with user-defined spacing and color with associated snap-to-grid.

4) Properties inspector used to view and modify the properties of one or multiple objects.

2. System Configuration:

June 30, 2026 26 40 43 – Lighting Control System Page 7 of 12

a. Zones and Fixtures added by selecting a Zone or Fixture Template from the provided library or by create custom Zones or Fixtures.

b. Stations added by selecting a Station Definition from library.

c. Data import feature for system station creation.

d. Set up Wizard for initial setup including Project data entry, Space creation, and network configuration.

e. 2-dimensional plan view displaying layout of Spaces.

f. User-configurable polygon with straight edges for defining spaces.

g. Plan view for displaying Zones, Fixtures and Stations located within Spaces.

1) The plan view displays Walls between Spaces and their current state.

2) Items displayed on the plan can be arranged using drag-and-drop interaction.

3) Imported images can be used as a background image for the plan view.

4) Ability to create Walls for Room Combine between Spaces.

3. Channel Configuration:

a. Functionality to patch Channels to DMX and Streaming CAN.

b. Support for Channels with split patches.

c. Support for multiply-patching a Channel.

d. Swap pan and tilt axes for a moving-light Fixture.

e. Specify a minimum and maximum value for an Attribute.

f. Specify a minimum fade time for an Attribute.

4. Design Simulation:

a. Tabular view of Channel Attributes within Spaces Live control of Zones.

b. Independent control of each Attribute of a Channel.

c. Graphical controls for non-intensity Attributes.

June 30, 2026 26 40 43 – Lighting Control System Page 8 of 12

d. Shortcut for creating groups.

e. Plan view to show current status of Room Combine.

f. Plan view to simulation feedback for Channels in a graphical form.

g. Feedback values for Attributes shall be displayed in terms of real-world units.

h. Control events for simulations by clicking on a representation of the Station.

5. Presets:

a. Ability to record a Preset based on current Attribute settings.

b. Display of Presets that affect Channels in the Space being worked with and their activation status.

c. Preset to store a reference to a Palette as an Attribute setting.

d. Presets to be displayed and modified in tabular form.

e. Timing in Presets may be set on an individual Attribute basis.

f. Timing settings include a fade time, a delay time and a fade profile.

g. All Presets may include split timing.

h. Presets may be applied in an Latest Takes Precedence (LTP) or Highest Takes Precedence (HTP) manner.

i. Easy to create Sequences from Presets.

j. The end state of a Sequence can be user configurable (e.g.

release, loop, hold at end).

6. Stations and Events:

a. Can assign functionality to Controls and Indicators on a Page for a particular Station.

b. Stations have multiple Pages that can be switched.

c. A Control may be configured so that the Actions it triggers behave as if initiated from a specified Space anywhere in

June 30, 2026 26 40 43 – Lighting Control System Page 9 of 12 the System.

d. Controls shall have a priority that is used when performing operations.

e. Import .ics files for display of holidays or other notable dates

f. Timed events, including repeat intervals daily, weekly, etc.

g. Astronomical timed events.

h. Serial input data is treated as a Control event and is handled as a standard or custom action.

i. Support for Occupancy functions using Paradigm Occupancy Sensors.

j. There shall be support for Daylight Harvesting functions using light sensors.

k. Override functionality that can be applied to any Control or Event.

l. Lock Out functionality for Controls.

m. Direct control of Attributes can be assigned to Controls.

n. Mastering of Channel Intensity and can be assigned to Controls.

o. Option to assign default functionality to Controls and Indicators of a Station automatically when it is added to the configuration and update it as the configuration changes.

p. Option to generate a graphic for a Touchscreen automatically based on the current configuration and update it as the configuration changes.

7. Actions:

a. Standard Action for turning Off a particular Channel, Group or Channel within a Space.

b. Standard Action for controlling Channel or Group Intensity levels from a Fader.

c. Standard Action for controlling Preset Intensity levels from a Fader.

d. Standard Action for mastering Channel or Group Intensity levels from a Fader.

e. Standard Action for modifying Preset fade times from a Fader.

June 30, 2026 26 40 43 – Lighting Control System Page 10 of 12

f. Standard Action for modifying Preset rate from a Fader Actions.

8. Macros:

a. Users can create, store and recall Macros that are sequences of Actions.

b. Macros may define separate sequences to occur when turned on and off.

c. Macros may incorporate conditional statements based on current status of the System.

d. Conditional statements may be combinations of several simpler statements using logical operators in a visual drag and drop arrangement.

9. Network:

a. Can associate a particular Station with a Paradigm Processor.

b. Reports online status of Paradigm Processors and Stations.

c. Allows for configuration of network properties (IP) of Paradigm Processors.

d. Allows for download of configuration data from Paradigm Processors.

e. Allows for download of logging data from Paradigm Processors.

f. Allows for transfer of configuration to and from Touchscreen Stations using Paradigm Processors as proxies.

g. Allows for discovery and binding of Stations.

10. Reports: Generates tabular reports and customize their layout and appearance.

11. Mosaic: Supports configuration for easy integration with Unison Mosaic

C. Lighting Control Panels: N-Light; or approved equal.

1. Panel dimensions shall not be greater than 18” W by 8” D. Height may vary depending on the number of I/O and relays to be provided but shall not exceed 48”.

2. Each panel shall be equipped with I/O to match existing to be demolished.

Note: Not all of the existing I/O is utilized and was originally provided to

June 30, 2026 26 40 43 – Lighting Control System Page 11 of 12 support future. The new system shall maintain this future capacity of installed I/O inclusive of installed relays.

3. Panels shall be provided with internal modular I/O boards in 16-, 32-, and 48-point models.

2.3 SPARES

A. Provide a minimum of 5% or 1, whichever is greater spares inventory of all active electronics including but not limited to lighting panels (by type), and I/O boards (by type). Exception: No spare laptop computer is required.

PART 3 INSTALLATION

3.1 EXECUTION

A. Installation timeline:

1. System Pre-Testing: Prior to disconnecting or demolishing the existing Lighting Panels, temporarily mount the new panels near the existing and interface them with the existing PLC system. Program the Touch Screen computers, the PLC system, and the new Lighting Control system and test for operation of relay actuation upon Touch Screen icon on/off selection.

a. Upon successful system pre-testing, notify the Owner’s Designated Point of Contact for readiness and retest the system in the presence of the Owner’s Commissioning Agent.

2. System Cut-Over: Upon receipt of the Commissioning Agent’s approval to proceed, begin demolition of the existing Lighting Control system and installation of the new system.

a. All Work shall be coordinated and scheduled at a time convenient to the Owner and at least 2 weeks in advance.

b. No Housing Unit Lighting Control System shall be down or off-line for more than 10 hours and all loss of lighting shall occur during daylight hours.

3.2 CLOSEOUT ACTIVITIES

A. As-Built Drawing Submission: Upon approval of the as-built drawings, scale down the full size equipment cabinet elevation sheets to the maximum size that fits within the associated cabinet door, laminate the sheets, and mount them on the inside of the cabinet doors on hooks to allow ease of reference and temporary removal by the maintenance staff during trouble-shooting operations.

B. Demonstration:

1. Maintenance Instruction: Provide 4 hours of Owner’s Designated Maintenance Staff instruction.

June 30, 2026 26 40 43 – Lighting Control System Page 12 of 12

2. Operational Instruction: Provide 2 hours of Operator’s instruction.

C. Provide as required by Section K of GTC’s and associated Sections in SGC’s.

June 30, 2026 Section 28 05 00 – Common Work Results for Electronic Security Page 1 of 30

SECTION 28 05 00 – COMMON WORK RESULTS FOR ELECTRONIC SECURITY

PART 1 GENERAL

1.1 SUMMARY

A. Section includes: This Section includes requirements that shall be applicable to all

Work described in Divisions 26 and 28:

1. Provide all equipment, materials, and labor necessary to provide the systems shown in the Drawings and described in this Section and Related Sections.

This shall include, but not be limited to: all active and passive electronics and all enclosures and their supporting hardware, backboards, cable, pull ropes, connectors, boxes conduit, and all other devices necessary to make the systems fully operational and meeting the performance requirements of this Section and Related Sections unless specifically noted otherwise.

2. Definitions

3. Referenced Standards

4. Design Requirements

5. Existing Conditions

6. Phasing

7. Related Sections

8. Quality Assurance

9. Contractor/Owner Meetings

10. Network Security

11. Testing

12. Specification and Drawing Interpretation

13. Submittals

14. Sequencing and Scheduling

15. Acceptable components.

16. Substitutions.

17. Source quality control.

18. Installation.

19. Acceptable Installers

20. System startup.

21. Site quality control.

22. Training

23. Closeout activities.

June 30, 2026 Section 28 05 00 – Common Work Results for Electronic Security Page 2 of 30

B. All General Requirements of Section 26 05 00 - Basic Electrical Requirements and all Sections of the State of Oregon General Conditions and Oregon Department of Corrections Supplemental General Conditions are included within this Section as if written within this Section.

C. Have a single security systems subcontractor perform the Work of this section and the following Integrated Sections:

1. 28 05 27 - Racks and Cabinets for Electronic Security.

2. 28 05 53 - Identification for Electronic Security.

3. 28 80 00 - Commissioning for Electronic Security

1.2 REFERENCES

A. Definitions:

1. All definitions listed in the National Electrical Code are recognized in this Section unless other specific definitions are given in this Section.

2. “AHJ” means the Authority Having Jurisdiction and includes all applicable code authorities and other entities as defined in the NFPA including but not limited to the Electrical Inspector, Building Inspector, Fire Marshal, and others having statutory authority.

3. “ANSI” means American National Standards Institute. Copies of ANSI standards are available from the National Conference of States on Building Codes and Standards, Inc.

4. “Appliance” means an electrical component which utilizes electricity to accomplish an end affect.

5. “ASTM” means the American Society for Testing and Materials. Copies of ASTM documents are available from ASTM International.

6. “AWG” means American Wire Gauge.

7. “Baffle” means speaker grille.

8. “BCT”: Bonding conductor for telecommunications.

9. “CCR” means Central Control Room.

10. “Certified” means that the equipment has been documented that it has been tested and found by a nationally recognized testing laboratory to meet nationally recognized standards and to be safe for use for its intended purpose; if production is periodically inspected by a…

This is the start of the file's text. The full file is on GovTribe.