167-25_Specs_2025-01-07_Bid_Doc..pdf
PDF 134 KB Posted
- Attached to
- Competitive Selection OH|DOT16725-1
- Contract number
- DOT16725-1
- Issued by
- Ohio
About this file
This document is an Invitation to Bid (ITB) issued by the Ohio Department of Transportation (ODOT) District 3 for janitorial services at the Grafton Outpost Facility located at 1654 Avon-Belden Road in Grafton, Lorain County, Ohio. The solicitation is specifically ITB 167 for Grafton Outpost Janitorial Services and is designed to establish contract pricing for comprehensive cleaning services at the specified transportation facility.
The contract will cover janitorial services to be performed one day per week from July 1 to November 30 and May 1 to June 30, and two non-consecutive days per week from December 1 to April 30, excluding state-observed holidays. The contract duration is from the date of award through June 30, 2026, with an optional one-year renewal that could extend the contract to June 30, 2027. The vendor will be responsible for providing all labor, equipment, materials, and cleaning supplies necessary to perform the required services. The contract will be awarded to the lowest responsive and responsible bidder based on the calculated total contract cost, which is determined by multiplying the daily rate by the number of service days for each year. The facility is relatively small, with 706 total cleanable square feet, including lobby/hallway/office, restroom, and lunchroom areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 167-25_Pricing_2025-01-07.xlsx | XLSX spreadsheet | |
| Affirmation_and_Disclosure__17_.pdf | ||
| ODOT_Terms___Conditions_with_excel_pricing.pdf | ||
| Signature__4___1___002_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB 167 GRAFTON OUTPOST JANITORIAL SERVICES
REQUIREMENTS/SPECIFICATIONS
Section 1: Intent
The purpose of this invitation is to establish contract pricing for janitorial services for the Ohio
Department of Transportation District 3 at the Grafton Outpost Facility in Lorain County, 1654
Avon-Belden Road Grafton, OH 44044. Vendor shall provide all labor, equipment, material, and incidental items necessary to perform the required services, all in accordance with specifications terms and conditions contained herein.
Section 2: Contract Duration
The effective period of this contract shall be from Date of Award, through June 30, 2026, with one
(1) optional one (1) year renewal that could extend the end date to no later than June 30, 2027.
The vendor shall provide all personnel, equipment and cleaning supplies (unless otherwise noted herein) to provide janitorial services one (1) day per week, from July 1 to November 30 and May 1 to June 30 annually, and two (2) non-consecutive days per week, from December 1 to April 30 annually, excluding state observed holidays listed below.
New Year's Day January 1st
Martin Luther King Day the 3rd Monday in January
President's Day the 3rd Monday in February
Memorial Day the last Monday in May
Juneteenth June 19th
Independence Day July 4th
Labor Day 1st Monday in September
Columbus Day 2nd Monday in October
Veteran's Day November 11th
Thanksgiving Day 4th Thursday in November
Christmas December 25th
Section 3: Award
Award of the contract will be made to the lowest responsive and responsible bidder based on the calculated total contract cost for services price determined by multiplying the daily rate by the number of days of service for each year and adding all years together, all in accordance with the specifications herein.
Vendors must submit their Bid Responses electronically in OhioBuys before the published deadline date & time, Columbus, Ohio local time on the Proposal due date. Vendors will not be able to submit Bid Responses, or unsolicited Proposal amendments after the deadline.
Vendors must allow adequate time for uploading a Bid Response prior to the due date and time.
ODOT recommends that vendors submit Bid Responses as early as possible. If a second round is issued for any reason, vendors must resubmit their bid if they had already submitted in a previous round, as the previously submitted Bid Responses do NOT carry over to the new round.
The Signature process takes place after the award now. The email will come from documents@esign.ohio.gov and will go to the signatory that was identified in the bid submission.
The subject line will be the bid # Signature Request, (example: 101G-25 Signature Request).
No contract can be issued to your company until we receive your signature to complete the process. And you must have an OAKS Payor ID before a contract can be issued. To obtain that, you will need to go into https://ohiopays.ohio.gov.
Section 4: Site Visit
Vendors are encouraged to visit the site to fully understand all requirements of this Invitation.
Those interested may contact Dick Feldkamp by telephone at (419) 207-7122 to schedule a site visit.
Section 5: Working Hours
1. Services shall normally be performed between the hours of 7:30 AM and 7:30 PM. The District
Designated Representative may approve other hours when deemed necessary to accomplish the specified work.
2. The Department reserves the right to discontinue service temporarily due to inclement weather.
A minimum of four (4) hour notice must be given to the Contractor for a proportional amount to be reduced or suspended in the payment.
3. It shall be understood that, from time to time, facilities may be opened or closed during the life of the contract. The District designated representative will provide a minimum thirty (30) day notice to the vendor of the anticipated closure of site(s) serviced in accordance with this contract.
4. Vendor shall notify the District Designated Representative of staff absences and contingency plan not less than one (1) hour prior to start of regular work time.
5. Most ODOT Facilities operate on a Monday through Friday work schedule. When a holiday falls on a Saturday, it shall be observed on the preceding Friday. When the holiday falls on a Sunday, it shall be observed on the following Monday.
Section 6: General Requirements
The intent of these specifications is to provide custodial maintenance services, furnishing adequate supervision, labor and supplies to accomplish all required custodial services. All work shall be performed in accordance with the specifications and schedules set forth herein. There shall be no exceptions or deviations to any part, or from approved schedule without prior written approval of the District designated representative. Contractor shall be deemed to have knowledge of the nature of the work and areas to be cleaned.
Section 7: Description of Premises
1. Total amount of cleanable SF in building: 706
a. Lobby/Hallway/Office: 174
b. Rest Room: 76
c. Lunchroom: 456
Section 8: Materials and Supplies
Vendors shall furnish, without additional cost, all materials and supplies required to perform the scope of work. Vendor shall always keep adequate quantities of properly labeled supplies on hand in the facility to perform the contracted services. Vendor shall furnish, without additional cost, the following consumable items for facility staff and customers:
• Hand soap
• Toilet Paper
• Waste can liners
• Air fresheners
• Urinal deodorant screens or liquid urinal deodorizer (“urinal blocks” not permitted) https://ohiopays.ohio.gov/
• Hand drying towels
• Entry mats of appropriate size (where required)
• All paper products shall be submitted to the District designated representative prior to final selection and shall meet the minimum requirements below.
o Toilet paper shall be minimum 2 ply product o Hand towels shall be roll type (where applicable)
• If dispensers for any paper products or hand soap need installed or replaced, the vendor shall provide the dispensers and coordinate replacement with the District designated representative prior to installing new units.
Section 9: Services to be Provided
1. Vestibule and Office
a. Daily Tasks
1. Empty trash receptacles/reline as needed
2. Polish/disinfect drinking fountain
3. Vacuum entry mats
4. Dust Mop floors
5. Wet Mop floors
6. Clean entry door glass and all other entry glass
b. Weekly Tasks
1. Dust vinyl chairs
2. Dust Desks/Tables
3. Dust Bookshelves/File Cabinets
4. Dust Wall Hangings
5. Sanitize office phones
6. Dust Windowsills and frames
7. Empty ash urns
8. Remove tar from floors as needed
c. Monthly Tasks
1. Dust venetian blinds
2. Vacuum upholstered furniture
3. Spot clean high traffic walls as needed
4. Machine scrub floors
5. Dust/Wipe lockers
6. Clean and organize janitor closet
d. Semi Annual Tasks
1. Clean interior windows
2. Clean exterior windows
3. Clean waste receptacles
4. Thoroughly clean upholstered furniture
e. Annual Tasks
1. Thoroughly wash walls
2. Dust ceiling/wall air vents/registers
3. Clean light lenses
2. Rest Room
a. Daily Tasks
1. Clean/disinfect toilet
2. Clean/disinfect urinal
3. Clean/polish sink and fixture
4. Empty and reline trash receptacles
5. Polish/refill soap dispensers
6. Polish/refill towel dispensers
7. Replenish toilet paper
8. Polish Mirrors
9. Sweep/dust mop floors
10. Wet mop/disinfect floors
b. Weekly Tasks
1. Remove tar from floors as needed
c. Monthly Tasks
1. Spot clean high traffic walls
2. Machine scrub floors
3. Clean waste receptacles
d. Semi Annual Tasks
1. Thoroughly wash walls
e. Annual Tasks
1. Dust ceiling/wall air vents/registers
2. Clean light lenses
3. Ready Room
a. Daily Tasks
1. Empty and reline trash receptacles
2. Vacuum entry mats
3. Polish/refill soap dispensers
4. Polish/refill towel dispensers
5. Wipe/Clean built in counter surfaces
6. Wipe/Clean sink counter surfaces
7. Wipe/Clean tables
8. Wipe/Clean chairs
9. Wipe/Clean exterior of appliances
10. Clean/polish sinks and fixtures
11. Dust Mop floors
12. Wet Mop floors
b. Weekly Tasks
1. Dust Windowsills and frames
2. Remove tar from floors as needed
c. Monthly Tasks
1. Dust venetian blinds
2. Vacuum upholstered furniture
3. Spot clean high traffic walls
4. Machine scrub floors
5. Clean waste receptacles
d. Semi Annual Tasks
1. Clean interior windows
2. Clean exterior windows
3. Thoroughly wash walls
4. Thoroughly clean upholstered furniture
e. Annual Tasks
1. Dust ceiling/wall air vents/registers
2. Clean light lenses
Section 10: Responsibility
The awarded vendor shall be responsible for replacing in kind all equipment, materials, and fixtures damaged by them or their employees during the performance of services. The vendor shall also be responsible for all liability in connection with the performance of this contract. Any telephone usage shall be limited to performance of services at this site and any long-distance charges shall be deducted from compensation.
Section 11: Cancellation/Modification of Contract
This contract may be canceled at the request of the Director of Transportation due to the contractor's failure or inability to satisfactorily perform the work as per 108.08 of the Construction and Materials Specifications. This contract may be canceled by either party upon receipt of a thirty
(30) day written notice. This contract may be modified in writing by agreement of the parties hereto.
Section 12: Subcontracting
The awarded bidder(s) will perform work amounting to not less than one hundred (100) percent of the Contract price with its own organization, unless otherwise approved by the Department. The phrase “its own organization” includes only workers employed and paid directly, inclusive of employees who are employed by a lease agreement acceptable to the Department, and equipment owned or rented with or without operators by the vendor. The phrase does not include employees or equipment of a subcontractor, assignee, or agent of the vendor.
The vendor’s percentage of the total Contract Price includes the cost of materials and manufactured products purchased by the vendor, but not the cost of materials and manufactured products purchased by subcontractors.
Vendor shall not subcontract any of the work covered by the contract unless specifically authorized to do so by ODOT. All subcontracting will be supplied to ODOT at cost with no vendor markup.
The vendor will be required to submit copies of invoices from subcontractor(s) as proof of costs.
Contractor will be fully responsible for making all subcontractor payments and ensuring that subcontractors follow all laws, rules, safety procedures and ODOT expectations as though they were the Contractor.
Section 13: References
All vendors shall provide contact information upon request of the Department, for a minimum of two (2) references for which services have been rendered within the past 24 months.
Section 14: Inspection
Department personnel may inspect the performance of work on the next working day. Vendor of record shall agree to meet with District Designated Representative for any subsequent review required as follow up to deficiency corrections.
Section 15: Unsatisfactory Performance
In the event of unsatisfactory performance on a given day or days, the Department may deduct a whole day or one-half day payment depending upon the extent of the unsatisfactory performance as determined by the District Deputy Director or their designated representative. The vendor shall be notified by the Department of any unsatisfactory performance within five (5) days, excluding
Saturdays, Sundays, and holidays. The Department also reserves the right, in the event of any unforeseen emergency, to have the vendor return to restore the location to an acceptable standard of cleanliness and safety. If the vendor fails to respond to the callback, the Department may deduct a day's pay. Should the vendor fail to complete the performance of any specified service, the
Department may deduct the total cost to hire another vendor to complete the work satisfactorily from the payment for service(s) rendered. The Department reserves the right to non-perform or order additional work.
Section 16: Billing
If satisfactory work is performed, the vendor shall receive monthly payments within thirty (30) days for work complete and accepted as satisfactory and in accordance with these specifications.
Payment shall be based on the daily rate bid times the number of days of service performed in the month, as noted on purchase order. The bid rate shall be the total cost for each occurrence of services provided as specified.
Two (2) copies of each invoice are to be sent to the Ohio Department of Transportation, at the address below. Vendors must provide on each invoice the vendor’s Tax ID number, the purchase order number for the work performed, a description of the work performed, and date(s) performed.
ODOT District 3 Facilities
Attn: Facilities Program Administrator
906 Clark Avenue
Ashland, OH 44805-1989
In the event of contract termination, payment in full for services rendered shall be based on each occurrence where work performed and accepted as complete and satisfactory in accordance with these specifications.
Section 17: Right to Audit
The Ohio Department of Transportation reserves the right to audit all invoices submitted by a
Vendor. In addition, when discrepancies arise, the vendor will be required to pay the difference of the amount quoted in the contract and the amount charged on the invoice, plus twenty percent
(20%) of the amount invoiced or fifty dollars ($50.00), whichever is more.
Section 18: Public Liability Insurance
The bidder must furnish proof with their bid that they carry public liability insurance with limits of not less than three hundred thousand ($300,000) dollars for any one person and one million
($1,000,000) dollars for any one occurrence.
All insurance policies required under this section shall include an endorsement requiring the insurance company to give thirty (30) days prior written notice to ODOT before any change or cancellation becomes effective. All insurance policies shall be through insurance companies licensed to conduct business in the State.
Section 19: Chemicals and Cleaning Supplies
In accordance with OSHA 29 CFR 1910.1200 Hazard Communication Standard a chemical inventory listing all products used, manufacturers name, and copies of Material Safety Data Sheets/Safety
Data Sheets (MSDS/SDS) used in performing work outlined in these specifications shall be submitted at least annually to and approved by the District Designated Representative. This information shall also be kept and maintained in each facility. In case of an emergency both the inventory and MSDS/SDS must be readily accessible. All chemical product containers must be properly labeled.
Section 20: Background Check Screening
By submitting this invitation to bid, the bidder verifies to the Department that the employees it is placing in ODOT facilities have successfully passed the vendor’s own background check screening.
Section 21: Miscellaneous
1. After all facility services have been completed the premises shall be left in a neat and orderly condition.
2. Vendor of record shall be responsible for disposal of all liquid and solid waste from performance of this contract. At no time shall the vendor of record bring items to or on ODOT properties for disposal. All chemicals utilized in performance of this contract shall meet with the approval of the District Designated Representative and shall be in accordance with the rules of the Ohio Environmental Protection Agency. In no circumstance shall any chemical be disposed of improperly.
3. Vendor’s employees shall sign in and out with the designated representative, including arrival and departure times. Sign In/Out sheets shall be reviewed by the vendor and originals shall be submitted to ODOT with monthly invoicing.
4. The vendor shall sign for the keys they receive for each facility maintained. In the event keys are lost, the vendor shall be responsible for re-keying the facility at the current market rate of approximately $2500.00.
5. Upon completion of daily contracted services, the vendor shall scan the facility for any unusual conditions and report as necessary.
Section 22: Pricing
Vendors shall submit pricing F.O.B. the locations provided, all in accordance with the specifications, terms and conditions. Pricing shall be guaranteed firm for the contract duration.
1. Daily per occurrence cost for Period 1 janitorial services
2. Daily per occurrence cost for Period 2 janitorial services
3. Daily per occurrence cost for the OPTIONAL Period 3 janitorial services
File details come from the government source that posted it. Updated .