This document contains an amendment to a federal solicitation and related questions and answers. The amendment extends the period of performance to 120 calendar days from notice to proceed for a firm-fixed price construction contract awarded by the Federal Bureau of Prisons. The purpose of the contract is to remove any remaining components of an existing lightning protection system and install a new lightning protection system on all buildings at the Federal Correctional Institution in Marianna, Florida. The amendment deems it acceptable to install aluminum components on aluminum coping caps and equipment before transitioning to copper, and to adhere lightning protection cables directly to the roof membrane after coordinating sealing procedures. A UL Letter of Findings Limited Scope Inspection Certification is the required inspection for the completed installation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

00003

Amendment 00003 is issued to incorporate the attached Questions & Answers into 15B30820B00000001.

[End of Amendment 00003]

Federal Bureau of Prisons Southeast Regional Office 3800 Camp Creek Parkway, SW, Building 2000 Atlanta, GA 30331

Federal Bureau of Prisons Federal Correctional Institution 2651 FCI Road Marianna, Florida 32446

0143-20

15B30820B00000001

3C8C

1 1

07/31/2020

07/06/2020

Invitation for Bid 15B30820B00000001

FCI Marianna, Install Lightning Protection Questions and Answers

# Contractor Question FBOP Response

1 Can we extend the project completion time for 120 days? Yes, the period of performance has been extended to 120 calendar days from Notice to Proceed. See Amendment 00002.

2 Specifications state a copper system is required but it will need to be aluminum because of the coping cap and units are aluminum.

Aluminum is permissible to be installed on coping caps and equipment which is aluminum and then transition to copper as required. See Amendment 00002.

3 Is it permissible to adhere directly to the roof membrane? If so, we will need a letter stating we can do so without being liable for any leak issues.

Adhering to the roof membrane is permissible for strapping the lightning protection cables to the roof. Contractor must coordinate with COR for sealing of any necessary roof penetrations to avoid water intrusion into buildings. A letter will be provided with acceptable procedures for adhering to the roof system.

4 Will a third party inspection be required i.e. UL Inspector? If so, it will have to be a limited scope certification since we cannot certify existing grounding.

Yes. UL Letter of Findings Limited Scope Inspection Certification is sufficient. Refer to Scope of Work, 3.4 Field Quality Control.

5 Is it permissible to make penetrations on standing seam roofs where existing lightning rods need to be repaired?

The new roofing system located at the FPC housing will require new roof penetrations. All existing lightning rods are required to be replaced, not repaired. See Scope of Work/Specifications, 1.

Specifications, C. Scope of Work, #1 and #3.

6 We feel like a 75 day project duration would not be a reasonable amount of time for the scope of work to be completed. Can the total project duration be extended to 120 day?

Yes, the period of performance has been extended to 120 calendar days from Notice to Proceed. See Amendment 00002.

Invitation for Bid 15B30820B00000001

FCI Marianna, Install Lightning Protection Questions and Answers

7 UL96A requirements will not allow copper to be installed on metal coping or other roof top equipment that will pose galvanic corrosion concerns. Will it be acceptable to install aluminum conductor for all roof top work, then transition to copper for down conductors and grounding?

Aluminum is permissible to be installed on coping caps and equipment which is aluminum and then transition to copper as required. See Amendment 00002.

8 If it is determined that there is an insufficient number of down conductors, will it be acceptable to install a new down conductor on the exterior of the building leading to a buried grounding rod?

Yes.

9 Section 1.4 B of 26.41.13 is crossed out indicating that a UL Letter of Findings will not be required for this project. Then section 3.4 A states that a Letter of Findings will be required. Will we be required to provide a UL Letter of Findings for each building upon completion of the project?

Yes. Refer to Scope of Work, 3.4 Field Quality Control.

10 If a letter of findings is required, is an LPI Limited Scope Certification a suitable alternative to a UL letter of findings?

Yes, a UL Letter of Findings Limited Scope Inspection Report is required. No, a LPI Limited Scope Certification is not a suitable alternative. Refer to Scope of Work, 3.4 Field Quality Control.

E. A. Muncy, Acting FA, SERO bop03112 Approved