1412186879- Addendum 2 - Due Date Extended.pdf
PDF 3 MB Posted
- Solicitation number
- 1412186879
- Issued by
- Duval County, Florida
About this file
This is Addendum Number 2 to a solicitation issued by the Jacksonville Electric Authority (JEA) Procurement Department for District II Building 6 Renovations—Design Phase (Solicitation 1412186879). The addendum extends the response due date from July 28, 2026, to August 4, 2026, with the time of receipt remaining 12:00 PM ET. The project requires professional design services to renovate an existing building into a storage facility with locker rooms, showers, and restrooms. Minimum scope requirements include one ADA-compliant male shower, one ADA-compliant female shower, one ADA-compliant female restroom, one ADA-compliant male restroom, two additional female restrooms, and three additional male restrooms. Optional hoteling workspaces may be considered only after minimum requirements are met and only if adequate space remains. A mandatory site visit was conducted on July 23, 2026, and a mandatory pre-response meeting occurred the same day via Microsoft Teams.
The addendum clarifies key responsibilities: contractors must remove existing equipment, storage, and materials as part of the demolition plan; asbestos surveys will be included in design services with the engineer responsible for COJ submission for approval and permitting; any abatement work identified will be the general contractor's responsibility. Respondents are required to complete a List of Subcontractors Form for use of Jacksonville Small and Emerging Business (JSEB) subcontractors, with the form provided as Addendum 2 Appendix B. The addendum includes photographic documentation of Building 6 roof conditions observed during the site visit to provide additional clarity on existing conditions. Evaluation is qualifications-based with scoring weights of 30 points for professional staff experience, 30 points for design approach and workplan, 30 points for company experience with similar projects, up to 5 points for JSEB subcontractor use, and up to 5 points for office proximity within 50 miles of JEA headquarters. Contract pricing is firm fixed for the first year with Consumer Price Index adjustments capped at 3% annually thereafter, and the successful respondent must maintain $1,000,000 in commercial general liability coverage and $1,000,000 in excess umbrella coverage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1412186879- Addendum 1.pdf | ||
| 1412186879 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement Department Bid Section 225 North Pearl Street
Jacksonville, Florida 32202 July 27, 2026
ADDENDUM NUMBER: Two (2)
TITLE: District II Building 6 Renovations – Design Phase 1412186879
RESPONSE DUE DATE: August 04, 2026
TIME OF RECEIPT: 12:00 PM ET
THIS ADDENDUM IS FOR THE PURPOSE OF MAKING THE FOLLOWING CHANGES OR
CLARIFICATIONS:
1. Change: The Response Due Date has been extended from July 28, 2026, to August 4, 2026. The Time of
Receipt remains the same.
2. Question- Demolition Package: A. The existing equipment, storage, and materials are to be removed as part of the demolition plan or will JEA remove all loose material and equipment?
Answer- The removal of the existing equipment, storage, and materials is part of the demolition plan and is the contractor’s responsibility.
3. Question- Demolition Package: B. The building will require an asbestos survey and potential abatement. Does
JEA have a current AB Survey? If not, will JEA secure one or will it be part of the Design Services?
Answer- An asbestos survey will be part of the design services. The engineer will also be responsible for submitting the design to COJ for approval/permitting.
4. Question- Demolition Package: B. If any items requiring abatement are identified, will JEA address that work or will this be delegated to Design Contract for General Contractor for removal.
Answer- Any items identified as requiring abatement will be the responsibility of the general contractor.
5. Question- Demolition Package: B. Please clarify the amount of potential “Hoteling” work spaces are desired as a design option.
Answer- The addition of ‘hoteling’ workspaces is not part of the minimum project scope requirements. After all the minimum project scope requirements are met, optional workstations may be considered only if adequate space remains and only in the quantity the space allows to maximize its use. As stated in 1412186879 Appendix
A - Technical Specifications, the project scope is to renovate the existing building into a storage room, with lockers, showers, and restrooms added adjacent to the storage area. This includes, at a minimum, but is not limited to, the following:
• One (1) ADA compliant male shower
• One (1) ADA compliant female shower
• One (1) ADA compliant female restroom
• One (1) ADA compliant male restroom
• Two (2) female restrooms
• Three (3) male restrooms
6. Question- The instructions say to complete the List of Subcontractors Form for use of JSEB subcontractors.
Will a form be provided?
Answer- Yes, please see 1412186879 Addendum 2 – Appendix B List of Subcontractors Form.
7. The photos below are included to provide clarification regarding the Building 6 roof conditions observed during the site visit.
ACKNOWLEDGE RECEIPT OF THIS ADDENDUM ON THE RESPONSE FORM