Q_As_-_Navajo_Drilling_Traffic_Control_Services_(Phase_2)_0001.docx
DOCX document 15 KB Posted
- Solicitation number
- 140R4024Q0040
About this file
This document is a set of Questions and Answers related to Solicitation #140R4024Q0040 for Navajo Drilling Traffic Control Services (Phase 2).
The solicitation is a Total Small Business Set-Aside under NAICS code 561990 with a $16.5M size standard. It is a new requirement, but the agency previously awarded a Phase 1 contract under Solicitation #140R4024C0010. The solicitation is seeking traffic control services in New Mexico in accordance with the provided Statement of Objectives (SOO). Key details include:
- No specific budget amount provided, vendors are to submit quotes based on the SOO requirements
- Period of performance details are included in the SOO
- Contractor will be responsible for overnight traffic control equipment and on-call response
The document provides responses to 5 questions related to the contract history, budget, duration, and setup/teardown requirements. Vendors are instructed to refer to the SOO for details not covered in the Q&A.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Navajo Drilling Traffic Control Services (Phase 2) Solicitation# 140R4024Q0040 Questions/Answers – 31 May 2024
Question #1: Is this a new contract or did someone have it in the past?
Answer: This is a new requirement; however, Navajo Drilling Traffic Control Services (Phase 1) was awarded on 140R4024C0010. Award Notice available on SAM.gov for your reference.
Question #2: Is there a budget number that can be shared? ?
Answer: Please submit quote based on the requirements stated in the Statement of Objectives (SOO).
Question #3: How many days will be needed total for the project?
Answer: Please refer to the Statement of Objectives, Period of Performance.
Question #4: How many days will the setup be needed?
Answer: Please refer to the Statement of Objectives, Period of Performance.
Question #5: Will the setup stay up for multiple days or just be setup each day needed and taken down at night?
Answer: The road closure on NM539 and single-lane closure on NM511 are intended to be left in-place overnight for the duration of work in each location. Traffic control equipment inspection and on-call response will be the responsibility of the contractor.