This document provides electrical panel and building details for facilities located at the Staircase area of Olympic National Park. The National Park Service Pacific West Region is soliciting to replace the primary 20 kW standby generator used at the Staircase Grid, which currently runs seven days a week for twelve hours a day from April through September. Facilities detailed include the generator building, gas house, fire cache, fee booth, ranger station, maintenance shop, kiosk, two comfort stations, bunkhouse, two RV pedestals, chalet, pump house and the hydro building. Electrical panel information is provided for each facility, including main breaker sizes and circuit breaker allocations. The largest power draws are noted as 500 watt baseboard heaters, well pumps, and occasional power tools.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Staircase Area Primary Generator, OLYM, newest first.
File Type Posted
Sol_140P8323Q0084_Amd_0003.pdf PDF
Sol_140P8323Q0084_Amd_0002.pdf PDF
Amendment_1_Attachment_4_Q_and_A_0001.pdf PDF
Sol_140P8323Q0084_Amd_0001.pdf PDF
Attachment_1_Terms_Provisions_Clauses.pdf PDF
Attachment_3_DOL_SCA_Wage_Rates.pdf PDF
Attachment_2_Statement_of_Work.pdf PDF
Sol_140P8323Q0084.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Staircase Rapids Electrical Panel and Building Details

Generator Building

70 amp - main breaker

1. 40 amp - two pole for Ranger station and housing

2. 40 amp – two pole for fee booth, fire cache, and gas house

3. 20 amp – lights

4. 20 amp – one GFCI

Notes

• Inside dimensions of building for fitting of generator 13’6”L x 8’ W x 7’1” H

• Meters have never been read/recorded (no data for consumption)

• 20 Kw standby generators have always produced enough power for Staircase Grid

• Standby generators currently run 7 days a week, 12 hours a day, 6 months of the year, they are shut down at night and run very infrequently in the winter

• Maintenance staff report no tripped breakers due to light load

• Appliances with high energy demand are all on propane (cook tops, refrigerators, dryers etc.)

Figure 1. Generator Building

Solicitation (Request for Quotation) no. 140P8323Q0084 - Amendment 1 Attachment 5 - Staircase Generator Electrical Panel Info

Replace Staircase Area Primary Generator, OLYM

Figure 2. Inside Generator Building

Figure 3. Generator Room panel

Figure 4. Generator 70 amp main breaker for whole compound

Figure 5. Generator Room panels

Gas House

40 amp – main braker

1. 20 amp two pole for Fee Booth

2. 15 amp for lights

3. 15 amp for one socket

Notes

• Very little use and power draw

Figure 6. Gas House

Figure 7. Gas House panel

Fire Cache

100 amp – main breaker (only needs to be 20 amps)

1. 20 amp for lights

2. 20 amp for sockets

• Very little use and power draw

Figure 8. Fire Cache

Figure 9. Fire Cache panel

Fee Booth

50 amp – main breaker

1. 20 amp two pole for 500w base board heater

2. 20 amp lights

3. 20 amp computer

4. 20 amp outside lights

5. 20 amp outlets

Notes

• 500w heater is the biggest draw

• Everything else could be on one 20 amp circuit

Figure 10. Fee Booth

Figure 11. Fee Booth panel

Ranger Station

40 amp – main breaker toggleable to 20 amp for hook up for a standalone generator

1. 15 amp for lights

2. 15 amp for lights

3. 15 amp for lights

4. 15 amp for plugs

5. 15 amp for plugs

6. 15 amp for plugs

7. 20 amp to pole for 500w heater

• Biggest draws are 500w heater, microwave, and computer

Figure 12. Ranger Station

Figure 13. Ranger Station panel

Maintenance Shop

60 amp – main breaker

1. 15 amp lights

2. 20 amp plugs

3. 20 amp plugs

4. 20 amp two pole for comfort stations in campground

Notes

• Highest draw would be infrequent power tool use

• The extras panels in the photo were for controlling the heat sink from the now out of commission hydro dam

Figure 14. Maintenance Shop

Figure 15. Maintenance Shop panel and defunct hydro heat sink controller

Kiosk

• one 20 amp breaker for lights

Notes

• not sure where the feeder comes from, it’s most likely from the ranger station or comes off the line running to the comfort stations

Figure 16. Kiosk

Figure 17. Kiosk breaker box

Comfort Station Number 1

30 amp – main breaker

1. 20 amp 2 pole for male bathroom heat

2. 30 amp 2 pole for female bathroom heat

3. 15 amp lights

4. 20 amp fan and lights

• Largest draws would be heaters.

Figure 18. Comfort Station 1 panel

Figure 19. Comfort Station 1

Comfort Station #2

No Main Breaker

1. 15 amp for lights

2. 20 amp for plugs

Notes

• Not sure where the feeder for this comfort station is coming from, but most likely the other comfort station

• Photo of panel is missing

Figure 20. Comfort Station 2

Bunkhouse

20 amp - main breaker

1. 15 amp 2 pole

2. 20 amp

3. 20 amp

4. 20 amp

5. 20 amp

6. 20 amp

7. 20 amp

8. 15 amp

9. 15 amp

10. 15 amp

11. 15amp

Notes

• Dryer runs on propane, but this will probably need to be electric in the future as it’s getting hard to find propane clothes dryers

Figure 21. Bunkhouse

Figure 22. Housing area meters on side of the Bunkhouse

Figure 23. Bunkhouse panel

RV Pedestal #1

20 amp - main breaker

Figure 24. RV Pad 1

Chalet

1. 15 amp lights

2. 15 amp lights

3. 15 amp lights

4. 15 amp plugs

5. 15 amp plugs

6. 15 amp plugs

7. 20 amp for RV pad # 2

Figure 25. Chalet

Figure 26. Chalet Panel

RV pad #2

1. 20 amp breaker – located on Chalet panel

Figure 27. RV Pad 2

Pump House

1. 20 amps plugs

2. 20 amps plugs

3. 15 amps lights

4. 15 amps lights

5. 15 amps 2 pole for pump

• The larges draw is the pump which is a 1 hp 10 amp max draw

Figure 28. Pump House

Figure 29. Pump House Panel

Hydro

15 Amp – Main Breaker

1. 20 amp for a plug

2. 15 amp lights

3. 15 amp

Notes:

• The hydro generator was 15KW

• When the hydro was functioning, the whole area was serviced by a 60 amp breaker

Figure 30. Hydro Generator

Figure 31. Hydro panel