This document contains questions and answers regarding solicitation number 140P8123Q0080 for the supply of a precast concrete building for Mojave National Park. The National Park Service will prepare the site and foundation, and the contractor is responsible only for supplying and placing the precast concrete building unit. Key specifications for the building include concrete walls with integral color and a painted concrete roof. Interior and vent painting are also required. The project is considered a supply-only contract and will not require any onsite construction, permitting, or Davis Bacon wage rates since no contractor construction work is involved.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8123Q0080_Amd_0001.pdf | ||
| A04_Specs_Mobile_Concrete_Utility_Building.pdf | ||
| Sol_140P8123Q0080.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P8123Q0080 AMENDMENT #1 8-17-23
Questions and answers:
1. Site is prepared by NPS – will they provide bench mark or survey points for concrete structure or do we need to include survey in the proposal. This is a supply only. Contractor simply needs to place the unit on our foundation.
2. Will the site be graded, compacted etc. for the slab? Yes. This is a supply only. Contractor simply needs to place the unit on our foundation.
3. Is this a design build project or does scope require a structural engineer or architect design services. This is a supply only. NPS will install.
4. What type of door is required, hollow metal, aluminum, etc? See basis of design in specs.
5. Is hardware required? See basis of design in specs.
6. What size vent? Do we need to hire a mechanical engineer to provide venting requirements? Not specified by NPS. See basis of design in specs.
7. Item 2.7 notes Roof is gabled with “cedar shingle looking texture” note 4 says it’s a painted gable roof, can you clarify exactly what is needed. See basis of design in specs. Concrete roof that is painted.
8. Item 2.4 notes, stucco textured and painted exterior walls – clarify if both is required or if we can use integral color with stucco. See basis of design in specs. Integral color is approved.
9. Are we required to paint the interior walls? Yes.
10. Are we required to paint the vent? Not specified.
11. Confirm this is a federal project and no permits are required from San Bernadino or any other AHJ’s. Supply only, no permits required.
12. Will Davis Bacon rates apply to this project? Supply only. No onsite construction by contractor.