CUVA_FAA_Notice_Criteria_Tool_0001.pdf

PDF 165 KB Posted

Attached to
Retaining Wall Replacement
Solicitation number
140P6425B0008
Issued by

About this file

The document is a Federal Aviation Administration (FAA) Notice Criteria Tool Desk Reference Guide that provides guidance for filing construction notifications with the FAA. The tool helps determine whether a proposed structure requires FAA notification based on factors such as height, proximity to airports, location, and frequency emissions. For the specific example provided, a mobile construction equipment structure located at 41°05'24.1"N, 81°31'00.1"W with a height of 60 feet and site elevation of 864 feet was evaluated. The result indicates that the structure does not exceed the FAA's Notice Criteria, meaning no additional filing is required at this time.

The guide outlines scenarios that would necessitate FAA filing at least 45 days prior to construction, including structures that exceed 200 feet above ground level, are near airports and exceed slope ratios, involve traverseway construction, emit certain frequencies, are in instrument approach areas, or might impact navigation signal reception. Users are advised to consult the appropriate FAA representative using the Air Traffic Areas of Responsibility map for off-airport construction or contact the FAA Airports Region/District Office for on-airport construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

« OE/AAA

Notice Criteria Tool - Desk Reference Guide V_2018.2.0

Notice Criteria Tool

The requirements for filing with the Federal Aviation Administration for proposed structures vary based on a number of factors: height, proximity to an airport, location, and frequencies emitted from the structure, etc. For more details, please reference CFR Title 14 Part 77.9.

You must file with the FAA at least 45 days prior to construction if:

If you require additional information regarding the filing requirements for your structure, please identify and contact the appropriate FAA representative using the Air Traffic Areas of Responsibility map for Off Airport construction, or contact the FAA Airports Region / District Office for On Airport construction.

The tool below will assist in applying Part 77 Notice Criteria.

* Structure Type: CONSTRUCTION | Mobile Construction Equipment Please select structure type and complete location point information.

Latitude: 41 Deg 05 M 24.1 S N

Longitude: 81 Deg 31 M 00.1 S W

Horizontal Datum: NAD83

Site Elevation (SE): 864 (nearest foot)

Structure Height : 60 (nearest foot)

Is structure on airport: No

Yes

Results You do not exceed Notice Criteria.

your structure will exceed 200ft above ground level your structure will be in proximity to an airport and will exceed the slope ratio your structure involves construction of a traverseway (i.e. highway, railroad, waterway etc...) and once adjusted upward with the appropriate vertical distance would exceed a standard of 77.9(a) or (b) your structure will emit frequencies, and does not meet the conditions of the FAA Co-location Policy your structure will be in an instrument approach area and might exceed part 77 Subpart C your proposed structure will be in proximity to a navigation facility and may impact the assurance of navigation signal reception your structure will be on an airport or heliport filing has been requested by the FAA http://www.faa.gov/ https://oeaaa.faa.gov/oeaaa/external/portal.jsp https://oeaaa.faa.gov/oeaaa/downloads/external/content/deskReferenceGuides/Notice%20Criteria%20Tool%20-%20Desk%20Reference%20Guide%20V_2018.2.0.pdf https://www.ecfr.gov/current/title-14/part-77 https://oeaaa.faa.gov/oeaaa/external/public/aorMap.jsp https://www.faa.gov/airports/regions https://www.govinfo.gov/content/pkg/FR-2022-07-05/pdf/2022-14306.pdf

File details come from the government source that posted it. Updated .