This file is an attachment to a solicitation for the JECA HVAC Replacement opportunity issued by the Department of the Interior National Park Service Midwest Region. The solicitation seeks proposals to replace the heating, ventilation, and air conditioning systems at various facilities. Offerors should provide pricing to remove existing HVAC equipment and install new high-efficiency systems, including all necessary ductwork, controls, and components. Proposals are due by April 15, 2023, with award expected by June 1, 2023. The contract will have a one-year base period of performance with two one-year option periods. This project has been set aside for small businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Solicitation_Amendment_3_Attach_1_Q_and_A_2_Jan_17_2024__0003.docx | DOCX document | |
| Sol_140P6324B0003_Amd_0003.pdf | ||
| Sol_140P6324B0003_Amd_0002.pdf | ||
| Sol_140P6324B0003_Amd_0001.pdf | ||
| B09_Solicitation_Amendment_1_Attach_1_Site_Visit_List_0001.pdf | ||
| B09_Solicitation_Amendment_1_Attach_2_Question_and_Answers_0001.docx | DOCX document | |
| B08_Solicitation_attach_2_Drawing_Spec_1_of_4.pdf | ||
| B08_Solicitation_attach_7_WD_SD20230025_Nov_17__2023.pdf | ||
| B08_Solicitation_attach_5_Drawing_Spec_4_of_4.pdf | ||
| B08_Solicitation_attach_1_SOW.pdf | ||
| Sol_140P6324B0003.pdf | ||
| B08_Solicitation_attach_6_Government_Clarification_Responses.pdf | ||
| B08_Solicitation_attach_4_Drawing_Spec_3_of_4.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
325415 /
80043
C U s e rs
\z b e n n e tt \D o c u m e n ts
\0
-M
E C
H R z b e n n e tt J T
T G
W .r v t
JEK
MLB
ARP
2/24/23
07310.034
M 03
SHEET SPECIFICATIONS -
MECHANICAL
07310034- 5- M 03 SHEET SPECIFICATIONS - MECHANICAL
HVAC REPLACEMENT
JEWEL CAVE NATIONAL MONUMENT
CUSTER, SD
DATE INITIAL
2/24/23
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
325415 /
80043
C U s e rs
\z b e n n e tt \D o c u m e n ts
\0
-M
E C
H R z b e n n e tt J T
T G
W .r v t
JEK
MLB
ARP
2/24/23
07310.034
M 04
SHEET SPECIFICATIONS -
MECHANICAL
07310034- 5- M 04 SHEET SPECIFICATIONS - MECHANICAL
HVAC REPLACEMENT
JEWEL CAVE NATIONAL MONUMENT
CUSTER, SD
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
325415 /
80043
C U s e rs
\z b e n n e tt \D o c u m e n ts
\0
-M
E C
H R z b e n n e tt J T
T G
W .r v t
JEK
MLB
ARP
2/24/23
07310.034
M 05
SHEET SPECIFICATIONS -
MECHANICAL
07310034- 5- M 05 SHEET SPECIFICATIONS - MECHANICAL
HVAC REPLACEMENT
JEWEL CAVE NATIONAL MONUMENT
CUSTER, SD
CWR
CWR
CWR
CWS
CWS
HWS
HWR
SA
RL
RS
HWR
HWS
OA
STAIR
3/4" LPG
3/4" LPG
LPG
(TYP.)
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
325415 /
80043
C U s e rs
\z b e n n e tt \D o c u m e n ts
\0
-M
E C
H R z b e n n e tt J T
T G
W .r v t
JEK
MLB
ARP
2/24/23
07310.034
M000
DEMOLITION FLOOR PLAN -
MECHANICAL
07310034- 5- M000 DEMOLITION FLOOR PLAN - MECHANICAL
HVAC REPLACEMENT
JEWEL CAVE NATIONAL MONUMENT
CUSTER, SD
REF. DEMO NOTES ( ):X
1 REMOVE EXISTING HOT WATER BOILER AND ASSOCIATED BOILER PUMP
AND FLUE. PREPARE FOR INSTALLATION OF NEW BOILER.
2 REMOVE EXISTING AIR COOLED CHILLER. REMOVE EXISTING CONCRETE
PAD AND PREPARE FOR NEW INSTALLATION.
3 REMOVE EXISTING CHILLED WATER PIPING INCLUDING ACCESSORIES
AND HANGERS.
4 PENETRATIONS THROUGH BUILDING MAY BE REUSED FOR NEW
REFRIGERANT LINES. CONTRACTOR TO GROUT OPENING AND PAINT TO
MATCH ADJACENT CONDITION.
5 REMOVE EXISTING CHILLED WATER PUMP, COORDINATE WORK WITH THE
ELECTRICAL CONTRACTOR.
6 REMOVE EXISTING CHILLED WATER BUFFER TANK, EXPANSION TANK, AND
MAKEUP WATER CONNECTION. CAP DOMESTIC WATER PIPING.
7 REMOVE THE EXISTING CONDENSING UNIT, INCLUDING ASSOCIATED
REFRIGERANT PIPING.
8 REMOVE EXISTING DUCTWORK SECTION AS SHOWN.
9 REMOVE LPG PIPING BACK TO VALVE AND CAP AS SHOWN.
10 REMOVE HYDRONIC HOT WATER SUPPLY AND RETURN PIPING AS SHOWN,
INCLUDING ALL ACCESSORIES AND HANGERS.
0 3 6 9 ''''
NORTHSCALE: 1/4" = 1'-0"
SUB-GRADE PLAN - DEMO HVAC PIPING
DATE INITIAL
KEY PLAN NORTH
RTU-1
18x12 EX
700 3
2(TYP.)
WOMENS
MENS
MECH
VESTIBULE
WORKROOM
114CORRIDOR
117A
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
EXHIBIT ROOM
CORRIDOR
LOBBY
VESTIBULE
STAIR
GUIDES
ELEVATOR
LOBBY
LOBBY EXHIBIT
PARK STORE
HALL
CORRIDOR
SECRETARY
3/4" G
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
325415 /
80043
C U s e rs
\z b e n n e tt \D o c u m e n ts
\0
-M
E C
H R z b e n n e tt J T
T G
W .r v t
JEK
MLB
ARP
2/24/23
07310.034
M001
DEMOLITION FLOOR PLAN -
MECHANICAL
07310034- 5- M001 DEMOLITION FLOOR PLAN - MECHANICAL
HVAC REPLACEMENT
JEWEL CAVE NATIONAL MONUMENT
CUSTER, SD
REF. DEMO NOTES ( ):X
1 REMOVE GROUND MOUNTED ROOFTOP UNIT, ASSOCIATED LPG PIPING,
AND THE CONCRETE PAD. REMOVE PIPING BACK TO THE MAIN AND CAP.
2 REMOVE EXISTING DUCTWORK SECTION AS SHOWN.
3 REMOVE EXISTING SUPPLY GRILLE AND ANY DUCTWORK TO EXTENT
POSSIBLE, CAP DUCTWORK BEHIND CONSTRUCTION. PATCH CEILING TO
MATCH ADJACENT CONDITION.
4 REMOVE LPG PIPING IN SPACE BELOW FLOOR AS SHOWN. PATCH HOLES
IN BUILDING CONSTRUCTION AS REQUIRED TO MATCH ADJACENT
CONDITION.
5 REMOVE HYDRONIC HOT WATER SUPPLY AND RETURN PIPING AS SHOWN,
INCLUDING ALL ACCESSORIES AND HANGERS.
6 REMOVE EXISTING CHILLED WATER PIPING INCLUDING ACCESSORIES
AND HANGERS.
7 CAP AND INSULATE RETURN GRILLES BELOW FLOOR.
8 ABANDON OUTDOOR SECTION OF DUCTWORK IN PLACE.
SCALE: 1/8" = 1'-0"
FIRST FLOOR DEMOLITION PLAN - MECHANICAL
0 6 12 18 ''''
NORTH
DATE INITIAL
H W
R H
W S
HWS
HWR
CWS
CWR
CWR
CWS
RS
RL
RA
HWS
HWR
SA
STAIR
WORKROOM
FAN ROOM
STORAGE
C W
R C
W S
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
325415 /
80043
C U s e rs
\z b e n n e tt \D o c u m e n ts
\0
-M
E C
H R z b e n n e tt J T
T G
W .r v t
JEK
MLB
ARP
2/24/23
07310.034
M002
DEMOLITION FLOOR PLAN -
MECHANICAL
07310034- 5- M002 DEMOLITION FLOOR PLAN - MECHANICAL
HVAC REPLACEMENT
JEWEL CAVE NATIONAL MONUMENT
CUSTER, SD
REF. DEMO NOTES ( ):X
1 REMOVE EXISTING RETURN FAN AND ASSOCIATED RETURN DUCTWORK.
2 REMOVE EXISTING FAN COIL, ASSOCIATED PIPING, CONTROLS AND
DUCTWORK AS SHOWN.
3 REMOVE EXISTING MIXED AIR PLENUM ALONG BACK WALL AND REOPEN
OUTSIDE AIR INTAKE BY REMOVING PLYWOOD.
4 REMOVE EXISTING CHILLED WATER PIPING AS SHOWN.
5 REMOVE EXISTING DUCTWORK SECTION AS SHOWN.
6 ABANDON REFRIGERANT PIPING BEHIND PERMANENT CONSTRUCTION ON
THIS LEVEL AND THE FLOOR BELOW.
7 REMOVE HYDRONIC HOT WATER SUPPLY AND RETURN PIPING AS SHOWN,
INCLUDING ALL ACCESSORIES AND HANGERS.
0 3 6 9 ''''
NORTHSCALE: 1/4" = 1'-0"
SECOND FLOOR DEMOLITION PLAN - MECHANICAL
DATE INITIAL
UH-(E)
HWS
HWR
STAIR
ELEVATOR
MACHINE
ROOM
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
325415 /
80043
C U s e rs
\z b e n n e tt \D o c u m e n ts
\0
-M
E C
H R z b e n n e tt J T
T G
W .r v t
JEK
MLB
ARP
2/24/23
07310.034
M003
DEMOLITION FLOOR PLAN -
MECHANICAL
07310034- 5- M003 DEMOLITION FLOOR PLAN - MECHANICAL
HVAC REPLACEMENT
JEWEL CAVE NATIONAL MONUMENT
CUSTER, SD
REF. DEMO NOTES ( ):X
1 REMOVE THE EXISTING ELEVATOR EQUIPMENT ROOM AIR HANDLER AND
ASSOCIATED REFRIGERANT PIPING. COORDINATE LIMITED DOWNTIME
WITH OWNER TO PREVENT OVERHEATING OF ELEVATOR ROOM.
2 REMOVE FLUE UP THROUGH ROOF AND PATCH ROOF OPENING WATER
TIGHT. REPAIR OPENING IN DRYWALL CEILING, AND PAINT TO MATCH
ADJACENT CONDITION.
3 REMOVE HYDRONIC HOT WATER SUPPLY AND RETURN PIPING AS SHOWN,
INCLUDING ALL ACCESSORIES AND HANGERS.
0 3 6 9 ''''
NORTHSCALE: 1/4" = 1'-0"
THIRD FLOOR DEMOLITION PLAN - MECHANICAL
Existing Louver Located Above Ceiling and Capped Off
DATE INITIAL
T
ACCU-1
CU-1
HWP-1
HWP-2
AS-1
ET-1
HWS
12x4 SA
3/4" HWR
3/4" HWS
B-1
3/4" HWR
3/4" HWS
10 Ø SA
VAV-1
STAIR
2" HWS
2" HWR
DSS-1B
RL/RS UP
RL/RS
HOUSEKEEPING PAD
3/4" LPG
HWR
3/4" CD
TO (E) FD
RL UP
RLRL
RSRS
RS UP
RL UP
RL
RS
RS UP
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
325415 /
80043
C U s e rs
\z b e n n e tt \D o c u m e n ts
\0
-M
E C
H R z b e n n e tt J T
T G
W .r v t
JEK
MLB
ARP
2/24/23
07310.034
M100
FLOOR PLAN - MECHANICAL
07310034- 5- M100 FLOOR PLAN - MECHANICAL
HVAC REPLACEMENT
JEWEL CAVE NATIONAL MONUMENT
CUSTER, SD
1 SIZE AND INSTALL REFRIGERANT PIPING PER MANUFACTURER'S
REQUIREMENTS AND THE SPECIFICATIONS. ALL PIPE PENETRATIONS
SHALL BE DONE VIA A CORE DRILL TO BE NEAT AND CLEAN.
2 EXTEND VENT AND INTAKE PIPING FOR BOILER TO OUTSIDE WALL AND
TERMINATE WITH MANUFACTURER APPROVED CONCENTRIC VENT.
3 3/4" BOILER MAKE-UP WATER; CONNECT TO EXISTING MAKE-UP WATER.
PROVIDE NEW RPZ BACKFLOW PREVENTER, SHUTOFF VALVE, AND
PRESSURE REDUCING VALVE.
4 INSTALL NEW CONDENSING UNITS ON TO EXISTING PADS.
5 3" CPVC BOILER INTAKE AND VENT PIPING. INSTALL PER
MANUFACTURER'S REQUIREMENTS.
6 INSTALL NEW THERMOSTAT 48" A.F.F. FOR CONTROL OF VAV BOX.
PROVIDE INSULATED BASE IF REQUIRED ON EXTERIOR WALL.
7 INSTALL VAV BOX ABOVE ACCESSIBLE LAY-IN CEILING.
8 PROVIDE NEW EXTERIOR HOUSEKEEPING PAD UNDER CONDENSING UNIT
0 3 6 9 ''''
NORTHSCALE: 1/4" = 1'-0"
SUB-GRADE PLAN - HVAC
REF. NOTES ( ):X
DATE INITIAL
T
T
T
T
F
F
VAV-7
VAV-8
VAV-4
VAV-2 VAV-3
VAV-6
14x12 SA
SA
RA
RA
SA
x S
A
14x8 SA
14 Ø SA
1" HWR
1" HWS
1 1/4" HWR
1 1/4" HWS
3/4" HWS
3/4" HWR
1" HWS
1" HWR
1 1/4" HWS
1 1/4" HWR
16x14 SA
14 Ø SA
12 Ø
3/4" HWR
3/4" HWS
10x6 SA
10x6 S-1
8x6 S-1
(TYP. 5)
(TYP.)
6 Ø SA
3/4" HWS
3/4" HWR
1" HWR
1" HWS
6' R-1
STORAGE
SECRETARY
EXHIBIT ROOM
OFFICE
OFFICE
OFFICE
OFFICE
WOMENS
MENS
MECH
VESTIBULE
WORKROOM
CORRIDOR
LOBBY
CORRIDOR
VESTIBULE
HALL
PARK STORE
LOBBY EXHIBIT
ELEVATOR
LOBBY
GUIDES
STAIR
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
(TYP. 4)
(TYP. 3)
6 Ø S-1
6 Ø S-1
20x8 RA
20x18 SA
10 Ø SA
9 Ø SA
EX
EX
EX
EX
EX
EX
EX
EX
20x14 RA
RA
SA
SA
S A
SA
SA
EX
RA
2" HWR UP
2" HWS UP
RL/RS UP
EX
RS UP
RL UP
RL UP
RS UP
10x6 SA UP
14x4 EX
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
325415 /
80043
C U s e rs
\z b e n n e tt \D o c u m e n ts
\0
-M
E C
H R z b e n n e tt J T
T G
W .r v t
JEK
MLB
ARP
2/24/23
07310.034
M101
FLOOR PLAN - MECHANICAL
07310034- 5- M101 FLOOR PLAN - MECHANICAL
HVAC REPLACEMENT
JEWEL CAVE NATIONAL MONUMENT
CUSTER, SD
REF. NOTES ( ):X
1 INSTALL NEW DUCT AND GRILLES IN SOFFIT, SEE ARCHITECTURAL PLAN
FOR DETAILS.
2 INSTALL NEW THERMOSTAT 48" A.F.F. FOR CONTROL OF VAV BOX.
PROVIDE INSULATED BASE IF REQUIRED ON EXTERIOR WALL.
3 INSTALL VAV BOX ABOVE EXISTING CEILING, COORDINATE NEW CEILING
ACCESS WITH ARCHITECTURAL PLANS.
4 ROUND DUCT WILL BE EXPOSED IN THIS LOCATION. DUCTWORK SHALL BE
DOUBLE WALL CONSTRUCTION WITH PAINT GRIP OUTER SURFACE FOR
PAINTING TO MATCH WALL COLOR.
5 INSTALL NEW RETURN GRILLE IN THIS LOCATION.
6 EXISTING RETURN GRILLE WILL NEED TO BE SHIFTED TO AVOID NEW
SOFFIT. CONTRACTOR SHALL MOVE GRILLED AND DUCT AS REQUIRED
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - MECHANICAL
0 6 12 18 ''''
NORTH
DATE INITIAL
M
MT
T
F
F
F
F
T
M
M
RL DN
RS DN
AHU-1
20x18 SA
VAV-9
RAF-1
24x24 RA
12x10 OA x R
A
24x24 RA
8 Ø SA
10x10 SA
24x24 RA
2" HWS
M102
STORAGE
FAN ROOM
WORKROOM
STAIR
RS
RL
20x18 SA
DSS-1A
FT-1
3/4" CD
RS/RL DN
RS/RL
3/4" CD
14x4 EX
T O
E
F
D
1 1/2"
P 44x22 RA UP
2" HWR
3/4" CD
CD UP
RS UP
RL UP
18x20 SA
24x24 RA
RS
RL
AHU-1
HOUSEKEEPING
PAD
2" HWS
2" HWR
3/4" CD
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
325415 /
80043
C U s e rs
\z b e n n e tt \D o c u m e n ts
\0
-M
E C
H R z b e n n e tt J T
T G
W .r v t
JEK
MLB
ARP
2/24/23
07310.034
M102
FLOOR PLAN - MECHANICAL
07310034- 5- M102 FLOOR PLAN - MECHANICAL
HVAC REPLACEMENT
JEWEL CAVE NATIONAL MONUMENT
CUSTER, SD
1 CONNECT NEW OA DUCT TO EXISTING OA OPENING AT WALL, MAKE
CONNECTION AIR TIGHT.
2 CONNECT NEW RETURN AIR DUCT TO EXISTING OPENING IN THE FLOOR.
3 CONNECT NEW SUPPLY AIR TO EXISTING OPENING IN THE FLOOR.
4 SIZE AND INSTALL REFRIGERANT PIPING PER MANUFACTURER'S
REQUIREMENTS AND THE SPECIFICATIONS. ALL PIPE PENETRATIONS
SHALL BE DONE VIA A CORE DRILL TO BE NEAT AND CLEAN.
5 CONTRACTOR HAS OPTION TO BRING AHU SECTION IN THROUGH HATCH
IN FLOOR FOR ELEVATOR EQUIPMENT ROOM. HATCH DIMENSIONS ARE
APPROXIMATELY 4'X6'.
6 PROVIDE DIFFERENTIAL PRESSURE SENSOR AS SHOWN FOR VARIABLE
SPEED PUMPING SYSTEM. PROVIDE 2-WAY CONTROL VALVE SIZED FOR
19 GPM TO MAINTAIN MINIMUM FLOW.
0 3 6 9 '''' NORTH
SCALE: 1/4" = 1'-0"
SECOND FLOOR PLAN - MECHANICAL
REF. NOTES ( ):X
SCALE: 3/4" = 1'-0"
AHU-1 SECTION
DATE INITIAL
F
BCU-1
RS DN
3/4" CD DN
ELEVATOR
MACHINE
ROOM
STAIR
22x8 SA
HOUSEKEEPING PAD
22x10 S-1
UH-1
44x20 RA
44x20 RA DN
RL DN
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
325415 /
80043
C U s e rs
\z b e n n e tt \D o c u m e n ts
\0
-M
E C
H R z b e n n e tt J T
T G
W .r v t
JEK
MLB
ARP
2/24/23
07310.034
M103
FLOOR PLAN - MECHANICAL
07310034- 5- M103 FLOOR PLAN - MECHANICAL
HVAC REPLACEMENT
JEWEL CAVE NATIONAL MONUMENT
CUSTER, SD
REF. DEMO NOTES ( ):X
1 SIZE AND INSTALL REFRIGERANT PIPING PER MANUFACTURER'S
REQUIREMENTS AND THE SPECIFICATIONS. ALL PIPE PENETRATIONS
SHALL BE DONE VIA A CORE DRILL TO BE NEAT AND CLEAN.
2 EXTEND FULL SIZE CONDENSATE DRAIN DOWN TO FLOOR BELOW AND
EXTEND TO OVER THE FLOOR DRAIN.
0 3 6 9 ''''
NORTH
SCALE: 1/4" = 1'-0"
THIRD FLOOR PLAN - MECHANICAL
DATE INITIAL
| 07310034-5-M 00 |
| 07310034-5-M 01 |
| 07310034-5-M 02 |
| 07310034-5-M 03 |
| 07310034-5-M 04 |
| 07310034-5-M 05 |
| 07310034-5-M000 |
| 07310034-5-M001 |
| 07310034-5-M002 |
| 07310034-5-M003 |
| 07310034-5-M100 |
| 07310034-5-M101 |
| 07310034-5-M102 |
| 07310034-5-M103 |
File details come from the government source that posted it. Updated .