B08_Solicitation_attach_2_Drawing_Spec_1_of_4.pdf

PDF 15 MB Posted

Attached to
JECA HVAC Replacement Federal contract opportunity
Solicitation number
140P6324B0003
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This file is an attachment to a solicitation for the JECA HVAC Replacement opportunity issued by the Department of the Interior National Park Service Midwest Region. The solicitation seeks proposals to replace the heating, ventilation, and air conditioning systems at various facilities. Offerors should provide pricing to remove existing HVAC equipment and install new high-efficiency systems, including all necessary ductwork, controls, and components. Proposals are due by April 15, 2023, with award expected by June 1, 2023. The period of performance is 365 days following award. This is a small business set-aside reserved for HUBZone, 8(a), women-owned, veteran-owned, or service-disabled veteran-owned small businesses.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCATION OF WORK

LOCATION OF WORK

PARKING AREA LOCATED

HERE TO BE USED

FOR CONTRACTOR

STAGING ONLY.

1044 North 115th Street | Suite 300

Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

325415 /

80043

C U s e rs

\z b e n n e tt \D o c u m e n ts

\0

-M

E C

H R z b e n n e tt J T

T G

W .r v t

JEK

MLB

ARP

2/24/23

07310.034

COVER SHEET

HVAC REPLACEMENT

JEWEL CAVE NATIONAL MONUMENT

CUSTER, SD

CONSTRUCTION DOCUMENTS

2/24/23

07310034- 0- 0 COVER SHEET

HVAC REPLACEMENT

JEWEL CAVE NATIONAL MONUMENT

CUSTER, SD

GENERAL

0 COVER SHEET

MECHANICAL

M 00 MECHANICAL INFO SHEET

M 01 SHEET SPECIFICATIONS - MECHANICAL

M 02 SHEET SPECIFICATIONS - MECHANICAL

M 03 SHEET SPECIFICATIONS - MECHANICAL

M 04 SHEET SPECIFICATIONS - MECHANICAL

M 05 SHEET SPECIFICATIONS - MECHANICAL

M000 DEMOLITION FLOOR PLAN - MECHANICAL

M001 DEMOLITION FLOOR PLAN - MECHANICAL

M002 DEMOLITION FLOOR PLAN - MECHANICAL

M003 DEMOLITION FLOOR PLAN - MECHANICAL

M100 FLOOR PLAN - MECHANICAL

M101 FLOOR PLAN - MECHANICAL

M102 FLOOR PLAN - MECHANICAL

M103 FLOOR PLAN - MECHANICAL

M401 DETAILS - MECHANICAL

M402 DETAILS - MECHANICAL

M501 SCHEDULE - MECHANICAL

M600 SEQUENCES

M601 SEQUENCES

M602 SEQUENCES

M603 SEQUENCES

ELECTRICAL

E 00 ELECTRICAL INFO SHEET

E 01 ELECTRICAL SPECIFICATIONS

E 02 ELECTRICAL SPECIFICATIONS

E 03 ELECTRICAL SPECIFICATIONS

E001 SUB-GRADE PLAN - DEMOLITION

E002 FIRST FLOOR PLAN - DEMOLITION

E003 SECOND FLOOR PLAN - DEMOLITION

E004 THIRD FLOOR PLAN - DEMOLITION

E101 SUB-GRADE PLAN - ELECTRICAL

E102 FIRST FLOOR PLAN - ELECTRICAL

E103 SECOND FLOOR PLAN - ELECTRICAL

E104 THIRD FLOOR PLAN - ELECTRICAL

E401 ELECTRICAL DETAILS

E501 POWER RISER DIAGRAM - DEMOLITION

E502 POWER RISER DIAGRAM

E601 ELECTRICAL SCHEDULES

DRAWING INDEX

NOT TO SCALE

Site Map

NOT TO SCALE

Region Map

TRUE

NORTH

TRUE

NORTH

DATE INITIAL

NOT TO SCALE

Site Map TRUE

NORTH

ARCHITECTURAL

A 00 ARCHITECTURAL INFO SHEET

A 01 ARCHITECTURAL SPECS

A001 DEMOLITION - CEILING PLANS

A002 DEMOLITION - CEILING PLANS, DETAILS

A101 SECOND AND THIRD FLOOR PLANS

A601 REFLECTED CEILING PLAN

A602 REFLECTED CEILING PLANS AND DETAILS

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

238608 / 80005

80005

C U s e rs \s w e h lin g

\D o c u m e n ts

\r e v it te m p \0

-A

R C

H

R s w e h lin g

.r v t

SMW

SMW

DJK

2/24/23

07310.034

A 00

ARCHITECTURAL INFO

SHEET

07310034- 2- A 00 ARCHITECTURAL INFO SHEET

HVAC REPLACEMENT

JEWEL CAVE NATIONAL MONUMENT

CUSTER, SD

XXXX

DX

XREFERENCE

NOTE

REFERENCE

DEMOLITION

NOTE

EQUIPMENT

NUMBER

ROOM NAME

150 SF

ROOM

NUMBER

REFERENCE

DESIGNATION

DEMOLITION

DESIGNATION

EQUIPMENT

NUMBER

ROOM NAME

DESIGNATION

ROOM NUMBER

DESIGNATION

ROOM AREA

DESIGNATION

SYMBOL LEGEND

ROOM /

FRAMING

ELEVATION

EXTERIOR

ELEVATION

XX-XX

XX-XX

ELEVATION LETTER

DIRECTION OF VIEW

SHEET NUMBER

ELEVATION LETTER

DIRECTION OF VIEW

SHEET NUMBER

DOOR

NUMBER

DOOR NUMBER10

WINDOW

DESIGNATION

WINDOW DESIGNATION000

TA-X

TOILET

ACCESSORY

TOILET ACCESSORY

NUMBER

WALL

TYPE

LETTER

INDICATES

PARTITION OR

WALL TYPE

X

ABBREVIATIONS

REFERENCE LEGEND

PLAN VIEW

SECTION / ELEVATION VIEW

SHEAR WALL

MASONRY-CMU

MASONRY-VENEER

STUD WALL

CONCRETE

GRAVEL

EARTH / COMPACTED

EARTH /

NONCOMPACTED

RIGID INSULATION

JOINT FILLER

STEEL

GYPSUM

FLEXIBLE INSULATION

GROUT

PLYWOOD

WOOD (FINISH)

MASONRY-CMU FACE

MASONRY-CMU

MASONRY-VENEER

S SOUTH

SA SUPPLY AIR

SAN SANITARY

SB SECURITY BARS

SB SPLASH BLOCK

SCH SCHEDULE

SCHED SCHEDULE

SCR SCREW

SCT STRUCTURAL CLAY TILE

SCUT SCUTTLE

SCW SOFT COLD WATER

SD STORM DRAIN

SD SUBDRAIN

SDI STEEL DECK INSTITUTE

SECT SECTION

SECY SECRETARY

SEQ SEQUENCE

SF SQUARE FOOT (FEET)

SFU STRUCTURAL FACING

UNIT

SHLD SHOULDER

SHT SHEET

SHTG SHEATHING

SHW SOFT HOT WATER

SIM SIMILAR

SJI STEEL JOIST INSTITUTE

SL SNOW LOAD

SLBB SHORT LEG BACK TO

BACK

SM SPRINKLER MAIN

SOV SHUT OFF VALVE

SPA SPACE(ING)

SPEC SPECIFICATIONS

SPF SOUNDPROOF

SPH SPACE HEATER

SPKR SPEAKER

SPL SPECIAL

SQ SQUARE

SS SANITARY SEWER

SS STAINLESS STEEL

SSMR STANDING SEAM METAL

ROOFING

STA STATION

STAIR STAIRWAY

STC SOUND TRANSMISSION

COEFFICIENT

STD STANDARD

STGR STRINGER

STIFF STIFFENER

STIRR STIRRUPS

STL STEEL

STN STONE

STOR STORAGE

STR STRUCTURAL

SUB FL SUB FLOOR

SUCT SUCTION

SUSP SUSPENDED

SVF SHEET VINYL FLOORING

SW SWITCH

SWBD SWITCH BOARD

SYM SYMMETRICAL

T TREAD

T or TLT TOILET

TAN TANGENT

TBD TACK BOARD

TE TOP ELEVATION

TEL TELEPHONE

TEMP TEMPERATURE

TER TERRAZZO

TERM TERMINAL

TGL TOGGLE

TH THRESHOLD

THK THICK

THRD THREAD

TO TOP OF

TOB TOP OF BEAM

TOC TOP OF CONCRETE

TOF TOP OF FOOTING

TOJ TOP OF JOIST

TOPO TOPOGRAPHIC

TOS TOP OF STEEL

TOW TOP OF WALL

TRANS TRANSVERSE

TSTAT THERMOSTAT

TV TELEVISION

TW TEMPERED WATER

TWR TEMPERED WATER

RETURN

TYP TYPICAL

UC UNIT COOLER

UG UNDERGROUND

UH UNIT HEATER

UL UNDERWRITERS

LABORATORIES

UNEX UNEXCAVATED

UNFIN UNFINISHED

UNO UNLESS NOTED

OTHERWISE

UPS UNINTERRUPTIBLE

POWER SYSTEM

UR URINAL

UT UTILITY

UV UNIT VENTILATOR

V VOLT

VAC VACUUM

VAV VARIABLE AIR VOLUME

VCP VITRIFIED CLAY PIPE

VCT VINYL COMPOSITION TILE

VD VAULT DOOR

VEL VELOCITY

VENT VENTILATOR(ION)

VERT VERTICAL

VEST VESTIBULE

VFD VARIABLE FREQUENCY

DRIVE

VOL VOLUME

VPC VERTICAL POINT OF

CURVATURE

VPI VERTICAL POINT OF

INTERSECTION

VPT VERTICAL POINT OF

TANGENCY

VS VENT STACK

VT VINYL-TILE

VTR VENT THRU ROOF

VWC VINYL WALL COVERING

W WEST

W WIDE (WIDTH)

W WIRE

W/ WITH

W/O WITHOUT

WB WET BULB

WC WATER CLOSET

WC WATER COLUMN

WD WASTE DRAIN

WD WOOD

WD BLKG WOOD BLOCKING

WD DR WOOD DOOR

WDW WINDOW

WF WIDE FLANGE

WG WIRE GLASS

WH WALL HYDRANT

WHT WHITE

WI WROUGHT IRON

WKSH WORK SHOP

WL WIND LOAD

WNSCT WAINSCOT

WP WEATHER PROOF

WP WORK POINT

WPF WATER PROOF

WPFG WATER PROOFING

WRB WARDROBE

WS WASTE STACK

WT WEIGHT

WWF WELDED WIRE FABRIC

WWM WOVEN WIRE MESH

XFMR TRANSFORMER

YD YARD or YARD DRAIN

P PAINT

PA PUBLIC ADDRESS

PBS PUSH BUTTON STATION

PC PIECE

PC POINT OF CURVATURE

PC PRECAST

PCC PORTLAND CEMENT

CONCRETE

PCT PORCELAIN CERAMIC TILE

PD PRESSURE DROP

PE POLYETHYLENE

PEN PENETRATION

PERF PERFORATED

PH PHASE

PHAR PHARMACY

PI POINT OF INTERSECTION

PIV POST INDICATING VALVE

PL or P PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLATF PLATFORM

PLBG PLUMBING

PLG PILING

PLWD PLYWOOD

PNL PANEL

POL POLISH(ED)

PORC PORCELAIN

PPM PARTS PER MILLION

PR PAIR

PREFAB PREFABRICATED

PREFIN PREFINISHED

PRESS PRESSURE

PROJ PROJECT

PRV PRESSURE REGULATING

VALVE

PS PRESSED STEEL

PSFT POUNDS PER SQUARE

FOOT

PSI POUNDS PER SQUARE

INCH

PT POINT

PT POINT OF TANGENCY

PTD PAINTED

PTN PARTITION

PVC POLYVINYL-CHLORIDE

PVMT PAVEMENT

PW PASS WINDOW

1/4 RD QUARTER ROUND

QT QUARRY TILE

QT QUART

QTRS QUARTERS

QTY QUANTITY

QTZ QUARTZ

R REGISTER

R RISER

RA RETURN AIR

RAD OR

R

RADIUS

RB RESILIENT BASE

RC REMOTE CONTROL

RCP REINFORCED CONCRETE

PIPE

RD ROOF DRAIN

RE RIGHT END

REC RECEIVER

RECP RECEPTACLE

RECR RECREATION

RECT RECTIFIER

REF REFERENCE

REFR REFRIGERANT

REFR REFRIGERATOR

REG REGISTER

REINF REINFORCEMENT

REM REMOVE(ABLE)

REQD REQUIRED

RESIL RESILIENT

REV REVISIONS

RFG ROOFING

RH RELATIVE HUMIDITY

RL REFRIGERANT LIQUID

RM ROOM

RND ROUND

RO ROUGH OPENING

RPM REVOLUTIONS PER

MINUTE

RT RUBBER TILE

RTU ROOF TOP UNIT

RUB RUBBER

DIAG DIAGONAL

DIM DIMENSION

DIP DUCTILE IRON PIPE

DISC DISCONNECT

DIST DISTRIBUTION

DL DEAD LOAD

DMPR DAMPER

DN DOWN

DP DAMP PROOFING

DPT DEW POINT

DR DOOR

DRN DRAIN

DS DOWN SPOUT

DV DENTAL VACUUM

DWG DRAWING

DWLS DOWELS

DX DIRECT EXPANSION

E EAST

EA EACH

EA EXHAUST AIR

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY

RATIO

EJ EXPANSION JOINT

EL OR

ELEV

ELEVATION - GRADE OR

BUILDING

ELEC ELECTRIC OR ELECTRICAL

ELEV ELEVATOR

ENCL ENCLOSURE

ENT ENTERING

ENT ENTRANCE

EQ EQUAL

EQUIP EQUIPMENT

ES EACH SIDE

EST ESTIMATE

EVAP EVAPORATOR

EW EACH WAY

EWC ELECTRIC WATER

COOLER

EXC EXCAVATE

EXD EXIT DEVICE

EXH EXHAUST

EXIST EXISTING

EXP EXPOSED

EXPL EXPLOSION

EXPN EXPANSION

EXT EXTERIOR

F FAHRENHEIT

F

FIRE

FA FRESH AIR

FCG FACING

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEB FIRE EXTINGUISHER

BRACKET

FEC FIRE EXTINGUISHER

CABINET

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FIG FIGURE

FIN FINISH

FIX FIXTURE

FL or FLR FLOOR

FLASH FLASHING

FLEX FLEXIBLE

FLG FLANGE

FLG FLOORING

FLUOR FLUORESCENT

FP FIRE PROTECTION

FPM FEET PER MINUTE

FPRF FIRE PROOF

FR FRAME

FRG FURRING

FS FAR SIDE

FS FLOOR SINK

FS FULL SIZE

FT FEET (FOOT)

FTG FOOTING

FV FIELD VERIFY

FWC FABRIC WALL COVERING

G GRILLE

G NATURAL GAS

GA GAGE OR GAUGE

GAL GALLON

GALV GALVANIZED

GEN GENERAL

GFE GOVERNMENT FURNISHED

EQUIPMENT

GFE/CI GOVERNMENT FURNISHED

EQUIPMENT/CONTRACTOR

INSTALLED

GFI GROUND FAULT

INTERRUPTER

GI GALVANIZED IRON

GL GLASS

GND GROUND

GOVT GOVERNMENT

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GR GRADE

GRS GALVANIZED RIGID STEEL

CONDUIT

GRTG GRATING

GSU GLAZED STRUCTURAL

UNITS

GWB GYPSUM WALLBOARD

GWT GLAZED WALL TILE

GYP GYPSUM

H or HT HEIGHT (HIGH)

HB HOSE BIBB

HBD HARDBOARD

HC HANDICAPPED

HD HEAD

HDPE HIGH DENSITY

POLYETHYLENE

HDR HEADER

HDW HARDWARE

HIP HIGH PRESSURE

HM HOLLOW METAL

HORIZ HORIZONTAL(LY)

HP HORSE POWER

HPS HIGH PRESURE STEAM

HPT HIGH POINT

HR HOUR

HS HIGH STRENGTH

HSGYP HIGH STRENGTH GYPSUM

PLASTER

HTG HEATING

HTR HEATER

HW HEAD WALL

HW HOT WATER

HWH HOT WATER HEATER

HWR HOT WATER RETURN

(HEATING)

HWS HOT WATER SUPPLY

(HEATING)

HYD HYDRAULIC

I or FE IRON

IC INTERCOM

ID INSIDE DIAMETER

IE INVERT ELEVATION

IES ILLUMINATING

ENGINEERING SOCIETY

IN INCH

INSUL INSULATION

INT INTERIOR

INV INVERT OR INVERTER

IP IRON PIPE

ISF INSIDE FACE

JB JUNCTION BOX

JBOX JUNCTION BOX

JC JANITOR CLOSET

JCT JUNCTION

JST JOIST

JT JOINT

K KEY

KCP KEENE'S CEMENT

PLASTER

KIP or K KILOPOUND (1000 LBS)

KIT KITCHEN

KL KEY LOCK

KP KICK PLATE

KV KILOVOLTS

KVA KILOVOLT AMPERES

KW KILOWATT

LAB LABORATORY

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

A COMPRESSED AIR

A/C AIR CONDITIONING

AB ANCHOR BOLT

ABS ACRYLONITRILE BUTAD

STYRENE

AC ALTERNATING CURRENT

ACI AMERICAN CONCRETE

INSTITUTE

ACSR ALUMINUM CONDUCTOR

STEEL REINFORCED

ACST ACOUSTIC

AD ACCESS DOOR

AD AREA DRAIN

ADMIN ADMIN ADMINISTRATION

(IVE)

AFF ABOVE FINISH FLOOR

AFFF AQUEOUS FILM FORMING

FOAM

AGG AGGREGATE

AHU AIR HANDLING UNIT

AI AREA INLET

AIC AMPS INTERRUPTING

CAPACITY (SYM RMS)

AISC AMERICAN INSTITUTE OF

STEEL CONSTRUCTION

AL ACTIVE LEAF

AL ALUMINUM

ALT ALTERNATE

AMP AMPERE

ANSI AMERICAN NATIONAL

STANDARDS INSTITUTE

AP ACCESS PANEL

APD AIR PRESSURE DROP

APPD APPROVED

APPROX APPROXIMATE

ARCH ARCHITECTURAL OR

ARCHITECT

ARI AMERICAN

REFRIGERATION

INSTITUTE

ASB ASBESTOS

ASPH ASPHALT

APC ACOUSTICAL PANEL

CEILING

AUTO AUTOMATIC

AV ACID VENT

AVG AVERAGE

AW ACID WASTE

AWC ACOUSTICAL WALL

COVERING

AWG AMERICAN WIRE GAUGE

L ANGLE

BATT BATT INSULATION

BB BULLETIN BOARD

BBO BOILER BLOW OFF

BC BOOKCASE

BD BOARD

BDY BOUNDARY

BEJ BRICK EXPANSION JOINT

BIT BITUMINOUS

BKR BREAKER

BL BUILDING LINE

BLDG BUILDING

BLK BLOCK

BLKG BLOCKING

BM BEAM

BM BENCH MARK

BO BOTTOM OF

BOT BOTTOM

BRCG BRACING

BRDG BRIDGING

BRG BEARING

BRK BRICK

BRKT BRACKET

BS BOTH SIDES

BTU BRITISH THERMAL UNIT

BTUH BTU PER HOUR

BUR BUILT-UP ROOFING

BW BOTH WAYS

C CENTER

C OR

CND

CONDUIT (ELECTRICAL

SHEETS)

C TO C CENTER TO CENTER

CAP CAPACITY

CB CATCH BASIN (OR CIRCUIT

BREAKER)

CC CENTER TO CENTER

CCT CIRCUIT

CD CONDENSATE DRAIN

CE COVER ELEVATION

CEM CEMENT

CF CUBIC FEET

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CHIM CHIMNEY

CI CAST IRON

CI CURB INLET

CIP CAST IN PLACE

CIR CIRCULAR

CJ CONTROL JOINT

CKT CIRCUIT

CL CENTER LINE

CL WG CLEAR WIRE GLASS

CLG CEILING

CLKG CAULKING

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY

UNIT

CNTR COUNTER

CO CLEAN OUT

CO2 CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION

COMB COMBUSTION

COMP COMPRESSIBLE

COMPR COMPRESSOR

CONC CONCRETE

CONF CONFERENCE

CONN CONNECTION

CONSTR CONSTRUCTION

CONSTR

JT

CONSTRUCTION JOINT

CONT CONTINUOUS

(CONTINUATION)

CONTR CONTRACTOR

COR CORNER

CORR

COVEREDCOV

CORRIDOR

CPL CEMENT PLASTER

CPS CYCLES PER SECOND

(HERTZ)

CPT CARPET

CR CONDENSER WATER

RETURN

CRES CORROSIVE RESISTANT

STEEL

CRG CARRIAGE

CRSE COURSE

CS CONDENSER WATER

SUPPLY

CS COUNTER SINK

CSMT CASEMENT

CT CERAMIC TILE

CT CURRENT TRANSFORMER

CTL CARPET TILE

CU CONDENSING UNIT

CU YD CUBIC YARDS

CUH CABINET UNIT HEATER

CV CEILING VENT

CW COLD WATER

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

CYL CYLINDER

D DEPTH (DEEP)

D DIFFUSER

d PENNY (as in nail - 10d)

D&M DRESSED AND MATCHED

DA DOUBLE ACTING

DB DRY BULB

dB DECIBEL

DBL DOUBLE

DC DIRECT CURRENT

DCJ DOWELED CONTROL

JOINT

DCJT DUMMY CONTROL JOINT

DCL DOOR CLOSER

DCW DOMESTIC COLD WATER

DEG DEGREE

DEMO DEMOLITION

DEPR DEPRESSION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DH DOUBLE HUNG

DHW DOMESTIC HOT WATER

DI DEIONIZED WATER

DIA DIAMETER

CLO CLOSET

FR FIRE RATED

U/C UNDER CABINET

CBU CEMENTITIOUS BACKER

UNIT

F FLUSH or FRAME

FG FULL GLASS

G GLASS or GLASS TYPE

HG HALF GLASS

V VISION

SL SLIDING

BF(2) BIFOLD (DOUBLE)

IG INSULATED GLASS

SS SOLID SURFACE

WIDTH DEPTH

HEIGHT

CABINET DESIGN

SERIES MODELCASEWORK

TAG

DWR DRAWER

CAB CABINET

SHV SHELF OR SHELVES

SNGL SINGLE

GENERAL NOTES

LBS POUNDS

LD LOAD

LDG LOADING

LE LEFT END

LG LENGTH (LONG)

LIN LINEAR

LIS LAWN IRRIGATION

SYSTEM

LL LIVE LOAD

LLBB LONG LEG BACK TO BACK

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LNTL LINTEL

LP LOW POINT

LPG LIQUIFIED PETROLEUM

GAS

LPS LOW PRESSURE STEAM

LR LIVING ROOM

LS LAWN SPRINKLER

LT LIGHT

LT WT LIGHT WEIGHT

LTG LIGHTING

LVT LUXURY VINYL TILE

M MIDDLE

M THOUSAND

M & B MATCHED AND BEADED

MA MAKE-UP AIR

MACH MACHINE

MAS MASONRY

MAT or

MATL

MATERIAL

MAX MAXIMUM

MB MACHINE BOLT

MBH 1000 BTUH

MC MEDICINE CABINET

MC MISCELLANEOUS

CHANNELS

MECH MECHANICAL

MER MECHANICAL EQUIPMENT

ROOM

MET METAL

MFG MANUFACTURING

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

ML METAL LATH

MLDG MOULDING

MO MASONRY OPENING

MONO MONOLITHIC

MT METAL THRESHOLD

MTD MOUNTED

N NORTH

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL

CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS

ASSOCIATION

NFPA NATIONAL FIRE

PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NO NUMBER

NR NOT REQUIRED

NS NEAR SIDE

NTS NOT TO SCALE

OA OUTSIDE AIR

OB WG OBSCURE WIRE GLASS

OBGL OBSCURE GLASS

OBSC OBSCURE

OC ON CENTER(S)

OCEW ON CENTER EACH WAY

OD OUTSIDE DIAMETER

OFF OFFICE

OH OVERHEAD

OPNG OPENING

OPP OPPOSITE

OPS OPERATIONS

OS & Y OUTSIDE SCREW & YOKE

OSF OUTSIDE FACE

OV OVERFLOW VALVE

OX OXYGEN

OZ OUNCE

NV NARROW VISION

MICRO MICROWAVE

NORTH

ARROW

NAME

ELEVATION

LEVEL

MATCHLINE

AREA A

AREA B

TITLE

MARKER

VIEW NAME

SCALE: 1/8" = 1'-0"

EXISTING

COLUMN

NEW

COLUMN

X

X

X

XX-XX

SIM

X

XX-XX

SECTION/

DETAIL

PLAN

DETAIL

LETTER INDICATES

NEW COLUMN LINE

LETTER INDICATES

EXISTING COLUMN LINE

SECTION/DETAIL

NUMBER

SHEET NUMBER

INDICATES DIRECTION

OF VIEW

DETAIL NUMBER

SHEET NUMBER

DETAIL NUMBER

LEVEL CALLOUT

DESIGNATION

ELEVATION

DESIGNATION

GRAPHIC AREA FOR

DRAWING

TITLE

SCALE OF THE

DRAWING

NORTH PLAN

NORTH

TRUE

NORTH

GENERAL DEMO NOTES

ARCHITECTURAL SHEET LIST

X

PROJECT ARCHITECTURAL REFERENCED NOTES

REF. NOTES ( )

REF. DEMO NOTES ( )

PROJECT ARCHITECTURAL REFERENCED DEMOLITION NOTES

DX

A 00 ARCHITECTURAL INFO SHEET

A 01 ARCHITECTURAL SPECS

A001 DEMOLITION - CEILING PLANS

A002 DEMOLITION - CEILING PLANS, DETAILS

A101 SECOND AND THIRD FLOOR PLANS

A601 REFLECTED CEILING PLAN

A602 REFLECTED CEILING PLANS AND DETAILS

A. THE DEMOLITION PLANS WERE PRODUCED BY DUPLICATING THE ORIGINAL DRAWINGS PROVIDED BY

THE OWNER AND LIMITED FIELD VERIFICATION. DIMENSIONS AND EXISTING CONDITIONS ARE

APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS. ITEMS WHICH ARE

INTENDED TO BE REMOVED, RELOCATED, OR SALVAGED ARE SHOWN AS FULL-TONE DASHED LINES AND ARE LISTED IN THE REFERENCED DEMOLITION NOTES. ALL OTHER ITEMS ARE INTENDED TO

REMAIN IN PLACE AND ARE SHOWN HALF-TONE.

B. DEMOLITION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS BELOW OR HERE-IN. THE CONTRACTOR SHALL COORDINATE ALL REQUIRED RENOVATION AND NEW CONSTRUCTION WITH THE EXISTING BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE DEMOLITION REQUIRED AND AS LISTED

BELOW.

C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL EXISTING BUILDING COMPONENTS, MATERIALS, EQUIPMENT, AND APPURTENANCES AS REQUIRED TO BUILD, ERECT, INSTALL, OR ACCOMMODATE ALL NEW CONSTRUCTION WITH THE OWNER HAVING FIRST RIGHT

OF REFUSAL ON ALL ITEMS.

D. ITEMS NOTED TO BE REMOVED AND SALVAGED OR REINSTALLED SHALL BE CAREFULLY REMOVED BY

THE CONTRACTOR WITHOUT DAMAGE AND STORED OR REINSTALLED ON THE SITE AS DIRECTED.

REMOVED AND SALVAGED ITEMS SHALL REMAIN THE PROPERTY OF THE OWNER.

E. WHERE EXISTING FLOOR MATERIALS AND/OR WALLS ARE TO BE REMOVED, PREP REMAINING FLOOR

AND/OR WALL SUBSTRATE AS REQUIRED PER MANUFACTURERS RECOMMENDATIONS FOR THE NEW

FLOOR/WALL FINISH MATERIAL. REMOVE ALL FINISH FLOORING DOWN TO BASE SUBSTRATE FLOORING

AND PREP TO RECEIVE NEW FINISH.

F. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL REASONABLY BELIEVED TO BE

ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN

RENDERED HARMLESS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AREA AFFECTED

AND REPORT THE CONDITION TO THE OWNER AND ARCHITECT IN WRITING. THE WORK IN THE

AFFECTED AREA SHALL NOT THEREAFTER BE RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE

OWNER AND CONTRACTOR.

G. THE CONTRACTOR IS RESPONSIBLE FOR THE ERECTION, MAINTENANCE, AND REMOVAL OF ALL

CONSTRUCTION BARRIERS.

H. REMOVE EXISTING ELEMENTS/FINISHES NOT REQUIRED IN THE COMPLETED PROJECT, BUT

CONFLICTING WITH NEW FINISHES. THESE ELEMENTS/FINISHES SHALL INCLUDE, BUT ARE NOT LIMITED

TO THE ITEMS LISTED BELOW:

1. REMOVE EXISTING CEILING SUSPENSION SYSTEMS ANYWHERE NEW CEILINGS ARE INDICATED PER

THE REFLECTED CEILING PLAN AND ROOM FINISH SCHEDULE

I. ALL EXISTING WALLS, DOORS, FRAMES, AND WINDOWS SHOWN ON THE PLAN AS A FULL-TONE DASHED

LINE ARE TO BE REMOVED.

J. REFER TO MECHANICAL DEMOLITION PLANS FOR ADDITIONAL DEMOLITION REQUIRED TO

ACCOMMODATE NEW MECHANICAL PIPING AND ASSOCIATED EQUIPMENT.

A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY THE OWNER AND LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AND NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM THOSE SHOWN

ON THE DRAWINGS. THE CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS AT NO

ADDITIONAL EXPENSE TO THE OWNER.

B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE

TO REVIEW ENTIRE SET OF DOCUMENTS.

C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND BE RESPONSIBLE FOR SAME.

CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO OWNER.

COORDINATE THE WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED.

D. SCREENED HALF-TONE LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. FULL-TONE LINES

INDICATE NEW OR RELOCATED CONSTRUCTION.

E. DIMENSIONS ARE TYPICALLY TO FINISH FACE OF GYPSUM WALL BOARD; OR CENTER LINE OF COLUMN

OR BEAMS, UNLESS NOTED OTHERWISE.

F. ALL ANGLES ON THE FLOOR PLANS ARE 45 OR 90 DEGREES UNLESS OTHERWISE INDICATED.

G. ALL CONTROL JOINTS (CJ) SHALL BE CAULKED AT EXTERIOR WALL LOCATIONS AND RAKED BACK 3/4

INCH AT ALL INTERIOR JOINTS UNLESS OTHERWISE NOTED.

H. PATCH EXISTING WALLS, FLOORS, AND CEILING SURFACES DEMOLISHED, CUT, CORED, OR ALTERED IN

ANY WAY TO ACCOMMODATE NEW CONSTRUCTION OR TO RECEIVE NEW FINISHES. PREP ALL

EXISTING FLOORS TO RECEIVE NEW FINISHES PER ROOM FINISH SCHEDULE.

I. PATCH ALL CONCRETE SLAB LOCATIONS DEMOLISHED TO INSTALL NEW STRUCTURAL, MECHANICAL, OR ELECTRICAL WORK.

1 GWB CEILING - FIELD VERIFY THICKNESS TO MATCH EXISTING,

BLOWN IN ATTIC INSULATION (R-49 MIN) AND 6 MIL VAPOR

BARRIER WHERE OCCURS, COORDINATE EXTENTS WITH

MECH. VERIFY CEILING HEIGHTS TO MATCH EXISTING.

2 ACOUSTICAL CEILING TILES ADHERED TO GWB FIELD VERIFY

THICKNESS TO MATCH EXISTING WITH BLOWN IN ATTIC

INSULATION (R-49 MIN) ABOVE AND 6 MIL VAPOR BARRIER

WHERE OCCURS TO MATCH EXISTING, COORDINATE EXTENTS

WITH MECH. VERIFY CEILING HEIGHTS TO MATCH EXISTING.

3 PATCH WALL AT ABANDONED MECHANICAL VENT TO MATCH

EXISTING FINISH.

4 PATCH GWB AS REQUIRED WITH REPLACEMENT OF ACOUSTIC

CEILING.

5 PATCH WALL AS REQUIRED TO MATCH EXISTING FOR NEW

MECHANICAL OUTSIDE AIR DUCT, COORDINATE EXTENTS WITH

MECHANICAL.

6 CEILING ACCESS HATCH, 12 X 12, INSULATED, FIRE RATED

ACCESS PANEL, BABCOCK-DAVIS (OR EQUAL) B-IW SERIES

7 PATCH EXTERIOR WALL FOR NEW PIPE. COORDINATE

EXTENTS WITH MECH.

8 PROTECT CAVE REPLICA COMPONENTS WHERE OCCURS

DURING REMOVAL OF EXISTING CEILING. PATCH ANY

DAMAGED AREA DURING CONSTRUCTION.

9 MECH EQUIPMENT - SEE MECH

10 5/8" TYPE 'X' GWB CEILING ON 2X STUDS, COORDINATE

EXTENTS WITH MECH.

11 PATCH WALL TO WITH STUDS, GWB WITH PAINT FINISH TO

MATCH EXISTING AS REQUIRED FOR NEW MECHANICAL PIPES,

COORDINATE EXTENTS WITH MECHANICAL.

12 GWB CEILING - FIELD VERIFY THICKNESS TO MATCH EXISTING.

COORDINATE EXTENTS WITH MECH. VERIFY CEILING HEIGHTS

TO MATCH EXISTING.

13 AT AREA OF REMOVED FLUE THROUGH ROOF, PATCH

ROOFING TO MATCH EXISTING AND BE WEATHERTIGHT.

ROOFING TO BE 60 MIL S327-15 "TAN" RHINOBOND TO

WITHSTAND 60 MPH WINDS. COORDINATE LOCATION WITH

MECHANICAL.

D1 REMOVE EXISTING ACOUSTIC CEILING TILE, GWB BACKING

AND ATTIC INSULATION, COORDINATE EXTENTS WITH

MECHANICAL. ASSUME ATTIC INSULATION CONTAINMENT.

D2 REMOVE EXISTING GWB CEILING AND ATTIC INSULATION,

COORDINATE EXTENTS WITH MECHANICAL. ASSUME ATTIC

INSULATION CONTAINMENT.

D3 REMOVE EXISTING WALL AS REQUIRED FOR NEW MECHANICAL

PIPES. COORDINATE EXTENTS WITH MECHANICAL.

D4 REMOVE EXISTING GWB CEILING FOR NEW MECHANICAL

EQUIPMENT, COORDINATE EXTENTS WITH MECHANICAL.

D5 REMOVE EXISTING WALL FOR MECHANICAL OUTSIDE AIR

DUCT. COORDINATE EXTENTS WITH MECHANICAL.

DATE INITIAL

CODE SUMMARY

APPLICABLE CODES

BUILDING :

ACCESSIBILITY :

LIFE SAFETY :

ENERGY :

MECHANICAL :

PLUMBING :

ELECTRICAL :

OCCUPANCY GROUP :

TYPE OF CONSTRUCTION :

MAXIMUM ALLOWED HEIGHT

MAXIMUM ALLOWED AREA

MIXED USE SEPARATIONS :

HEIGHT AND AREA LIMITS

EXTERIOR WALL OPENING LIMITS :

DRAFTSTOPS :

FIRE PROTECTIVE SYSTEMS

FIRE SEPARATION ASSEMBLIES

EXITS

SHAFTS / HOISTWAYS

DWELLING UNIT SEPARATIONS

INTERIOR LOAD BEARING

WALLS, COLUMNS, FRAMING

ROOF CONSTRUCTION

FLOOR CONSTRUCTION

FIRE WALLS

FIRE RESISTANCE OF STRUCTURAL

ELEMENTS

RATING

(HOURS)

DESIGN

NUMBER

EXTERIOR WALLS

LOAD BEARING WALLS

NON-LOAD BEARING WALLS

CALCULATIONS

DOOR

STAIR

M/B

III-B

55'

65,625 SF

2010 ADA

NA

2021 NFPA 101

2015 IECC

2015 IMC

2009 UPC

2020 NEC

2018 IBC

UL

UL

UL

UL

UL

UL

UL

UL

UL

0.2" / OCC

0.3" / OCC

SECTION 092900 - GYPSUM BOARD

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Interior gypsum board.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Fire-Resistance-Rated Assemblies: For fire-resistance-rated assemblies, provide materials and construction identical to those tested in UL assembly indicated in Drawings.

2.2 INTERIOR GYPSUM BOARD

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. American Gypsum.

2. Georgia-Pacific Gypsum LLC.

3. National Gypsum Company.

4. USG Corporation.

B. Gypsum Board, Type X: ASTM C 1396/C 1396M.

1. Thickness: 5/8 inch.

2. Long Edges: Tapered.

3. All fire rated assemblies and as noted.

C. Gypsum Ceiling Board: ASTM C 1396/C 1396M.

1. Thickness: 5/8 inch, Type X.

2. Long Edges: Tapered.

3. All ceilings.

2.3 TRIM ACCESSORIES

A. Interior Trim: ASTM C 1047.

1. Material: Paper-faced galvanized steel sheet or plastic.

2. Shapes:

a. L-Bead: L-shaped; exposed long flange receives joint compound.

b. Expansion (control) joint.

2.4 JOINT TREATMENT MATERIALS

A. General: Comply with ASTM C 475/C 475M.

B. Joint Tape:

1. Interior Gypsum Board: Paper.

2. Glass-Mat Gypsum Sheathing Board: 10-by-10 glass mesh.

C. Joint Compound for Interior Gypsum Board: For each coat use formulation that is compatible with other compounds applied on previous or for successive coats.

1. Prefilling: At open joints and damaged surface areas, use setting-type taping compound.

2. Embedding and First Coat: For embedding tape and first coat on joints, fasteners, and trim flanges, use drying-type, all-purpose compound.

3. Fill Coat: For second coat, use drying-type, all-purpose compound.

4. Finish Coat: For third coat, use setting-type, sandable topping compound.

2.5 AUXILIARY MATERIALS

A. Steel Drill Screws: ASTM C 1002, unless otherwise indicated.

B. Sound Attenuation Blankets: ASTM C 665, Type I (blankets without membrane facing).

PART 3 - EXECUTION

3.1 APPLYING AND FINISHING PANELS

A. Comply with ASTM C 840.

B. Install ceiling panels across framing to minimize the number of abutting end joints and to avoid abutting end joints in central area of each ceiling. Stagger abutting end joints of adjacent panels not less than one framing member.

C. Do not place tapered edges against cut edges or ends.

D. Examine panels before installation. Reject panels that are wet or damaged.

E. Install trim with back flanges intended for fasteners, attach to framing with same fasteners used for panels.

Otherwise, attach trim according to manufacturer's written instructions.

1. Edge Trim: Install at perimeter edge of gypsum board where it meets masonry walls.

2. Control Joints: Install control joints at locations indicated on Drawings.

F. Form control joints, with double joists spaced (1/2 inch) apart.

G. Prefill open joints and damaged surface areas.

H. Apply joint tape over gypsum board joints, except for trim products specifically indicated as not intended to receive tape.

I. Gypsum Board Finish Levels: Finish panels to levels indicated below and according to ASTM C 840:

1. Level 4: At all exposed interior ceiling surfaces.

2. Level 4: At all interior wall surfaces.

3. Level 3: At all interior ceiling surfaces with ACT as a finish material adhered to GWB.

J. Protect adjacent surfaces from drywall compound and finishes and promptly remove from non-drywall surfaces.

Repair surfaces stained, marred, or otherwise damaged during drywall application.

K. Remove and replace panels that are wet or damaged.

END OF SECTION

SECTION 095113 - ACOUSTICAL PANEL CEILINGS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes acoustical panels and exposed suspension systems for interior ceilings.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Samples: For each exposed product and for each color and texture specified.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Seismic Performance: Suspended ceilings shall withstand the effects of earthquake motions determined according to ASCE/SEI 7.

B. Surface-Burning Characteristics: Comply with ASTM E 84; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.

1. Flame-Spread Index: Class A according to ASTM E 1264.

2. Smoke-Developed Index: 50 or less.

2.2 ACOUSTICAL PANELS

A. Match existing acoustical panels.

PART 3 - EXECUTION

3.1 PREPARATION

A. Measure each ceiling area and establish layout of acoustical panels to balance border widths at opposite edges of each ceiling. Avoid using less-than-half-width panels at borders unless otherwise indicated.

B. Layout openings for penetrations centered on the penetrating items.

3.2 INSTALLATION

A. Install acoustical panel ceilings according to ASTM C 636/C 636M and manufacturer's written instructions.

B. Install edge moldings and trim of type indicated at perimeter of acoustical ceiling area and where necessary to conceal edges of acoustical panels.

1. Do not use exposed fasteners, including pop rivets, on moldings and trim.

C. adhere act to gwb to match adjacent profile.

END OF SECTION

SECTION 099123 - INTERIOR PAINTING

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes surface preparation and the application of paint systems on interior substrates.

1. Gypsum Board

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product. Include preparation requirements and application instructions.

B. Samples: For each type of paint system and in each color and gloss of topcoat.

1.3 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Paint: 5 percent, but not less than 3.8 L (1 gal.) of each material and color applied.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Benjamin Moore & Co.

2. Diamond Vogel Paints.

3. ICI Paints.

4. Kelly-Moore Paints.

5. Kwal Paint.

6. PPG Architectural Finishes, Inc.

7. Pratt & Lambert.

8. Royal Paints.

9. Sherwin-Williams Company (The).

2.2 PAINT, GENERAL

A. Material Compatibility:

1. Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.

2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.

B. Colors: As selected by COR from Manufacturer’s full range of color options.

2.3 PRIMERS/SEALERS

A. Primer Sealer, Latex, Interior: MPI #50.

1. See Painting Schedule at the end of this Section.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.

B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:

1. Concrete: 12 percent.

2. Masonry (Clay and CMU): 12 percent.

3. Wood: 15 percent.

4. Gypsum Board: 12 percent.

C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.

D. Proceed with coating application only after unsatisfactory conditions have been corrected.

1. Application of coating indicates acceptance of surfaces and conditions.

3.2 PREPARATION

A. Comply with manufacturer's written instructions and recommendations in "MPI Manual" applicable to substrates indicated.

B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted.

If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.

1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection if any.

C. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and incompatible paints and encapsulants.

1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce paint systems indicated.

3.3 APPLICATION

A. Apply paints according to manufacturer's written instructions and to recommendations in "MPI Manual."

B. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.

3.4 CLEANING AND PROTECTION

A. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and leave in an undamaged condition.

B. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.

3.5 INTERIOR PAINTING SCHEDULE

A. Gypsum Board Substrates:

1. Institutional Low-Odor/VOC Latex System:

a. Prime Coat: Primer sealer, interior, institutional low odor/VOC, MPI #149.

b. Intermediate Coat: Latex, interior, institutional low odor/VOC, matching topcoat.

c. Topcoat: Latex, interior, institutional low odor/VOC, MPI #144, for ceilings

d. Topcoat: Latex, interior, institutional low odor/VOC, MPI #146, all surfaces other than ceilings

END OF SECTION

SECTION 072100 - THERMAL INSULATION

PART 1 - GERNERAL

1.1 SUMMARY

A. Section Includes:

1. Glass-fiber blanket.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

PART 2 - PRODUCTS

2.1 GLASS-FIBER BLANKET

A. Glass-Fiber Blanket, Unfaced: ASTM C 665, Type I; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively, per ASTM E 84; passing ASTM E 136 for combustion characteristics.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. CertainTeed Corporation.

b. Johns Manville; a Berkshire Hathaway company.

c. Knauf Insulation.

d. Owens Corning.

2.2 ACCESSORIES

A. Insulation for Miscellaneous Voids:

1. Glass-Fiber Insulation: ASTM C 764, Type II, loose fill; with maximum flame-spread and smoke-developed indexes of 5, per ASTM E 84.

B. Insulation Anchors, Spindles, and Standoffs: As recommended by manufacturer.

C. Adhesive for Bonding Insulation: Product compatible with insulation and air and water barrier materials, and with demonstrated capability to bond insulation securely to substrates without damaging insulation and substrates.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Comply with insulation manufacturer's written instructions applicable to products and applications.

B. Extend insulation to envelop entire area to be insulated. Fit tightly around obstructions and fill voids with insulation.

Remove projections that interfere with placement.

3.2 INSTALLATION OF INSULATION IN FRAMED CONSTRUCTION

A. Blanket Insulation: Install in cavities formed by framing members according to the following requirements:

1. Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill the cavities, provide lengths that will produce a snug fit between ends.

2. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.

3. Maintain 3-inch clearance of insulation around recessed lighting fixtures not rated for or protected from contact with insulation.

4. Vapor-Retarder-Faced Blankets: Tape joints and ruptures in vapor-retarder facings, and seal each continuous area of insulation to ensure airtight installation.

a. Exterior Walls: Set units with facing placed toward interior of construction.

B. Miscellaneous Voids: Install insulation in miscellaneous voids and cavity spaces where required to prevent gaps in insulation using the following materials:

1. Glass-Fiber Insulation: Compact to approximately 40 percent of normal maximum volume equaling a density of approximately 2.5 lb/cu. ft.

END OF SECTION

SECTION 024119 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Demolition and removal of selected portions of building or structure.

2. Demolition and removal of selected site elements.

3. Salvage of existing items to be reused or recycled.

1.2 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

1.3 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site.

1.4 INFORMATIONAL SUBMITTALS

A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.

B. Schedule of selective demolition activities with starting and ending dates for each activity.

C. Predemolition photographs or video.

1.5 CLOSEOUT SUBMITTALS

A. Inventory of items that have been removed and salvaged.

1.6 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

1. If suspected hazardous materials are encountered, do not disturb; immediately notify Architect and Owner.

Hazardous materials will be removed by Owner under a separate contract.

E. Storage or sale of removed items or materials on-site is not permitted.

F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

G. Arrange selective demolition schedule so as not to interfere with Owner's operations.

1.7 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition.

Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ASSE A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.

C. Inventory and record the condition of items to be removed and salvaged.

3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. Arrange to shut off utilities with utility companies.

2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

3. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.

a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.

c. Equipment to Be Removed: Disconnect and cap services and remove equipment.

d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.

e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.

f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.

g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.

3.3 PROTECTION

A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

C. Remove temporary barricades and protections where hazards no longer exist.

3.4 SELECTIVE DEMOLITION

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations.

Maintain portable fire-suppression devices during flame-cutting operations.

4. Maintain fire watch during and after flame-cutting operations per Owner’s Safety Requirements.

5. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

6. Dispose of demolished items and materials promptly.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

C. Removed and Salvaged Items:

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers.

3. Store items in a secure area until delivery to Owner.

4. Transport items to Owner's storage area on-site.

5. Protect items from damage during transport and storage.

D. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and reinstalled in their original locations after selective demolition operations are complete.

3.5 CLEANING

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Burning: Do not burn demolished materials.

C. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations.

Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION

SECTION 083100 - ACCESS DOORS AND PANELS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Ceiling-mounted access units.

1.2 SUBMITTALS

A. Product Data: Provide sizes, types, finishes, hardware, scheduled locations, and details of adjoining work.

PART 2 - PRODUCTS

2.1 ACCESS DOORS AND PANELS ASSEMBLIES

A. Ceiling-Mounted Units:

1. Location: As indicated on drawings.

2. Size: 12 by 12 inches.

3. Door/Panel: Hinged, standard duty, with tool-operated spring or cam lock and no handle.

2.2 CEILING-MOUNTED ACCESS UNITS

A. Manufacturers:

1. Activar Construction Products Group, Inc. - JL Industries: www.activarcpg.com/#sle.

a. Insulated Fire-Rated Access Panel: Activar/JL Industries FD.

2. Babcock-Davis; B-IW Series -insulated, fire rated: www.babcockdavis.com/#sle.

B. Ceiling-Mounted Units: Factory-fabricated door and frame, fully assembled units with corner joints welded, filled and ground flush; square and without rack or warp; coordinate requirements with type of installation assembly being used for each unit.

1. Material: Steel.

2. Style: Recessed door panel for infill with wall/ceiling finish.

a. Gypsum Board Mounting Criteria: Use drywall bead type frame.

3. Door Style: Single thickness with rolled or turned in edges.

4. Frames: 16-gauge, 0.0598-inch minimum thickness.

5. Single Steel Sheet Door Panels: 20-gauge.

6. Insulation: Non-combustible mineral wool or glass fiber.

7. Primed and Factory Finish: Polyester powder coat; color White.

8. Hardware:

a. Hinges for Non-Fire-Rated Units: Concealed, constant force closure spring type.

b. Latch/Lock: Tamperproof tool-operated cam latch.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that rough openings are correctly sized and located.

B. Begin installation only after substrates have been properly prepared, and if the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.

3.2 INSTALLATION

A. Install units in accordance with manufacturer's instructions.

B. Install frames plumb and level in openings, and secure units rigidly in place.

END OF SECTION

1044 North 115th Street | Suite 300

Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

238608 / 80005

80005

C U s e rs \s w e h lin g

\D o c u m e n ts

\r e v it te m p \0

-A

R C

H

R s w e h lin g

.r v t

SMW

SMW

DJK

2/24/23

07310.034

A 01

ARCHITECTURAL SPECS

07310034- 2- A 01 ARCHITECTURAL SPECS

HVAC REPLACEMENT

JEWEL CAVE NATIONAL MONUMENT

CUSTER, SD

SECTION 06 10 00 - ROUGH CARPENTRY

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Nonstructural dimension lumber framing.

B. Sheathing.

C. Concealed wood blocking, nailers, and supports.

1.02 DELIVERY, STORAGE, AND HANDLING

A. General: Cover wood products to protect against moisture. Support stacked products to prevent deformation and to allow air circulation.

PART 2 PRODUCTS

2.01 GENERAL REQUIREMENTS

A. Dimension Lumber: Comply with PS 20 and requirements of specified grading agencies.

1. Species: Douglas Fir, unless otherwise indicated.

2. Lumber of other species or grades is acceptable provided structural and appearance characteristics are equivalent to or better than products specified.

2.02 DIMENSION LUMBER FOR CONCEALED APPLICATIONS

A. Sizes: Nominal sizes as indicated on drawings, S4S.

B. Moisture Content: S-dry or MC19.

C. Stud Framing (2 by 2 through 2 by 6 ):

1. Species: Allowed under referenced grading rules.

2. Grade: No. 2.

D. Miscellaneous Framing, Blocking, Nailers, Grounds, and Furring:

1. Lumber: S4S, No. 2 or Standard Grade.

2. Boards: Standard or No. 3.

2.03 ACCESSORIES

A. Fasteners and Anchors:

1. Metal and Finish: Hot-dipped galvanized steel complying with ASTM A153/A153M for high humidity and preservative-treated wood locations, unfinished steel elsewhere.

2.04 FACTORY WOOD TREATMENT

A. Treated Lumber and Plywood: Comply with requirements of AWPA U1 - Use Category System for wood treatments determined by use categories, expected service conditions, and specific applications.

1. Preservative-Treated Wood: Provide lumber and plywood marked or stamped by an ALSC-accredited testing agency, certifying level and type of treatment in accordance with AWPA standards.

PART 3 EXECUTION

3.01 PREPARATION

A. Coordinate installation of rough carpentry members specified in other sections.

3.02 INSTALLATION - GENERAL

A. Select material sizes to minimize waste.

B. Reuse scrap to the greatest extent possible; clearly separate scrap for use on site as accessory components, including: shims, bracing, and blocking.

C. Where treated wood is used on interior, provide temporary ventilation during and immediately after installation sufficient to remove indoor air contaminants.

3.03 BLOCKING, NAILERS, AND SUPPORTS

A. Provide framing and blocking members as indicated or as required to support finishes, fixtures, specialty items, and trim.

B. In framed assemblies that have concealed spaces, provide solid wood fireblocking as required by applicable local code, to close concealed draft openings between floors and between top story and roof/attic space; other material acceptable to code authorities may be used in lieu of solid wood blocking.

C. In walls, provide blocking attached to studs as backing and support for wall-mounted items, unless item can be securely fastened to two or more studs or other method of support is explicitly indicated.

3.04 CLEANING

A. Do not leave wood, shavings, sawdust, etc. on the ground or buried in fill.

B. Prevent sawdust and wood shavings from entering the storm drainage system.

END OF SECTION 06 10 00

DATE INITIAL

S S

SS

S

S

S

S

H

S

H

H

SECRETARY

STORAGE

OFFICE

OFFICE

OFFICE

OFFICE

WOMENS

MENS

VESTIBULE

MECH

WORKROOM

EXHIBIT ROOM

LOBBY

CORRIDOR

ELEVATOR

LOBBY

CORRIDOR

LOBBY EXHIBIT

PARK STORE

HALL

COURTYARD

CORRIDOR

117A

CORRIDOR

VESTIBULE

STAIR

GUIDES

ELEVATOR

HOISTWAY

D2 D2

D1

D1

D1

D1

D1

D1

D1

D3

STAIR

ENTRY

OFFICE

RESTROOM

STORAGE

MECH

ELEV

ELEV

D1

D2

D1

D5

1044 North 115th Street | Suite 300

Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

238608 / 80005

80005

C U s e rs \s w e h lin g

\D o c u m e n ts

\r e v it te m p \0

-A

R C

H

R s w e h lin g

.r v t

SMW

SMW

DJK

2/24/23

07310.034

A001

DEMOLITION - CEILING

PLANS

07310034- 2- A001 DEMOLITION - CEILING PLANS

HVAC REPLACEMENT

JEWEL CAVE NATIONAL MONUMENT

CUSTER, SD

REF. DEMO NOTES ( ):DX

D1 REMOVE EXISTING ACOUSTIC CEILING TILE, GWB BACKING AND ATTIC

INSULATION, COORDINATE EXTENTS WITH MECHANICAL. ASSUME ATTIC

INSULATION CONTAINMENT.

D2 REMOVE EXISTING GWB CEILING AND ATTIC INSULATION, COORDINATE

EXTENTS WITH MECHANICAL. ASSUME ATTIC INSULATION CONTAINMENT.

D3 REMOVE EXISTING WALL AS REQUIRED FOR NEW MECHANICAL PIPES.

COORDINATE EXTENTS WITH MECHANICAL.

D5 REMOVE EXISTING WALL FOR MECHANICAL OUTSIDE AIR DUCT.

COORDINATE EXTENTS WITH MECHANICAL.

SCALE: 1/8" = 1'-0"

FIRST FLOOR - DEMOLITION REFLECTED CEILING PLAN

SCALE: 1/8" = 1'-0"

BASEMENT - DEMOLITION REFLECTED CEILING PLAN

DATE INITIAL

KEY PLAN NORTH

NORTH

STAIR

STORAGE

FAN ROOM

WORKROOM

D3

STAIR

ELEVATOR

MACHINE

ROOM

D4

1044 North 115th Street | Suite 300

Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

238608 / 80005

80005

C U s e rs \s w e h lin g

\D o c u m e n ts

\r e v it te m p \0

-A

R C

H

R s w e h lin g

.r v t

SMW

SMW

DJK

2/24/23

07310.034

A002

DEMOLITION - CEILING

PLANS, DETAILS

07310034- 2- A002 DEMOLITION - CEILING PLANS, DETAILS

HVAC REPLACEMENT

JEWEL CAVE NATIONAL MONUMENT

CUSTER, SD

SCALE: 1/8" = 1'-0"

SECOND FLOOR (DEMOLITION CEILING PLAN)

REF. DEMO NOTES ( ):DX

NORTH

NORTH

D3 REMOVE EXISTING WALL AS REQUIRED FOR NEW MECHANICAL PIPES.

COORDINATE EXTENTS WITH MECHANICAL.

D4 REMOVE EXISTING GWB CEILING FOR NEW MECHANICAL EQUIPMENT,

COORDINATE EXTENTS WITH MECHANICAL.

DATE INITIAL

SCALE: 1/8" = 1'-0"

THIRD FLOOR (DEMOLITION CEILING PLAN)

STORAGE

WORKROOM

STAIR

FAN ROOM

ELEVATOR

MACHINE

ROOM

STAIR

1044 North 115th Street | Suite 300

Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

238608 / 80005

80005

C U s e rs \s w e h lin g

\D o c u m e n ts

\r e v…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .