Sol_140P5521R0011_Amd_0009.pdf
PDF 85 KB Posted
- Attached to
- REPLACE ROOFS AT CAPE LOOKOUT Federal contract opportunity
- Solicitation number
- 140P5521R0011
About this file
This document is an amendment to a solicitation for replacing roofs at Cape Lookout in North Carolina. The National Park Service Southeast Region seeks to replace roofs at Great Island and provides an answer clarifying that the workmanship and material warranty is a standard commercial warranty to be provided by the contractor, who must ensure installation according to manufacturer specifications to receive the full manufacturer warranty. The proposal due date of April 13, 2021 at 4:00 PM EDT specified in a previous amendment is not extended and remains unchanged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5521R0011_Amd_0010.pdf | ||
| Sol_140P5521R0011_Amd_0008.pdf | ||
| Sol_140P5521R0011_Amd_0007.pdf | ||
| Sol_140P5521R0011_Amd_0006.pdf | ||
| Sol_140P5521R0011_Amd_0005.pdf | ||
| Questions with Responses_0004.pdf | ||
| Sol_140P5521R0011_Amd_0004.pdf | ||
| Response to Questions_0003.pdf | ||
| Pre-Proposal Site Visit Sign-In_0003.pdf | ||
| Sol_140P5521R0011_Amd_0003.pdf | ||
| Sol_140P5521R0011_Amd_0002.pdf | ||
| Sol_140P5521R0011_Amd_0001.pdf | ||
| Attachment 0005 - Executive Order 13991.pdf | ||
| Sol_140P5521R0011.pdf | ||
| Attachment 0003- Wage Determination.pdf | ||
| Attachment 0002 - Cabin Maps and Dimensions.pdf | ||
| Attachment 0001 - SOW.pdf | ||
| Attachment 0004 Past Performance Questionnaire.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P5521R0011 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PSH
Bradenton FL 34209 8300 De Soto Memorial Hwy DOI, NPS, SER - De Soto MABO
04/08/20210009
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/10/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1. The purpose of this amendment is to answer an question and to clarify that the reference to the proposal due date being extended in Amendment 0007 is NOT being extended and still remains 13 April 2021 @ 4:00 PM EDT:
A. What about the workmanship and material warranty?
Answer: The Contractor is to provide the standard, commercial workmanship warranty. The
Contractor is to ensure that the roofs are installed in accordance with manufacturer's specifications to ensure that the Government receives the full manufacturer's warranty on the roofs. This may include expenses incurred for the manufacturer to inspect the roof.
B. The due date for receipt of proposals remains 13 April 2021 at 4:00 PM EDT.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Scott Achin
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P5521R0011/0009
Legacy Doc #: NPS
Period of Performance: 05/17/2021 to 09/14/2021
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .