This document is an amendment to a solicitation for replacing roofs at Cape Lookout in North Carolina. The National Park Service seeks to replace shingled roofs on cabins and structures, including all overhangs, extensions, and porches. The pitch of the existing roofs is unknown. Offerors may visit the site to determine pitches. The amendment extends the question deadline to April 7th and the proposal deadline to April 13th in response to requests. It confirms that Eagleview software can determine roof pitches and requires offerors to provide a warranty for all construction work.

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE ROOFS AT CAPE LOOKOUT, newest first.
File Type Posted
Sol_140P5521R0011_Amd_0010.pdf PDF
Sol_140P5521R0011_Amd_0009.pdf PDF
Sol_140P5521R0011_Amd_0008.pdf PDF
Sol_140P5521R0011_Amd_0006.pdf PDF
Sol_140P5521R0011_Amd_0005.pdf PDF
Questions with Responses_0004.pdf PDF
Sol_140P5521R0011_Amd_0004.pdf PDF
Response to Questions_0003.pdf PDF
Pre-Proposal Site Visit Sign-In_0003.pdf PDF
Sol_140P5521R0011_Amd_0003.pdf PDF
Sol_140P5521R0011_Amd_0002.pdf PDF
Sol_140P5521R0011_Amd_0001.pdf PDF
Attachment 0005 - Executive Order 13991.pdf PDF
Sol_140P5521R0011.pdf PDF
Attachment 0003- Wage Determination.pdf PDF
Attachment 0002 - Cabin Maps and Dimensions.pdf PDF
Attachment 0001 - SOW.pdf PDF
Attachment 0004 Past Performance Questionnaire.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P5521R0011 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PSH

Bradenton FL 34209 8300 De Soto Memorial Hwy DOI, NPS, SER - De Soto MABO

04/06/20210007

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/10/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

A. The purpose of this amendment is to provide the deadline for receipt of questions, provide responses to additional question and to extend the proposal due date.

1. The deadline for receipt of questions is 2:00 ED on 7 April 2021.

2. Can the proposal due date be extended by 10 days.

A: No; however, the proposal due date is hereby extended to 4:00 PM ED on 13 April 2021.

3. The due date for receipt of proposals is hereby extended to 4:00 PM ED on 13 April 2021.

A: Everything is to getting a shingle roof, to include all overhangs, extensions and

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Scott Achin

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P5521R0011/0007 porches. The pitch of the roofs is unknown.

Please reference Statement of Work (Attachment

0001) and Cabin Maps and Dimensions (Attachment

0002). If you would like to visit the site to determine the pitch of the roofs, you are authorized to visit the site. However, since a formal site visit has already been conducted, a second formal site visit will not be conducted. A warranty shall be provided on all construction work.

3. In Amendment 0006, there is a question about the pitch of the roofs. I referenced the

Statement of Work as well as the Cabin Maps and

Dimensions documents. It is my understanding that the pitch of the awnings does not identify the pitch. It is my understanding that Eagleview software can be utilized to determine the applicable pitch.

Legacy Doc #: NPS

Period of Performance: 05/17/2021 to 09/14/2021