Questions with Responses_0004.pdf
PDF 120 KB Posted
- Attached to
- REPLACE ROOFS AT CAPE LOOKOUT Federal contract opportunity
- Solicitation number
- 140P5521R0011
About this file
This document contains questions and responses regarding a federal contract opportunity to replace roofs at Cape Lookout in North Carolina. The opportunity involves replacing 100% of the fascia boards, rake boards, soffit, and roofing materials on structures located at Great Island with pressure treated lumber and stainless steel hardware. The contractor will be responsible for disposal of all trash, old materials, and debris in accordance with regulations and for transport of any dumpsters over waterways. The winning contractor is not required to have a North Carolina license. Limited lodging is available at a small law enforcement building on site with two bunk beds that can accommodate up to eight people, along with running water, limited electricity, and one bathroom. The contractor must leave the building in the same clean condition and is responsible for any damages incurred during stay.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5521R0011_Amd_0010.pdf | ||
| Sol_140P5521R0011_Amd_0009.pdf | ||
| Sol_140P5521R0011_Amd_0008.pdf | ||
| Sol_140P5521R0011_Amd_0007.pdf | ||
| Sol_140P5521R0011_Amd_0006.pdf | ||
| Sol_140P5521R0011_Amd_0005.pdf | ||
| Sol_140P5521R0011_Amd_0004.pdf | ||
| Response to Questions_0003.pdf | ||
| Pre-Proposal Site Visit Sign-In_0003.pdf | ||
| Sol_140P5521R0011_Amd_0003.pdf | ||
| Sol_140P5521R0011_Amd_0002.pdf | ||
| Sol_140P5521R0011_Amd_0001.pdf | ||
| Attachment 0005 - Executive Order 13991.pdf | ||
| Sol_140P5521R0011.pdf | ||
| Attachment 0003- Wage Determination.pdf | ||
| Attachment 0002 - Cabin Maps and Dimensions.pdf | ||
| Attachment 0001 - SOW.pdf | ||
| Attachment 0004 Past Performance Questionnaire.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Is the site visit required to be able to submit a bid?
A: No. Although it is highly recommended, a site visit is not required in order to submit a bid.
2. Is the winning contractor required to have a NC contractor license?
A: No, the winning contractor does not have to have to be licensed in NC.
3. What or how does the contractor get rid of trash/ old shingles and debris?
A: It is the responsibility of the contractor to dispose of trash, old shingles and debris in accordance with all applicable regulations. Contractor shall be responsible for removal and disposal of all refuse from Great Island and from Cape Lookout. Contractor shall be responsible for procurement/rental of all dumpsters. Contractor shall be responsible for transport of dumpsters/containers/trailers over public waterways. Transport over waterways may include use of privately owned vehicle ferry service from Davis, NC, or rental/sub-contracting of marine construction barge services for transport. All options are the responsibility of the Contractor; to include logistics, planning and cost. The park will not assist in transport, movement, or placement of containers/dumpsters. The park will also not transport dumpsters at Great Island for the Contractor. Contractor shall be responsible for providing heavy equipment to move dumpsters and material. There is no Government-furnished property.
4. Is the fascia board being replaced?
A: Yes, 100%. It’s in the SOW, KDAT prime #1 pressure treated. All type 316 stainless hardware.
If soffit is vinyl it will go back vinyl. All of the below listed surfaces are subject to 100% replacement.
Quote from SOW:
4.5.4 Replace eve, fascia, rake boards, and soffit on each structure. 100% replacement required.
Lumber to be KDAT #1, Pressure treated.
5. Is there new vinyl soffit going up or just plywood and all the fascia boards are being replaced? If so, will they need to be painted of wrapped in metal?
A: 100% replacement of all rakes, fascia and soffit. Vinyl soffit will match in-kind size, shape, and color. All lumber that is replaced will be painted. If soffit is plywood, it can go back plywood and be painted to match. If soffit is vinyl then it will be replaced with vinyl.
Quote from SOW:
Section 4.5.4: Replace eve, fascia, rake boards, and soffit on each structure. 100% replacement required. Lumber to be KDAT #1, Pressure treated.
Section 4.5.5: Paint eve, fascia, rake boards, and soffit.
Sherwin Williams, Woodscapes, Premium exterior wood stain, COR to provide custom color for the stain.
6. I saw that we will be allowed to use the law enforcement building if we win the award for the great island roof project. Do you know how many rooms this has or people it could sleep? Does it have power and bathrooms?
A: There are two (2) single Bunk beds which can sleep four (4) people. If the Contractor brings cots or air mattresses, you Could sleep six (6) to eight (8).
There is running water and LIMITED electricity. The unit has AC, but the park cannot promise that there will be sufficient amperage to support it.
There is 1 bathroom, 1 shower, 1 toilet.
This is a small cabin. It is what we can offer.
Contractor shall be responsible for cleaning this cabin when they vacate, leaving it in the same condition as when they arrive.
Contractor shall be responsible for any damage caused during their stay.
The COR will personally inspect this cabin.