QUESTIONS_AND_ANSWERS_0002.pdf

PDF 148 KB Posted

Attached to
INSTALL FIRE SUPPRESSION SYSTEM, ANJO Federal contract opportunity
Solicitation number
140P5325R0008
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This document is a Questions and Answers (Q&A) file for the 140P5325R0008 Fire Suppression System Install federal contract opportunity. The Q&A addresses two technical clarifications: 1) confirmation that a Reduced Pressure Principle Valve Assembly backflow preventer complying with ASSE 1012 and AWWA M14 is required, and 2) guidance on resolving a fire line sizing discrepancy between drawings FX501 (2" underground supply) and C101 (6" fire line). The contracting team suggests the contractor can reduce pipe size on the building's exterior before entering the building, with the 6" line currently extending from the city's main to the edge of the landscape where the fire suppression system will be installed.

View the file

Other files for this federal contract opportunity

Other files attached to INSTALL FIRE SUPPRESSION SYSTEM, ANJO, newest first.
File Type Posted
Sol_140P5325R0008_Amd_0002.pdf PDF
Sol_140P5325R0008_Amd_0001.pdf PDF
ATTACHMENT_7_Construction_Contract_Administration.docx DOCX document
A06_ATTACHMENT_3_Project_Calculations_(311420).pdf PDF
ATTACHMENT_8_-__Limitation_on_Subcontracting_Report.xlsx XLSX spreadsheet
A05_ATTACHMENT_1_Specifications_(311420).pdf PDF
ATTACHMENT_6_Past_Performance_Questionnaire.docx DOCX document
B03_ATTACHMENT_5_Wage_Rate_Determination.pdf PDF
Sol_140P5325R0008.pdf PDF
A06_ATTACHMENT_2_Drawings_-_Sealed_(311420).pdf PDF
ATTACHMENT_4_Contract_Price_Schedule_-_EH_(311420).xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P5325R0008 FIRE SUPPRESSION SYSTEM INSTALL

QUESTIONS AND ANSWERS

1. Section 21 13 16 – Preaction Sprinkler Systems The specification references ASSE 1013 for Reduced Pressure Principle Backflow

Preventers and ASSE 1012 under section 2.8 for Reduced Pressure Valve Assemblies.

Question: Is a Reduced Pressure Backflow Assembly required, or would a Double Check Assembly be acceptable?

Answer: Per specifications 21 13 16-15 2.8 A. Reduced-pressure principle valve assembly backflow preventer complying with ASSE 1012 and AWWA M14 would be required.

2. Fire Line Sizing Discrepancy Drawing FX501 notes an underground supply size of 2", whereas drawing C101 indicates a 6" fire line.

Question: Where should the transition/reduction in pipe size occur? There is not an exact location identified on the drawings.

Answer: If the contractor can reduce the size on the outside of the building before going in the building would be great. There is not an exact location identified on the drawings. Currently there is a 6” line from the city’s main to the edge of the landscape on the exterior of the building this fire suppression will be going. If you look at drawing C101 and Specific note number 2 is where the pipe stops.