ATCH 1 SOO NLO Roof Replacement.pdf
PDF 1004 KB Posted
- Attached to
- Asphalt Shingle Roof System Replacement GUIS NLO
- Solicitation number
- 140P5221Q0016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Q and A.pdf | ||
| Site Visit Sign-in.pdf | ||
| Sol_140P5221Q0016_Amd_0001.pdf | ||
| ATCH 2 DWG 635 41-062B Reduced File Size.pdf | ||
| ATCH 3 DOL WD FL20210083.pdf | ||
| Sol_140P5221Q0016.pdf | ||
| ATCH 4 FACT SHEET_Roofing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gulf Islands National Seashore Gulf Breeze, Florida
STATEMENT OF OBJECTIVES:
NLO Buildings Roof Replacement
PMIS 171741
DATED:
November 2020
NATIONAL PARK SERVICE
STATEMENT OF OBJECTIVES (SOO)
SOO Format
1. Background
2. Objectives
3. Place of performance
4. Period of performance
5. Scope
6. Safety
7. Tasks
8. Delivery
9. Government-Furnished Property (GFP)
10. Security Considerations
11. Special Material Requirements
12. Other Unique Requirements and Considerations
13. Quality Assurance Requirement
14. Project Personnel
15. Invoices and Payments
1. BACKGROUND
Gulf Islands National Seashore (GUIS) is a unit of the National Park Service and is head quartered in Gulf Breeze, FL. Six (6) buildings located in the Naval Live Oaks (NLO) area of GUIS located in Gulf Breeze are in need of complete asphalt shingle roof replacement. The utilization of these buildings varies, such as, Park Headquarters, NLO Picnic Area, NLO Group Camping area and Fire Cache.
2. OBJECTIVES:
The work of this contract consists of providing all labor, equipment, supervision and materials to accomplish the removal and installation of the asphalt shingles, including but not limited to:
• Removal and disposal of the existing asphalt shingles and underlayment.
• Repair and or replacement of any damaged or rotted sections of wood sheathing.
• Installation of roofing underlayment (such as 15 lb. felt paper: equivalent or better)
• Installation of new asphalt shingles (roofing will be replaced with architect style asphalt shingles), Color shall match as close as possible to existing shingles and to be approved by COR.
• Install a continuous shingle-over ridge vent with louvered sides along the spine of the main roof ridge line.
• Remove existing drip edge and install new aluminum drip edge, color will be approved by park COR.
• Install new flashing around existing vent pipes, chimneys and all roof penetrations.
• Material/workmanship shall comply with the 7th Edition (2020) Florida Building Code
3. PLACE OF PERFORMANCE:
Gulf Islands National Seashore Park Headquarters: 1801 Gulf Breeze Parkway, Gulf Breeze FL 32563.
4. PERIOD OF PERFORMANCE:
Three month period (90 days) after Notice To Proceed.
5. SCOPE:
In accordance with the terms and conditions herein, the prime contractor or his sub-contractors shall perform the work of this contract for the National Park Service (NPS).
The contractor will complete the following items:
1. Contractor will provide all material, equipment, parts and labor required to perform all of the work of this contract
2. All equipment, material and waste removed or generated by work of this contract shall be properly disposed of offsite by the contractor.
3. Contractor shall verify the quantity of materials needed to complete the task identified in this
SOO.
4. Contractor will provide a work site and environment that is safe for employees, for visitors to the
Park, and NPS staff. If needed, the work area will be cordon off and secure.
5. All work will be performed Monday through Friday from 7:00 am until 3:30 pm. No work will be performed on weekends or federal holidays without prior approval.
6. Contractor and employee parking and equipment storage areas will be designated by the Park. No company signs shall be installed on government property. Smoking and eating will be performed in areas designated by the Park. Employees shall wear appropriate clothing at all times.
7. Contractors will notify NPS staff of scheduled site visits to ensure access to secure areas.
8. The Davis-Bacon Act applies for this contract.
6. SAFETY:
All work performed on government property will be accomplished in accordance with OSHA, EPA, Federal, State and local regulations and requirements. Prior to starting work on government property, the contractor will submit to Gulf Islands National Seashore for approval a copy of their company safety plan pertaining to this particular contract. Although not all inclusive, the safety plan must address at a minimum the following areas:
1) Heavy equipment operations (if required)
2) Fall Protection
3) Public/visitor safety (barriers/signage, etc…)
4) Traffic safety plan (if required)
5) Scaffold safety plan (if required)
6) Personal protective equipment to be used
7) Hazardous materials (HAZMAT) to be used
a. Copies of Safety Data Sheets (SDS) must be provided to the Park
b. Storage of HAZMAT
8) Emergency response protocols
9) Personnel training requirements
10) OSHA DART rate
a. OSHA 300A Summary for last three years
Contractor shall use “green” products whenever possible and all HAZMAT must be pre-approved for use by the GUIS Collateral Duty Safety Coordinator. The contractor will be responsible for the safety and security of the site to ensure unauthorized personnel (park visitors & employees) do not enter the construction area.
7. TASKS:
COMMUNICATION
A). Contractor shall notify the Contracting Officer’s Representative (COR) between 7:00 and 7:15 am each day work or inform the COR why services cannot be performed that day. The COR is Scott Mapes, office number: 850-934-2627, cell phone: 850-393-8036.
B). Work shall be performed during daylight hours between 7:00 am and 3:30 pm Monday through Friday, excluding federal holidays. Weekend work will not be permitted, unless prior approval by the park Contracting Officer.
C). Schedule changes MUST be cleared through the Contracting Officer
SPECIFIC REQUIREMENTS
• The material installation methods will be consistent with the material manufacture requirements, construction industry standards and local code requirements.
• The asphalt shingles shall be architectural style shingles
• Roof drip edge will be aluminum
• Shingle and drip edge color will be approved by the COR
The work of this contract consists of providing all labor, equipment, supervision and materials to accomplish the removal and installation of the asphalt shingles, including but not limited to:
• Removal and disposal of the existing asphalt shingles and underlayment.
• Repair and or replacement of any damaged or rotted sections of wood sheathing.
• Installation of roofing underlayment (such as 15 lb. felt paper: equivalent or better)
• Installation of new asphalt shingles (roofing will be replaced with architect style asphalt shingles), Color shall match as close as possible to existing shingles and to be approved by COR.
• Install a continuous shingle-over ridge vent with louvered sides along the spine of the main roof ridge line.
• Remove existing drip edge and install new aluminum drip edge, color will be approved by park COR.
• Install new flashing around existing vent pipes, chimneys and all roof penetrations.
GERERAL PROVISIONS
1. Naval Live Oaks (NLO) Picnic Area Shelter – footprint = 1700 square feet
2. Naval Live Oaks (NLO) Picnic Area Restroom - footprint = 1200 square feet
3. Park Headquarters - footprint =10,970 square feet
4. Naval Live Oaks (NLO) Group Camping Shelter – footprint = 1700 square feet
5. Naval Live Oaks (NLO) Group Camping Restroom – footprint = 1200 square feet
6. Fire Cache - footprint = 2960 square feet
WEATHER
Contractor shall notify the COR by 7:00 am of any intention to cancel work for the day due to inclement weather.
8. DELIVERY:
All deliverables required to complete this project will be delivered by the contractor.
• Asphalt shingle cut sheets
• Roofing underlayment cut sheets
• Safety plan
• Proof of Insurance
9. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR INFORMATION
(GFP, GFM, GFE, OR GFI):
None
10. SECURITY:
The information developed under this Statement of Objectives is the property of the U.S.
government and shall be kept in strict confidence. Proprietary or copyrighted material may not be included into the contract information CDs unless otherwise approved in writing by the Contracting Specialist.
11. SPECIAL MATERIAL REQUIREMENTS:
• Architectural style shingles GAF Timberline HDZ Laminated Architectural Roof Shingles or approved equal. Fire Rating: Class A | Wind Rating: 130 (MPH) | FL Product Approved for use in HVHZ
• Roof drip edge will be aluminum
• Shingle and drip edge color will be approved by the COR
12. OTHER UNIQUE REQUIREMENTS:
None
13. QUALITY ASSURANCE REQUIREMENT:
The contractor shall develop and maintain a quality control program to ensure services are performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the contractor shall develop quality control procedures addressing the critical areas identified in this statement of work. The government will periodically evaluate the contractor’s performance in accordance with the statement of work.
Prior to issuance of Notice to Proceed, the Contractor shall be required to submit to the CO/COR the following items (Electronic submission in PDF or MS Office format is acceptable):
• Safety plan
• Proof of Insurance
14. PROJECT PERSONNEL:
Contracting Officer (CO):
Evans Andre Ward O: 850-934-2614
C: 850-232-4630 Email: andre_ward@nps.gov
Contracting Officer Representative (COR):
Scott Mapes Deputy Chief of Facilities O: 850-934-2627 C: 850-393-8036 Email: scott_mapes@nps.gov
Chief of Facility Management (CFM):
Gary Stansberry Chief of Facilities O: 850-934-2610 C: 850-232-3625 Email: gary_stansberry@nps.gov
15. INVOICES AND PAYMENTS:
52.232-1 PAYMENTS (APR 1984)
The Government shall pay the Contractor, upon the submission of proper invoices or vouchers, the prices stipulated in this contract for supplies delivered and accepted or services rendered and accepted, less any deductions provided in this contract. Unless otherwise specified in this contract, payment shall be made on partial deliveries accepted by the Government if—
(a) The amount due on the deliveries warrants it; or
(b) The Contractor requests it and the amount due on the deliveries is at least $1,000 or 50 percent of the total contract price.
(End of clause)
Adjustment for Inadequate Performance
• Well maintained buildings are the National Park Service’s goals. Routine inspection shall be performed to minimize work improperly performed. Such inspections are designed only to assure that the NPS pays only for those services, which have been specified, and adequately completed by the contractor.
• In the event the contractor fails to successfully perform the required work, the National Park Service has the right to withhold partial payment.
mailto:scott_mapes@nps.gov mailto:gary_stansberry@nps.gov
Park Headquarters NLO Picnic Area
NLO Group Camp Fire Cache
| Statement of OBJECTIVES (SOO) |
| 1. Background |
| 2. Objectives: |
| 3. Place of Performance: |
| 4. Period of Performance: |
| 5. Scope: |
| 6. Safety: |
| 7. Tasks: |
| 8. Delivery: |
| 9. Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or GFI): |
| 10. Security: |
| 11. Special Material Requirements: |
| 12. Other Unique Requirements: |
| 13. Quality ASSURANCE Requirement: |
| The contractor shall develop and maintain a quality control program to ensure services are performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non... |