A06_-_Plans.pdf

PDF 9 MB Posted

Attached to
CONSTRUCT CANOE LAUNCH & TRAIL EXTENSION Federal contract opportunity
Solicitation number
140P5219R0039
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This document contains construction plans and specifications for a federal contract opportunity to construct a canoe launch, trail extension, and pedestrian bridge at Mammoth Cave National Park. Key details include:

  • The National Park Service is soliciting proposals on a total small business set-aside basis to construct a new canoe launch at the Green River Ferry Crossing site, a new trail bridge over the Echo River, and additional concrete trail surface to complete the accessible Echo River Trail. Construction of the canoe launch is anticipated to take place between July and September 2020 to correspond with low water conditions.

  • The contract will be a negotiated firm-fixed-price contract requiring both a technical and price proposal. The estimated value is between $1,000,000 to $2,000,000. The period of performance is from March 1, 2020 to November 15, 2020. A pre-proposal meeting will be held and the solicitation issue date is estimated to be October 18, 2019. The NAICS code is 237990 with a size standard of $36.5 million.

Mammoth Cave Project Plans August 2019

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT CANOE LAUNCH & TRAIL EXTENSION, newest first.
File Type Posted
Pre-submittal_Questions_-_Laurie.pdf PDF
Sol_140P5219R0039_Amd_0002.pdf PDF
Site_Visit_Docs.pdf PDF
Directions_To_Training_Center_From_South.pdf PDF
Sol_140P5219R0039_Amd_0001.pdf PDF
Directions_To_Training_Center_From_the_North.pdf PDF
B03_-_DOL_Wage_Determination.pdf PDF
Sol_140P5219R0039.pdf PDF
Clauses_-_UCF1.docx DOCX document
A06_-_Specifications.pdf PDF
B08_-_Proposal_Submission_Package.pdf PDF
A06_-_Specifications.pdf PDF
B03_-_DOL_Wage_Determination.pdf PDF
Sol_140P5219R0039.pdf PDF
Clauses_-_UCF1.docx DOCX document
A06_-_Plans.pdf PDF
B08_-_Proposal_Submission_Package.pdf PDF
B08_-_Proposal_Submission_Package.pdf PDF
B03_-_DOL_Wage_Determination.pdf PDF
A06_-_Specifications.pdf PDF
Clauses_-_UCF1.docx DOCX document
Sol_140P5219R0039.pdf PDF
A06_-_Plans.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100% COMPLETE CONSTRUCTION DOCUMENTS

0 40 80 160 Feet

0 10 20 40 Feet

Notes

Existing Conditions Legend

SF

SF

SF

SF

IP

Demolition Legend

SF

SF

SF

SF

SF

100% COMPLETE CONSTRUCTION DOCUMENTS

C7.8 B

C7.3 A|B

C7.2 B

C7.5 B

S2.1 1|2

C7.2 B

C7.7 A

C7.2 B

C7.2 D

C7.4 A

C7.4 A

C7.2 A

S1.0 1-3

C7.2 H

C4.1 A

C4.1 B

C7.4 B

C7.4 B

C7.1 C

C7.2 F

Finish Materials Legend

C7.5

C7.2 B

S1.0 1-3

C7.2 F

C3.4

C3.4

Grading Legend

0 3 6 12 Feet

C4.1

C4.1 A

C4.4

0 2 4 8 Feet

0 2 4 8 Feet

Notes Layout Legend

Layout Legend

C4.3

C4.3

Layout Legend

Echo River Trail Number Delta Radius Length Bearing Ch. Dist. Start Northing Start Easting End Northing End Easting

Echo River Trail Number Delta Radius Length Bearing Ch. Dist. Start Northing Start Easting End Northing End Easting

Canoe Kayak

Number Delta Radius Length Bearing Ch. Dist. Start Northing Start Easting End Northing End Easting

Bridge Alignment

Number Delta Radius Length Bearing Ch. Dist. Start Northing Start Easting End Northing End Easting

0+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+12

80'

CONCRETE STAIRS

40'

ALUMINUM STAIRS

S2.0 1/2

S2.0 1/2

C7.8 D

S2.1

C7.7 A

C7.3 A

C7.8 D

C7.3

1-5

S2.1

0+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25 2+50 2+73

2+732+75 3

4404404

4504504

2+++++

S1.0

1|2S1.0 1|2

C7.6

C

Horiz.

Vert.

0 5 10 20 Feet

2+732+75 3+00 3+25 3+50 3+75 4+00 4+25 4+50 4+75 5+00 5+25 5+50 5+75

5+75 6+00 6+25 6+50 6+75 7+00 7+25 7+50 7+75 8+00 8+25 8+50 8+75

8+75 9+00 9+25 9+50 9+75 10+00 10+25 10+50 10+75 11+00 11+25 11+50 11+75

Vert.

Elevation

Offset

410.0

415.0

420.0

425.0

430.0

410.0

420.0

430.000

420.0

425.0

430.0

410.0

420.0

425.0

430.0

410.0

425.0

430.0

435.0

415.0

420.0

430.0

420.0

425.0

430.0

410.0

420.0

425.0

430.0

410.0

425.0

430.0

435.0

415.0

420.0

425.0

430.0

435.0

440.0

445.0

420.0

430.0

440.0

430.0

435.0

440.0

420.0

440.000

430.0

435.0

440.0

420.0

440.000

435.0

440.0

445.0

425.0

430.0

435.0

440.0

445.0

425.0

430.0

435.0

440.0

445.0

425.0

430.0

435.0

440.0

445.0

425.0

430.0

435.0

440.0

445.0

450.0

430.0

450.000

Vert.

SECTION NOTES

440.0

445.0

450.0

430.0

440.0

445.0

450.0

430.0

440.0

445.0

450.0

430.0

445.0

450.0

455.0

435.0

440.0

450.0

445.0

450.0

455.0

435.0

440.0

445.0

450.0

455.0

435.0

440.0

445.0

450.0

455.0

460.0

440.0

460.000

450.0

455.0

460.0

440.0

450.0

455.0

460.0

440.0

450.0

455.0

460.0

440.0

450.0

455.0

460.0

440.0

450.0

455.0

460.0

440.0

450.0

455.0

460.0

440.0

455.0

460.0

465.0

445.0

450.0

460.0

Vert.

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

445.0

450.0

455.0

460.0

435.0

440.0

445.0

450.0

455.0

460.0

435.0

440.0

445.0

450.0

455.0

460.0

435.0

440.0

445.0

450.0

455.0

460.0

435.0

440.0

445.0

450.0

455.0

460.0

435.0

440.0

445.0

450.0

455.0

460.0

435.0

440.0

445.0

450.0

455.0

460.0

435.0

440.0

430.0

435.0

440.0

445.0

450.0

455.0

460.0

420.0

430.0

440.0

430.0

435.0

440.0

445.0

450.0

455.0

460.0

420.0

430.0

440.0

430.0

435.0

440.0

445.0

450.0

455.0

460.0

420.0

430.0

440.0

430.0

435.0

440.0

445.0

450.0

455.0

460.0

420.0

430.0

440.0

430.0

435.0

440.0

445.0

450.0

455.0

460.0

420.0

430.0

440.0

430.0

435.0

440.0

445.0

450.0

455.0

460.0

420.0

430.0

440.0

430.0

435.0

440.0

445.0

450.0

455.0

460.0

420.0

430.0

440.0

450.0

455.0

460.0

440.0

450.0

455.0

460.0

440.0

450.0

455.0

460.0

440.0

450.0

455.0

460.0

440.0

450.0

455.0

460.0

440.0

450.0

455.0

460.0

440.0

Vert.

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

Vert.

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

Vert.

STA: 5+50 - 6+60 NOTES

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

Vert.

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

455.0

460.0

445.0

Vert.

S1.0

1|2

E

F

G

F

C7.5 B-D

S1.1

C7.6 A

C7.7

S2.1

W/ 4" OPENING (MAX)

PICKET RAILING TRUSS VERTICALS

& DIAGONALS

TOP & BOTTOM

CHORDS

E-CHANNEL

BOX FRAME

1 1/2" HANDRAIL

CLEARANCE

ELEVATION VIEW

125'

PICKET

HANDRAIL

TOP CHORD

& END POSTS

PICKET

SEE "RAIL DETAIL"

RAIL

BRACKET

5"

1'-4" (TYP)

4"

1 1/8"x2 1/2" SLOTS

THRU BASE PLATES &

1 1/8" HOLES THRU

UHMW BEARING PADS

ELEVATION BASE DETAIL

(TYP)

PLAN BASE DETAIL

(TYP)

DECKING

A

STRINGERS

SEE "ELEVATION BASE DETAIL"

HORIZONTAL BRACING

FLOOR BEAMS &

8"

UHMW BEARING PADS OFFSET

1" FROM BASE PLATES FOR

EXPANSION & CONTRACTION

2 1/2"

STRINGERS

SECTION A-A FLOOR BEAMS &

HORIZONTAL BRACING

TRUSS END POSTS

2 1/2"

RAIL DETAIL

(TYP) GUSSET

BOTTOM

CHORD

1/2" BASE

1" UHMW

PLATE

E-CHANNEL

BOX FRAME

BEARING PAD

TRUSS VERTICALS

& DIAGONALS

TOERAIL

DECKING

2" (MAX)

SPACING

8'-0"

36"

(TYP)

PICKET RAILING

42"

(TYP)

A

CHORDS & END POSTS

TOP & BOTTOM E-CHANNEL

BOX FRAME

PLAN VIEW TRUSS VERTICALS

& DIAGONALS

1/2" BASE PLATE

W/ 1" THICK UHMW

BEARING PADS