B09_Amendment_1_Attachment_10_Example_Waste_Management_Tracking_Sheet_0001.pdf
PDF 61 KB Posted
- Solicitation number
- 140P3022Q0005
About this file
This document contains a construction and waste management tracking sheet template and an example construction and demolition waste management plan outline.
The tracking sheet template lists common construction materials and provides columns to track disposal date, whether the material was diverted from landfills or incineration and how, hauler or destination information, volume or weight, and totals for diverted, non-diverted, and all waste. The example construction and demolition waste management plan outline lists five articles that would be included in the plan, such as general overview and purpose, identifying target materials to be recycled or salvaged, means and methods to achieve a 50% diversion rate including waste reduction, separation and delivery, on-site waste logging, and location of recycle areas. It also includes subcontractor requirements for orientation, task documentation, and clean up, as well as monitoring progress through record keeping and reports.
The related federal contract opportunity is for catch basin cleaning services for the National Mall and Memorial Parks in Washington DC. The solicitation number is 140P3022Q0005 and was issued by the National Park Service National Office within the Department of the Interior.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction and Waste Tracking Sheet –
Material Description Disposal date
Diverted from Landfill or incinerator?
(Y/N)
Diversion method (Recycled, Salvaged, etc.)
Hauler or Destination (submit receipts)
Volume (in cubic feet)
Weight (in tons)
Glazing Acoustical Tile Carpet Carpet Pad Equipment Plywood Plumbing Fixtures Piping Piping Supports Valves Sprinklers Mechanical Equip.
Electrical Conduit Copper Wiring Light Fixtures Lamps Lighting Ballasts Electrical Devices Panelboards Transformers Other: Stone Pavers Other:
Other:
Total Diverted Total Not Diverted
Total All Waste = Total Diverted + Total Not Diverted % Diversion Rate* = Total Diverted/Total All Waste
| ADP5EA1.tmp |
| Article I. DESCRIPTION OF CONSTRUCTION & DEMOLITION WASTE MANAGEMENT PLAN |
| Section 1.01 General Overview and Purpose |
| Section 1.02 Site Description |
| Article II. IDENTIFY TARGET MATERIALS |
| Section 2.01 Analysis of Job Site Waste Generated |
| Article III. MEANS AND METHODS TO ACHIEVE 50% DIVERSION |
| Section 3.01 Waste Reduction |
| Section 3.02 Separation and Delivery |
| Section 3.03 On-Site Waste Log |
| Section 3.04 Location of Recycle Area |
| Article IV. SUBCONTRACTORS REQUIREMENTS ORIENTATION |
| Section 4.01 Preconstruction Meetings |
| Section 4.02 Task Requirements/Documentation |
| Section 4.03 Clean Up |
| Article V. MONITORING PROGRESS |
| Section 5.01 Record Keeping |
| Section 5.02 Reports |