B09_Amendment_1_Attachment_10_Example_Waste_Management_Tracking_Sheet_0001.pdf

PDF 61 KB Posted

Attached to
CATCH BASIN CLEANING SERVICES - NATIONAL MALL & ME
Solicitation number
140P3022Q0005
Issued by

About this file

This document contains a construction and waste management tracking sheet template and an example construction and demolition waste management plan outline.

The tracking sheet template lists common construction materials and provides columns to track disposal date, whether the material was diverted from landfills or incineration and how, hauler or destination information, volume or weight, and totals for diverted, non-diverted, and all waste. The example construction and demolition waste management plan outline lists five articles that would be included in the plan, such as general overview and purpose, identifying target materials to be recycled or salvaged, means and methods to achieve a 50% diversion rate including waste reduction, separation and delivery, on-site waste logging, and location of recycle areas. It also includes subcontractor requirements for orientation, task documentation, and clean up, as well as monitoring progress through record keeping and reports.

The related federal contract opportunity is for catch basin cleaning services for the National Mall and Memorial Parks in Washington DC. The solicitation number is 140P3022Q0005 and was issued by the National Park Service National Office within the Department of the Interior.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction and Waste Tracking Sheet –

Material Description Disposal date

Diverted from Landfill or incinerator?

(Y/N)

Diversion method (Recycled, Salvaged, etc.)

Hauler or Destination (submit receipts)

Volume (in cubic feet)

Weight (in tons)

Glazing Acoustical Tile Carpet Carpet Pad Equipment Plywood Plumbing Fixtures Piping Piping Supports Valves Sprinklers Mechanical Equip.

Electrical Conduit Copper Wiring Light Fixtures Lamps Lighting Ballasts Electrical Devices Panelboards Transformers Other: Stone Pavers Other:

Other:

Total Diverted Total Not Diverted

Total All Waste = Total Diverted + Total Not Diverted % Diversion Rate* = Total Diverted/Total All Waste

ADP5EA1.tmp
Article I. DESCRIPTION OF CONSTRUCTION & DEMOLITION WASTE MANAGEMENT PLAN
Section 1.01 General Overview and Purpose
Section 1.02 Site Description
Article II. IDENTIFY TARGET MATERIALS
Section 2.01 Analysis of Job Site Waste Generated
Article III. MEANS AND METHODS TO ACHIEVE 50% DIVERSION
Section 3.01 Waste Reduction
Section 3.02 Separation and Delivery
Section 3.03 On-Site Waste Log
Section 3.04 Location of Recycle Area
Article IV. SUBCONTRACTORS REQUIREMENTS ORIENTATION
Section 4.01 Preconstruction Meetings
Section 4.02 Task Requirements/Documentation
Section 4.03 Clean Up
Article V. MONITORING PROGRESS
Section 5.01 Record Keeping
Section 5.02 Reports