About this file

This document package includes construction drawings and technical specifications for a federal highway pavement improvement project. The National Park Service is soliciting offers for DEWA 310424 Pavement Improvements on Highway 209 between mile markers 0.0 through 7.0 within the Delaware Water Gap National Recreation Area in Pennsylvania. The work includes full-depth pavement patching, milling and replacing hot mix asphalt or concrete pavement to specified depths, installing geotextile paving fabric, and regrading aggregate and topsoil as necessary to provide positive drainage up to a maximum of two feet. Addendums one and two provide revisions to material depths and notes.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF

DAA 620

173824

310424

CDS

PJS

5/4/2021

U.S. ROUTE 209 PAVEMENT REHABILITATION,

MM 2.0 - 4.0 100% CONSTRUCTION

DOCUMENT DRAWINGS

DELAWARE WATER GAP NATIONAL RECREATION

AREA

storgerson Polygon storgerson Text Box Grade existing aggregate topsoil to provide positive drainage. No more than 2' maximum to meet the existing grade.

storgerson Pencil storgerson Polygon storgerson Text Box storgerson Text Box Addendum 1 - 08/16/2021 storgerson Polygon storgerson Text Box storgerson Polygon storgerson Polygon storgerson Text Box Top of Milled storgerson Text Box Addendum 2 - 08/24/2021 storgerson Polygon storgerson Typewritten Text storgerson Typewritten Text storgerson Text Box Mill & replace an additional 3" of HMA or to the existing concrete whichever is less storgerson Polygon storgerson Polygon storgerson Typewritten Text storgerson Pencil storgerson Polygon storgerson Polygon storgerson Typewritten Text storgerson Text Box Mill & replace an additional 5.5" of HMA or to the existing aggregate whichever is less storgerson Polygon storgerson Polygon storgerson Text Box Note: Full depth pavement patch only applies to locations without the existing portland cement concrete.

storgerson Polygon storgerson Polygon storgerson Polygon storgerson Polygon storgerson Polygon storgerson Typewritten Text storgerson Typewritten Text storgerson Typewritten Text storgerson Typewritten Text storgerson Text Box PennDOT Geotextile Paving Fabric, Type II storgerson Polygon storgerson Text Box PennDOT Geotextile Paving Fabric, Type II, Section 466 BULLETIN 15 (Publication 35) storgerson Text Box Min. (Typ) storgerson Text Box Top of Milled storgerson Text Box Install