This document outlines proposed equals for a wind chime fabrication completion project for the National Park Service. It lists one product proposed as an equal, along with requirements for submitting equals including investigating and certifying equivalence to the specified item, providing the same warranties, confirming compatibility, and waiving claims for additional expenses resulting from the substitution. Contractors are also encouraged to propose accessible, sustainable, and environmentally responsible materials.
The related federal contract opportunity is solicitation number 140P2020R0034 for FLNI 200729B, seeking completion of a wind chime fabrication project for the Department of the Interior National Park Service National Office.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSED EQUALS
In accordance with Provision 52.211-06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. Use additional sheets of paper as necessary.
| Section No. |
| Paragraph No. |
| Product/Model No. |
| Proposed Product/Model No. |
A.
By submitting the proposed equal, the contractor certifies that it:
1.
Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2.
Will provide, as a minimum, the same warranties for the proposed item as for the item specified.
3.
Has determined that the proposed item is compatible with interfacing items.
4.
Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5.
Waives all claims for additional expenses that may be incurred as a result of the substitution.
B.
The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.