A06_Map_Concrete_0001.pdf

PDF 711 KB Posted

Attached to
REPLACE SURFACE OF HIKE & BIKE TRAIL
Solicitation number
140P1324Q0002
Issued by

About this file

This document package includes a sketch drawing and site plan for a federal contract opportunity to replace the surface of a hike and bike trail at Palo Alto Battlefield National Historical Park. The project scope involves replacing an existing asphalt portion of the Brownsville Historic Battlefield Hike and Bike Trail with a new 8-foot wide concrete trail. The concrete path will start at the edge of existing brick pavers near the Palo Alto Visitor Center and extend southward. It will include a center stripe, directional arrows, and isolation joints at each end. The site plan depicts the location of the new concrete section of trail and provides specifications for subgrade preparation, reinforcement, concrete mix design, and cross-slope. The related federal contract opportunity is solicited by the National Park Service Intermountain Region for the Department of the Interior under solicitation number 140P1324Q0002.

View the file

Other files

File Type Posted
A04_SOW_Amended_0002.pdf PDF
Sol_140P1324Q0002_Amd_0002.pdf PDF
B03_Da_Bacon_0001.pdf PDF
A04_SOW_0001.pdf PDF
Sol_140P1324Q0002_Amd_0001.pdf PDF
Sol_140P1324Q0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGEND

V.C.

HQ.

A4.0

A8.0

ROOM

250 SF

A9.0

A5.0

FIRST FLOOR

100'-0"

5 1 75

KEY

NOTE

WALL

TYPE

DOOR

NUMBER

ELEVATION

MARK

PROJECT

NORTH

DETAIL

REFERENCE

BUILDING

SECTION

EXTERIOR

ELEVATION

INTERIOR

ELEVATION

ROOM

TAG

SYMBOLS

SPOT

SLOPE

2" / 12"

B L D G

N O R T H

X

WINDOW

NUMBER

BLDG

NORTH

XX0X

GRAPHIC SCALE

BATTLEFIELD NHP

PALO ALTO

HQ.

RESACA DE

LA PALMA

BATTLEFIELD

LAURELES

LA

PALOMA

OLIMITO

INDIAN

LAKE

ME

XIC

O

UN

ITE

D STAT

ES

BROWNSVILLE, TEXAS

VICINITY MAP

RIO

GRANDE

MATAMOROS,

MEXICO

BROWNSVILLE,

TEXAS

R

IV

E R

LOS

FRESNOS

NO SCALE

E. PRICE

ROAD

LAK

ESH

O R E

D R

IVE

P A R E D E S

L

IN

E

R O A D

P A L O

V E R D E

D R

IV

E

PALO ALTO

DRIVE

E A G

LE

D R

IV

E

SITE

EXIT

BATTLEFIELD

TRAIL

PAVILION

SITE

ENTRANCE

RESACA DE LA PALMA BATTELFIELD

PADRE

ISLAND

N.S.

TEXAS

SOUTH

ZAPATA

FALFURIAS

PORT

MANSFIELD

LAREDO

BEEVILLEGEORGE

WEST

RIO

GRANDE

GULF

OF

MEXICO

TEXAS

UNITED STATES

MEXICO

RIVER

PALO ALTO

BATTLEFIELD

N.H.P.

VICTORIA

RAYMONDVILLE

CORPUS

CHRISTI

KINGSVILLE

BROWNSVILLE

HARLINGEN

EDINBURG

McALLEN

MATAMOROS

SCALE OF MILES

25 0 25

FARM TO MARKET

511/550

P A R E D E S

L

IN

E

R O A D

S O U T H E R N

P A C

IF

IC

R A

IL

R O A D

(C O R D

V.C.

TO

BROWNSVILLE

TO LOS

FRESNOS

DEPARTMENT OF THE INTERIOR

UNITED STATES

NATIONAL PARK SERVICE

INTERMOUNTAIN REGION

INTERMOUNTAINSuperintendent Date

STATEREGION COUNTY

LOCATION WITHIN PARK

NAME OF PARK

TITLE OF PROJECT

PMIS/PKG NO.

SHEET

DRAWING NO.

Project Manager Date

RECOMMENDED:

APPROVED:

OF1

PALO ALTO BATTLEFIELD NATIONAL HISTORICAL PARK

CAMERON TEXAS11

/1

5/

0:

:3

A

MZ

:\I M

D E

C A

D D

\P R

O

JE

C T

S \P

A A

L\ P

A A

L

In st al l C on cr et e S id ew al k fo r

A cc es si bi lit y\ 7-

D ra w in gs \P

A A

L a nd

S id ew al k an d

T ra il.

rv t

PALO ALTO BATTLEFIELD NATIONAL HISTORICAL PARK

322319

190258

SKETCH PACKAGE

10/24/2023Noel R. Nemcik

PARK BOUNDARY

COUNTRY BOUNDARY

PAVED ROAD

UNPAVED ROAD

TRAIL

CREEK

WETLANDS

RAILROAD

VEGETATION

WATER

VISITOR CENTER

HEADQUARTERS

INFORMATION CENTER

PARKING

RESTROOMS

PICNIC AREA

RANGER STATION

230776

SHEET INDEX

G001 COVER SHEET AND INDEX

C201 SITE PLAN & DETAILS

THIS PROJECT

THE SCOPE OF THIS PROJECT IS TO REPLACE AN EXISTING

ASPHALT PORTION OF THE BROWNSVILLE HISTORIC BATTLEFIELD

HIKE AND BIKE TRAIL WITH A NEW CONCRETE TRAIL.

SCOPE OF WORK

REPLACE SURFACE OF HIKE AND BIKE TRAIL

SOUTHWEST CORNER

VEGETATION

P A

R A

D E

S L

IN

E

R O

A D

TX-550 FR

O N

TA

G E R

O A D

REPLACE EXISTING

ASPHALT PATH WITH

NEW CONCRETE

PATH, 8'-0" WIDE

NEW CONCRETE PATH TO START

AT EDGE OF BRICK PAVERS.

PALO ALTO

VISITOR

CENTER

EXISTING RED

BRICK PAVERS

START NEW CONCRETE PATH SOUTH

OF BOLLARD FOOTINGS

PARKING

LOT

PARKING

LOT

APPLY 4" WIDE SOLID STRIPE PAVEMENT

MARKING (METHYL METHACRYLATE

(MMA), WHITE) DOWN CENTER OF NEW

CONCRETE PATH

ADD DIRECTIONAL ARROWS

PAVEMENT MARKINGS TO

NEW CONCRETE PATH

VEGETATION

ADD DIRECTIONAL ARROWS

PAVEMENT MARKINGS TO NEW

CONCRETE PATH

GRADED AREA

2' - 0" 8' - 0"

GRADED AREA

2' - 0"

NOTE: EXPANSION JOINT ARE TO BE AT A MAXIMUM SPACING OF 60'-0"

O.C. AND COINCIDE WITH THE CONSTRUCTION JOINTS. TOOLED OR

SAWED CONSTRUCTION JOINTS ARE NOT ALLOWED.

17%

4" BEDDING

REINFORCEMENT

5" CONCRETE, PROVIDE CROSS

SLOPE FOR DRAINAGE

17%

1.5% MAX. CROSS-SLOPE

EQ 4" EQ

8' - 0"

E D

G E

O F

P A

T H

E D

G E

O F

P A

T H

DIRECTIONAL ARROWS AND LANE

STRIPING AT BOTH ENDS OF NEW

CONCRETE TRAIL, TO BE DURABLE

LIQUID PAVEMENT MARKINGS,

METHYL METHACRYLATE

(MMA),SKID RESISTANT, WHITE

PROVIDE ISOLATION JOINT AT

EACH END OF CONCRETE TRAIL

PER SCOPE OF WORK (SOW)

GENERAL NOTES

1. REFER TO STATEMENT OF WORK (SOW) FOR DESCRIPTION OF PROJECT

SCOPE. SKETCH DRAWINGS FOR GENERAL INFORMATION ONLY.

2. ALL WORK TO BE PERFORMED TO APPLICABLE BUILDING CODES AND ABAAS

REQUIREMENTS.

3. DO NOT SCALE DRAWINGS. CONTRACTOR TO FIELD-VERIFY ALL DIMENSIONS

AND EXISTING CONDITIONS.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING HIM OR

HERSELF WITH THE CONTRACT DOCUMENTS, VERIFYING FIELD CONDITIONS

AND DIMENSIONS, AND CONFIRMING THAT THE WORK MAY BE

ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING WITH CONSTRUCTION.

CONTRACTOR SHALL NOTIFY C.O. IN WRITING OF ANY DISCREPANCY WITHIN

THE CONTRACT DOCUMENTS AND REQUEST CLARIFICATION PRIOR TO

PROCEEDING WITH CONSTRUCTION.

5. SHOULD THERE BE ANY QUESTIONS CONCERNING THE CONTRACT

DOCUMENTS, EXISTING CONDITIONS, AND/OR DESIGN INTENT, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A CLARIFICATION

FROM THE C.O. PRIOR TO PROCEEDING WITH THE WORK, OR RELATED WORK

IN QUESTION.

6. STRIP TOPSOIL AND STOCKPILE FOR REPLACEMENT IN ALL AREAS OF

EXCAVATION AND DISTURBANCE, IF EXISTING.

7. ALL PEDESTRIAN FACILITIES TO BE CONSTRUCTED PER ALL RELEVANT ABA

ACCESSIBILITY STANDARDS REQUIREMENTS. THE CONTRACTOR SHALL

NOTIFY THE CO IMMEDIATELY OF ANY NON-COMPLIANCE ISSUES WITH ABA.

8. ALL TREES WITHIN AND ADJACENT TO CONSTRUCTION LIMITS TO REMAIN AND

MUST HAVE TREE PROTECTION. TREE PROTECTION TO EXTEND TO DRIPLINE

OF THE TREE CANOPIES WHERE POSSIBLE.

SUBSHEET NUMBERDESIGN:

APPROVAL:

DATE:

PMIS/PKG NO.

SHEET

OF

TECH REVIEW:

TITLE OF PROJECT

NAME OF PARK

TITLE OF SHEET

DRAWING NO.

/1

5/

0:

:3

A

MZ

:\I M

D E

C A

D D

\P R

O

JE

C T

S \P

A A

L\ P

A A

L

In st al l C on cr et e S id ew al k fo r

A cc es si bi lit y\ 7-

D ra w in gs \P

A A

L a nd

S id ew al k an d

T ra il.

rv t

C201

NRN

PALO ALTO BATTLEFIELD NATIONAL HISTORICAL PARK

322319

NIS

10/24/2023

SITE PLAN & DETAILS

190258

230776

1" = 50'-0"

SITE PLAN - HIKE AND BIKE TRAIL

1" = 1'-0"

HIKE AND BIKE TRAIL SECTION

1/2" = 1'-0"

TRAIL PAINTING PATTERN

REPLACE SURFACE OF HIKE AND BIKE TRAIL

File details come from the government source that posted it. Updated .