TONOPAH FIELD OFFICE ROOF REPLACEMENT
Solicitation number
140L3920Q0066
Issued by

View the file

Other files

File Type Posted
A04_SOW (updated)_Amd_0002.docx DOCX document
B09_Questions and Answers_Amd_0002.docx DOCX document
Sol_140L3920Q0066_Amd_0001.pdf PDF
B09_Tonopah FO Roof bid schedule (updated)_Amd_0002.xlsx XLSX spreadsheet
Sol_140L3920Q0066_Amd_0002.pdf PDF
Sol_140L3920Q0066.pdf PDF
A06_07540-Self-AdheredPVCRoofingSpec.docx DOCX document
A06_Specs and Drawings.pdf PDF
B03_Wage Determination.pdf PDF
A04_SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Estimate Detail

Project:Roofing Replacement (furnish and install new roofing materials)
Site:Tonopah FO, NV
Item No.DescriptionQty.UnitUnit CostTotal
1Mobilization/De-Mobilization1Lump Sum
2Documentation & Removal of Existing Lightning Protection System1Lump Sum
3Removal of Entire Existing Roof System (including but not limited to Parapet Wall Coping, Roof Membrane, Roof Cover Board, Roof Insulation, Standing Seam Metal Roof, and Roof Air Barrier)7500SF
4Removal of 25% of Existing 1/2" OSB Sheathing (if required)1875SF
5Installation of 1/2" CDX Plywood Sheathing where 25% of Existing OSB Sheathing was removed1875SF
6Installation 1/2" CDX Plywood Sheathing7500SF
7Installation of Air Barrier7500SF
8Installation of 2" Polyiso (2 layers required)1500SF
9Installation of 1/2" Fiberboard7500SF
10Installation of New Single Ply Self- Adhered PVC Roof Membrane7500SF
11Installation of Parapet Wall Flashing & Metal Drip Edge400LF
12Reinstallation of Lightning Protection System1Lump Sum

Furnish and Install New Roof Total

Tonopah FO Roofing Replacement