NIFC_Campus_PACS_Modernization_Service_-_QA_8-15-2022_0001.pdf
PDF 261 KB Posted
- Attached to
- NIFC CAMPUS PACS MODERNIZATION
- Solicitation number
- 140L3722R0022
About this file
This document contains questions and answers regarding a solicitation for campus physical access control system (PACS) modernization services at the National Interagency Fire Center in Boise, Idaho. The Bureau of Land Management is seeking to upgrade the existing PACS to meet Federal Identity, Credential, and Access Management standards at multiple buildings on campus. Key requirements include replacing outdated card readers with new HID IC-RPKCL-40 models, upgrading existing door hardware and software as needed, and reprogramming all doors to ensure full functionality of the new system. Bidders must be authorized AMAG vendors with ICAM-certified staff. Drawings of current reader locations and as-built diagrams are available to inform proposals, which must include a detailed schedule of values breaking down costs by building and scope of work. The incumbent contractor maintains the existing system under a separate PM contract.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
Fire and Aviation 3833 S Development Ave
Boise, Idaho 83705-5354
POST SITE VISIT Q&A No. 1 8/15/2022
NIFC Campus PACS Modernization Service Request For Proposal
No. QUESTION GOVERNMENT RESPONSE
1. Please provide additional information on the drawing package
The drawings include floorplans showing existing PACs hardware locations in each of the buildings.
2. Please confirm that the contractor is not providing workstations and servers.
Correct, see specifications paragraph 3.1.J.1
3. Is the current software FICAM? See specification paragraph 1.1.E for description of existing software.
4. Is the contractor required to provide reader licenses?
See specifications paragraph 2.1.A.1).
5. Is the current doors hardware FICAM ready to Level 2 Assurance?
Door hardware and furnishings are not part of this contract.
6. Do the existing doors need to be updated to the Level 2 Assurance?
The existing doors do not need to be replaced as part of this contract.
7. How many of the 127 readers need to be updated to Assurance Level 2?
See specifications paragraph 1.1.F)
8. Please confirm that the existing infrastructure meets FICAM compliancy?
It does not, it is the express purpose of the contract.
9. States Additional existing active system licenses. Which is it additional or active?
The intended meaning of the cited reference is these are the active licenses in addition to the base Symmetry software.
10. On the non FICAM ready doors do you want the HID Pam module installed?
See specifications paragraph 1.1.C.
11. Attachment 2 - Schedule of values, please define the subtitles and how you want the contractor to respond to each category?
Schedule of value form should result in detailed breakdown of improvements in each building. Identify quantity of units, price per unit and labor, resulting in the total cost of work for each area of work.
Units not requiring work in the building can receive a zero value.
12. Please define testing, what is the
Governments requirements for testing?
Complete functionality of all programming at each door.
i.e. 1. Functioning of each reader 2. timing of reader opening 3. proper door function.
13. Are the as built drawing required to be in pdf format?
See specification paragraph 1.4.E.1).II
14. Are CAD Drawings required? No
15. Please confirm that we can use
Attachment 1 for drawing submittal?
Yes
16. Do you want the contractor to confirm wire routing for each reader?
Yes, see specification paragraph 1.4.E.1).II.a
17. Is wire routing required for existing readers?
Conduits and wiring pathways are available for all wire routing.
18. Please confirm that wiring should be RS485 not weigand for FICAM compliancy?
Wiring as specified by manufacturer, see specification section 2.1.A.6).I.a)
19. We respectfully request an extension to the due date, due to the size of the extent of the proposal requirements, to include:
technical knowledge and requirements?
See Amendment for new bid closing date.
20. Can DOI confirm that the responding team has to be an AMAG VAR and have corresponding technicians certified to work on AMAG products when performing the upgrade/installation?
See specification paragraph 1.3.A.
21. We recommend that there are ICAM CSEIP certified staff as part of the proposed team to be able to assist with any troubleshooting and major issues with deployed equipment.
Registry of Certified System Engineer ICAM PACS (CSEIP) – Secure Technology Alliance (securetechalliance.org)
See specification paragraph 1.3.A.
22. Is there an existing integrator currently maintaining and servicing all of the systems identified in the SOW? If so, please provide the name of the incumbent.
We have a PM contract in place with Digitronics but maintenance and service is performed in house or with varied AMAG vendors.
23. Is the government responsible for electrified hardware?
Yes, government is responsible for electrified door furnishings.
24. What version of the software is currently running for the AMAG system in place? Is it up to date?
See specification paragraph 1.1.E.
25. Will there be a need for additional card reader licenses?
See specification paragraph 1.1.E.1)
26. There are currently 3 clients, are you looking to add another client license?
No
27. Can the government provide drawings in DWG format?
No
28. In the specs, the reader model is HID IC- RKCL-40. Previous projects at NIFC, have required the IC-RPKCL-40 Model. Can the government please verify the desired part number for clarification purposes?
Existing card reader part number: IC-RPKCL-
See Addendum 1.
29. Does the campus currently have a PIV badging system in place?
Yes, existing PACS uses PIV badges obtained through GSA badging process.
30. What is the total PIV population identified for the campus? What is the user population blend (i.e. will non DOI PIV card holders be enrolled in the system)?
Total population isn’t relevant to this contract but yes there is a mix of DOI, USDA, DOC, and DoD personnel assigned and enrolled.
31. Is the site aware of the transition to the version 8.1 USAccess PIV credential and associated impacts (i.e. do any current users have the 8.1 credential)?
Yes we are aware and there are v8.1 cards in use along with v7 cards.
32.