B08 Prebid Box Elder Questions and Answers_0002.pdf
PDF 177 KB Posted
- Attached to
- Box Elder Site Improvement
- Solicitation number
- 140L1721Q0003
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior Bureau of Land Management
Box Elder Recreation Site Improvements
Pre-Bid Questions and Answers https://beta.sam.gov/ Notice ID: 140L1721Q0003
Q: What are the requirements for the relocated fire rings?
A: The foundation of the relocated fire rings shall be the same as the foundation for the new fire ring, shown on sheet 5. Gravel shall be placed around the relocated fire rings as shown on sheet 5.
Q: Can organic woody material, logs, clearing slash, and clearing debris be chipped on site?
A: Yes, material may be chipped instead of hauled off site. Chipped material shall be spread such that the maximum chipped material thickness is 2 inches.
Q: What are the specs on the site number identification signs?
A: See section 12 93 00, paragraph 2.3.
Q: I would like to clarify the type of Gate that is being requested. Can I get the specifications on the gate needing to be built?
A: The gate is shown on the plans, sheets 6 & 7, and specifications section 05 50 12.
Q: We are looking over the specs and I did not see a vendor for the gate. I was wondering If you had some suggestions for the gate or is it one that needs to be built??
A: The gate is not available from a specific vendor, it will need to be built. Gate requirements are shown on the plans, sheets 6 & 7, and specifications section 05 50 12.
https://beta.sam.gov/
File details come from the government source that posted it. Updated .