B09_A1_21R0037_At5_QAs_8-16_0001.pdf

PDF 138 KB Posted

Attached to
Haekel Road Double Chip Seal
Solicitation number
140L0621R0037
Issued by

About this file

This document contains questions and answers regarding solicitation number 140L0621R0037 for the Haekel Road Double Chip Seal project. The Bureau of Land Management will issue a Notice to Proceed in spring 2022 once temperatures are adequate to complete the project per specifications. The questions and answers indicate that pulverizing material in place and compacting to a minimum of 95% will be sufficient to complete the work, as opposed to removing and replacing unsuitable material or adding crushed aggregate. No other project details are provided in this document.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

National Operations Center

Denver Federal Center, Building 50 P. O. Box 25047

Denver, CO 80225-0047

140L0621R0037 Haekel Road Double Chip Sealing

Amendment 1 – Q&As #1

1) Q: Per Section 304.01 it states that we are to add crushed aggregate if required. Since this will not be known until the work is started how are we to quote "if" required and how much will be needed?

A: This will not be required as there is enough material to pulverize in place.

Contractor to pulverize in place and get compaction to at minimum 95%.

2) Q: Section 304.03 states that it is necessary to remove and dispose of unsuitable material as directed by the government. Then to replace with crushed aggregate. This work is to be accomplished before the pulverizing process. What and how much area do you anticipate having to do this on?

A: This will not be required as there is enough material to pulverize in place.

Contractor to pulverize in place and get compaction to at minimum 95%.

3) Q: When can construction start?

A: Construction will begin once the Notice to Proceed is issued to contractor. There are certain temperature requirements stated in the specifications to complete the project. With those temperature requirements, work cannot start until the Spring of 2022. Spring brings high enough temperatures and once temperatures are adequate to complete the project per specifications, the Notice to Proceed will be issued.