Sol_140FS323Q0254_Amd_0001.pdf

PDF 127 KB Posted

Attached to
Moving Services, RO Atlanta, GA
Solicitation number
140FS323Q0254
Issued by

About this file

This document contains questions and answers regarding a solicitation for moving services for the Department of the Interior Fish and Wildlife Service Regional Office in Atlanta, GA. The solicitation requires relocation of furniture from the fourth to third floor of the building, including disassembly and disposal of a vertical filing carousel. Offerors are permitted an on-site survey between October 2nd and 13th to gather details. Pricing should be structured based on the quote schedule using hourly rates or unit prices for tasks such as disassembly, transport, and disposal. A final list of items for disposal will be provided after award. The government will provide exclusive use of the freight elevator and coordinate dumpster placement and loading dock access. Approximately 200 plastic totes will be needed for the move. The period of performance is October 23rd to November 30th, 2023.

View the file

Other files

File Type Posted
Sol_140FS323Q0254_Amd_0004.pdf PDF
Sol_140FS323Q0254_Amd_0003.pdf PDF
Attachment_3-_Past_Performance-rev1_0002.docx DOCX document
Sol_140FS323Q0254_Amd_0002.pdf PDF
Attachment_3-_Past_Performance_Data.docx DOCX document
Attachment_1-_Performance_Work_Statement.pdf PDF
Sol_140FS323Q0254.pdf PDF
Attachment_2-_Quote_Schedule.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140FS323Q0254

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

FS3

Falls Church VA 22041 5275 Leesburg Pike FWS SAT Team 3 FWS SAT Team 3

09/20/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/20/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0001 is issued to address concerns posed from industry. Closing remains 16

October 2023.

All other terms and conditions remain unchanged.

GA Regional Director's Office - Moving Services

Tech POC: Mara Lopez (404) 679-4062

Alt POC: Lawrence (James) Dubiel 404-679-7316

Contract POC: Fred Riley, Fred_riley@fws.gov

Period of Performance: 10/23/2023 to 11/30/2023

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Fred Riley

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Questions and Answers

Question 1: Timeframe and Downtime: The statement of work stipulates that the job is scheduled between mid-October and the end of November, with a downtime limit of two weeks. To ensure complete clarity, could you kindly specify whether this two-week period pertains to the entire move or if it is specific to certain portions of the project?

Answer 1: We expect the job to be completed within a two-week timeframe.

Question 2: Equipment Allocation: I would appreciate it if you could provide a breakdown of the equipment that is designated for transport to the third floor. My understanding is that items highlighted in yellow on the inventory list are intended for relocation to the third floor. Please confirm if this interpretation is accurate.

Answer 2: The furniture to be relocated from the 4th to the 3rd floor is identified in the PWS.

See ADDENDUM A: Move / Excess Property Inventory and ADDENDUM B: 4th Floor Furniture Plan. Items are highlighted in yellow on both addendums.

Question 3: Pricing Structure: Does FWS have a preference regarding the pricing structure for the quote? Would you prefer an hourly rate or a flat rate for the entirety of the job?

Answer 3: Offerors should structure quotes based on the quote schedule. See ADDENDUM D: Quote Schedule. Offerors should provide a price per hour or unit for each task itemized on the schedule. Some units have been provided. Others should be estimated based on the evaluation of the job. The government will pay hourly rates based on the time it takes to complete the job. Offerors should indicate minimums if they apply.

Question 4: On-Site Survey: Are we permitted to coordinate an on-site survey before finalizing our bid?

This would enable us to gather precise details and optimize our proposal accordingly.

Answer 4: Yes, site visits may be scheduled between October 2nd and October 13th and should be coordinated with the onsite Facility Management Specialist, James Dubiel. In the event of a government shutdown, offerors should be prepared for the scheduled to be pushed back.

Question 5: Previous Contracts: Has FWS previously contracted a job of similar scope? If so, are there any specific considerations or unique factors that we should take into account when preparing our bid?

Answer 5: No, the only unique consideration would be the disassembly and disposal of the vertical filing carousel.

Question 6: Is any of the product being kept in the warehouse behind the building? If so, how many stations do you want held back? If not, we will plan on a full disposal?

Answer 6: -Only 5-10 workstations will be moved to the warehouse.

-Pricing should be submitted per unit (i.e., hour or piece). Our disposal process is currently underway.

Several field offices and other federal agencies have expressed an interest in our furniture and arrangements will be made to pick up those items at their expense. A final list of items for disposal will be made available post award. The government will pay for number of items disassembled and/or hours expended.

Question 7: Can we place a dumpster in the back parking lot?

Answer 7: Yes, we can place a dumpster in the back lot. Location TBD by building management company.

Question 8: Will we have uninterrupted access to the loading dock?

Answer 8: We will coordinate access and use of the loading dock with the building management company so that move activities can be completed without interruption.

Question 9: Will we be able to have uninterrupted access to one of the elevators?

Answer 9: There are two elevators. One is a freight elevator and is the only elevator that can be outfitted with protective padding and used to move furniture. The use of the freight elevator will be coordinated with the building management company and will be exclusively available during the scheduled move.

Question 10: Are chairs being disposed of as well?

Answer 10: Possibly. A final list of items for disposal will be made available post award.

Question 11: Are there elevators to move these items? Do you know how many packing containers are needed?

Answer 11: Please review Addendum D of the PWS, "Quote Schedule." We estimate a need for 200 plastic, reusable totes/crates.