This document outlines the projected submittal list for a solicitation to renovate the electrical system at the Four-Stall Garage building of the DC Booth Historic National Fish Hatchery. The solicitation will require installation of a new electrical supply, panel, and circuits to support the garage. Submittals will include shop drawings, manufacturer cut sheets, test results, certifications, samples, and operation and maintenance manuals. The schedule of values, subcontractor list, and construction schedule will also be submitted. The contracting agency is the Department of the Interior Fish and Wildlife Service. Review and approval codes are defined for each submittal. Upon approval as submitted or with minor comments not requiring resubmission, the contractor will incorporate submittals into the final project.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET 1 OF 3
PROJECT NAME: 4 Stall Garage Electrical Renovation ENGR. PROJECT NO.: 24-005 LOCATION: DC Booth National Fish Hatchery CONTRACT NO.:
CONTRACTOR:
PWS
Section Number
Spec.
Paragraph No. Comments
012900 1.2.A.1 013100 1.3 013200 1.4 013233 1.2 013300 1.3 014000 1.4 015000 1.3 017419 1.3 017419 1.4 017700 1.3 017823 1.2 260500 1.3 262416 1.03
Waste records Closeout documents O&M Manual Maintenace Manuals Electrical Panel Product Data
Digital photos Submittal schedule Test agency information Erosion control plan Waste management plan
PROJECTED SUBMITTAL LIST
Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)
Schedule of Values Subcontract list and information Construction schedule
A - Approved as Submitted.
B - Approved, Except as Noted. No Resubmission Required.
C - Approved, Except as Noted. Resubmission Required.
D - No Action Taken. See Comments. Resubmission Required.
E - disapproved. See Comments. Resubmission Required.
SHEET 2 OF 3
LOCATION: DC Booth National Fish Hatchery CONTRACT NO.:
CONTRACTOR:
PWS
Section Number
Spec.
Paragraph No. Comments
PROJECTED SUBMITTAL LIST
Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)
A - Approved as Submitted.
B - Approved, Except as Noted. No Resubmission Required.
C - Approved, Except as Noted. Resubmission Required.
SHEET 3 OF 3
LOCATION: DC Booth National Fish Hatchery CONTRACT NO.:
CONTRACTOR:
PWS
Section Number
Spec.
Paragraph No. Comments
PROJECTED SUBMITTAL LIST
Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)
A - Approved as Submitted.
B - Approved, Except as Noted. No Resubmission Required.
C - Approved, Except as Noted. Resubmission Required.