About this file

This document contains responses to contractor questions regarding solicitation number 140F0421R0010 for construction services to renovate the Creative Resources building and West Pond areas at the National Conservation Training Center in Shepherdstown, West Virginia. The solicitation is for general construction work including demolition of some walls, casework and countertops; installation of new windows and doors; replacement of flooring and finishes; and construction of new interior rooms including steel framing and drywall for a hip roof. Responses provide clarification on the scope of demolition and new construction work, material specifications, requirements for disposal of materials and lighting fixtures, and contact information for the building management system provider.

View the file

Other files for this federal contract opportunity

Other files attached to WV-NCTC RENOVATE CREATIVE RESOURCES AND, newest first.
File Type Posted
AttachmentVIII-Request for Information (RFI)040192021_0004.pdf PDF
Sol_140F0421R0010_Amd_0004.pdf PDF
Sol_140F0421R0010_Amd_0003.pdf PDF
Attachment-VII RFI.docx04122021_0003.pdf PDF
Sol_140F0421R0010_Amd_0002.pdf PDF
Attachment III- Revised Statement of Work _0001.pdf PDF
Sol_140F0421R0010_Amd_0001.pdf PDF
Attachment IV-DOL Wage Determination.pdf PDF
Attachment II-Drawings-Specifications.pdf PDF
Attachment III-Statement of Work.pdf PDF
Attachment I-Solicitation Documents140F0421R0010.pdf PDF
Sol_140F0421R0010.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140F0421R0010 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

F04

Atlanta GA 30345-3319

1875 CENTURY BOULEVARD, SUITE 310

DIV OF CONT & GRANT SVCS

F04

Atlanta GA 30345-3310

SUITE 310

1875 CENTURY BOULEVARD

FWS, DIVISION OF CONTRACTING AND GR

03/22/20210002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/22/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

National Conservation Training Center (NCTC)

698 Conservation Way

Shepherdstown, WV 25443-4024

Jefferson County

Solicitation No: 140F0421R0010

Project Title: Renovate areas within the Creative Resources building first and ground floors, and West Pond

The purpose of Amendment No. 0002 is to incorporate prospective offeror(s) Request for

Information(RFIs)responses.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Rachel Williams

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0421R0010/0002

All solicitation terms and conditions remain unchanged.

Legacy Doc #: FWS

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SOLICITATION NO: 140F0421R0010

RENOVATE CREATIVE RESOURCES & WEST POND

REQUEST FOR INFORMATION -RFI

QUESTIONS ANSWERS

Q1: Reviewing this project I see on sheet A 101 in the notes to remove the countertops and A104 shows 3 possibly a 4th countertop noted DM1. Please confirm if these are the countertops to be replaced.

A1: Only 3 countertops/cabinets marked for demo DM1 on drawing set. 3 Countertop/Cabinets to be disposed of and not replaced. Oak moldings to be salvaged for possible reuse on this project

Q2: The finish schedule on A 601 does not indicate the material for the countertops, please confirm.

A2: Demo only, not to be reinstalled.

Q3: I did view the Spec file (section 6) and didn't see mention of the countertops.

A3: Demo only, not to be reinstalled.

1: Various rooms including 134-137 have an existing cloth bulletin board type finish on some walls that is not addressed. Clarification is needed as to demo, and or finish of these walls because changing wall layouts will leave unsightly voids, and gaps in fabric.

• A: Using care not to damage walls, remove fabric covering on walls called for demo inside office areas. Skim with gypsum patching compound, and finish using schedule type paint and color.

2: There is high elevation area where a lift or scaffolding will be necessary. What is the load carrying capability of floors?

• A: 200psf in the library section of Creative Resources

• 20psf in the cubicle area

• 50psf in office areas.

3: Dumpster placement and, is metal recycling required

• A: Unless otherwise noted for reinstallation, all removed items are property of the contractor for disposal offsite. Dumpster can be placed behind the facility.

4: Who is responsible for old florescent light bulb refuse as they are normally an issue?

• A: Unless otherwise noted for reinstallation, fixtures shall be disposed of complete, to include bulbs, ballasts and wiring, in accordance with all applicable state and federal guidelines.

5: Who is responsible for figure 8 door lock cores?

• A: If new requirement, contractor to provide ‘factory’ lockset with blank core for rekeying by NCTC staff. Existing to be reused where applicable.

6: On the demo plans (A-101), there are notes about removing the rolling shelves, and casework/countertops from Room 133. But there are no call-outs on the floor plan itself. Are these items getting demoed?

• A: No. Shelves and casework stay in Room 133. Room 133 work was removed except for any of the south wall included in the A101-A103 work.

7: When I go to the new work plan (A-102), there are notes about patching concrete to prep for new flooring and about patching drywall where casework was removed, but again, no call-outs on the floor plan itself. Here was where I got concerned that maybe all of that stuff doesn't get demoed, and now the existing work remains as-is. Assuming it gets demoed, then I assume we need to follow these notes?

• A: As with above, only casework to be removed is on A104 in Room 104, DM 1.

Carpet to be removed and replaced as a whole in that room. .

8: I reviewed the finish schedule on A-601, and Room 133 isn't even called out to reference whether or not any existing finishes are removed and replaced.

Can you get back to me on this, and let me know if we're demoing and therefore doing the new work as well. And if we are doing this work, what is the flooring and base in Room 133?

• A: As referenced in 1) no work in room 133 except for any finish replacement required on the south wall with any work in Rooms 134, 135, 136 137 and 138.

9: Also, for Area 1 work, on the finish schedule, it's showing rooms 103 & 130 are getting painted, with new flooring, base, and ACT. But nothing on the new plans or demo plans indicate this. Can you please clarify if these rooms are getting any work?

• A: Room 130 and 103 finishes are any necessary when cutting windows into existing walls, and to match existing. If the work is done gently, repaint of those walls/rooms would be minimal if any. No ATC to be replaced in those areas unless damaged by work in adjacent spaces.

10: A lot of the finish schedule doesn't make sense with the floor plans. On the demo floor plan, we're removing floor and base from Room 108, but this room isn't on the finish schedule. But then rooms like 109 where we're doing no work other than cutting in a window (according to the floor plans), this room is on the finish schedule showing paint, flooring, etc.

• A: Only work in rooms 108, 109, 111 is installation of windows and any refinishing necessary for completion of that task. No flooring or wall base removal/replacement necessary.

11: Similar to question above, we're doing work in Room 104 and the new rooms 104A & 105B, but none of these rooms are on the finish schedule.

• A: Room 104 gets new carpet to match finish material legend A601. All new finishes will match existing, except for CPT1, which is specified on A601.

12: The interior roof structure that is shown over Rooms 104A & 104B, this is all new construction, correct? There's a section view on A-501. If this is new, what is the roofing material? What is the ceiling in these rooms? The section view appears to show a hard lid ceiling on metal framing possibly.

• A: New rooms 104A and 104B are 2x2 ACT, with a hard deck hip roof of steel studding and GWB above. My scale shows 10’ at door with approx. 13’ at wall, but field verification and ‘buildability’ rules apply.

13: In Addendum 04, question 7; the questions asks about the roof and the ceiling. The answer only addresses the ceiling and does not address the roof. If the roof is new, can you provide any information on what is required? Without an answer, our proposal assumes the roof is existing and will not require any new work.

• A: NEW rooms, new ceiling, and new roof above. Construct new steel stud framed GWB hip roof at 2:12 pitch to existing wall. Finish, prime and paint to match existing walls.

14: There are two Door Schedules (DWG A107 and A601).

DWG A107 calls out Door Hardware 04 and says see DWG A601. A601 does not provide information on Hardware #04. Can you indicated the hardware required for Doors 105N-A and 105N-B? If this cannot be answered before the bid, our proposal will use Hardware #1 for these doors.

DWG A601 has a door schedule but the column for Door Hardware is blank. Can you provide the door hardware information for each door listed on DWG A601? If this cannot be answered before the bid, our proposal will use Hardware #1 for these doors.

• A: Use Hardware Group #1 for all new doors. Existing and relocated doors to reuse current hardware. Falcon 7 pin IC, keyway “A” Blank cylinder to be supplied, our maintenance contractor will have them keyed.

16: DWG M103 calls to relocate thermostats. Are these thermostats connected to a BMS? If so, can you provide the current BMS company? If this cannot be answered prior to bid, our proposal will exclude any BMW work.

• A: Thermostats are a plug in jack style, changes shouldn’t require reprogramming, so your electrician or HVAC sub can do that work. Unplug, move cable, plug it in. New work we can be installed any qualified HVAC or electrician and EASI Controls for any programming changes if necessary. EASI can be contacted at: http://easicontrols.com/w/ Chris Zissimos is our contact.

c.zissimos@easicontrols.com http://easicontrols.com/w/ mailto:c.zissimos@easicontrols.com

B09-Solicitation Amendment 0002 140F0421R0010
RFIs
RFI 2PWC Company
CR-WP RFI

File details come from the government source that posted it. Updated .