SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
FWS, DIVISION OF CONTRACTING AND GE
EASTSIDE FEDERAL COMPLEX
911 NE 11TH AVENUE
PORTLAND OR 97232-4181
F01
Aaron Eubank 5032312101
1x 04/12/2018
140F0118Q0037
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Attachment 2: Performance Work Statement
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
0 0 calendar days and complete it within ________________ ________________ calendar days after receiving
05/14/2018
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
FWS, DIVISION OF CONTRACTING AND GE
EASTSIDE FEDERAL COMPLEX
911 NE 11TH AVENUE
PORTLAND OR 97232-4181
F01
Wendy Duval
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 41
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140F0118Q0037
IDIQ for Heavy Equipment Operation for Habitat
Rest. & Land Mgmt Activities.
Willapa National Wildlife Refuge Complex
Vendor DUNS #______________________
Vendor POC Email __________________
Vendor POC Phone # ________________
Contracting POC: Aaron Eubank, 503-231-2101, aaron_eubank@fws.gov
Delivery Location Code: 0008349252
FWS WILLAPA NWR
3888 SR 101
ILWACO WA 98624-9707 US
FOB: Destination
00010 Heavy Equipment Operation for Habitat Rest. &
Land Mgmt. Activities - See Pricing Schedule for full list of Equipment Required and to submit pricing.
Period of Performance: 05/25/2018 to 05/25/2023
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 4 of 41
Section Title
Part I—The Schedule
A Solicitation/contract form
B Pricing schedule
C Specifications/Drawings
D Packaging and marking
E Inspection and acceptance
F Deliveries or performance
G Contract administration data
H Special contract requirements
Part II—Contract Clauses
I Contract clauses
Part III—List of Documents, Exhibits, and Other Attachments
J List of attachments
Part IV—Representations and Instructions
K Representations, certifications, and other statements of offerors
L Instructions, conditions, and notices to offerors
M Evaluation factors for award
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 5 of 41
SECTION B – PRICING SCHEDULE
This requirement is for a Multiple Award Indefinite Delivery, Indefinite Quantity (IDIQ) Construction contract Equipment Operation for Habitat Restoration and Land Mangement Services at Willapa NWR Complex, Ilwaco, WA. The IDIQ contract is for five (5) years.
The maximum value of this contract is a shared capacity of $1,500,000 over all years of the contract.
The minimum guarantee is $500.00 that will satisfy the minimum guaranteed quantity to be ordered on this contract, over all years. The minimum guarantee may be satisfied by one task order or the cumulative value of multiple task orders and/or modifications.
This contract is open to the U.S. Fish and Wildlife Service for task orders at the Willapa National Wildlife Refuge Complex only. Section G addresses ordering authority and procedures for issuance and administration of task orders.
Pricing Schedule is attached with this document.
PERFORMANCE PERIOD: See Section F
THIS SOLICITATION IS A TOTAL SMALL BUSINESS SET ASIDE using procedures in FAR part 15.
(End of Section B)
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 6 of 41
SECTION C –SPECIFICATIONS/DRAWINGS
Performance Work Statement attached with this document (See section J for list of attachments).
(End of Section C)
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 7 of 41
SECTION D – PACKAGING AND MARKING
Section Does Not Apply
(End of Section D)
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 8 of 41
SECTION E – INSPECTION AND ACCEPTANCE
The following clauses are incorporated by reference:
52.246-12 INSPECTION OF CONSTRUCTION AUG 1996
(End of Section E)
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 9 of 41
SECTION F – DELIVERIES OR PERFORMANCE
F.1.0 PERIOD OF PERFORMANCE
The contract shall commence from date of award for a period of 5 years. Performance periods for task orders will be specifically designated in the individual task orders.
F.2.0 PROGRESS PLAN
At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.
(End of Section F)
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 10 of 41
SECTION G – CONTRACT ADMINISTRATION DATA
G.1.0 ORDERING AUTHORITY/INSTRUCTIONS
This contract is open to the agency stated in Section B. Ordering activities shall follow the procedures of this section when placing an order against this contract. All orders shall comply with the terms and conditions set forth in the contract. The ordering contracting officer is responsible for ensuring all necessary protocols and coordination, as well as proper procuring, administering and terminating warrant authorities, are in place for the issuance, administration and closeout of a task order.
G.1.1 All task orders shall include a Statement of Work or Performance Work Statement that includes a description of work to be performed, location of work, period of performance, deliverable schedule, applicable performance standards, and any special requirements. To the maximum extent practicable, the agency requirements shall be performance-based statements.
G.1.2 In accordance with FAR 16.505(b)(1) Fair Opportunity will be provided to each awardee on orders exceeding $3,500. If the order is below the Simplified Acquisition Threshold (SAT), price lists will be consulted to determine the contract holder that will provide the services at the best prices. Contract holders may be contacted to provide quotes and potential volume discounts on their price lists for any of these task orders. If one contractor cannot be clearly be determined to have the lowest prices for the equipment required, contract holders will be contacted to provide quotes. For orders in excess of the SAT, all IDIQ contract holders will be contacted to submit quotes.
G.1.3 The ordering contracting officer shall document price reasonableness and any other required justifications prior to award, to include contract action reporting in the Federal Procurement Data System – Next Generation (FPDS-NG) system.
G.1.4 The ordering contracting officer is responsible for payment and disbursement, to include disputes and claims.
G.1.5 The ordering contracting officer is responsible for maintaining the task order file and file disposition.
G.1.6 The ordering contracting officer shall report any litigation, illegal activity, or any other serious criminal or civil matters that arise in the performance of the task order, immediately to the IDIQ Contracting Officer.
G.2.0 In accordance with FAR clause 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts, the Contractor is required to annually report the product types and dollar value of any USDA-designated biobased products purchased during the previous fiscal year (October 1- September 30) through the System for Award Management (SAM). The report is due no later than October 31 of each year during contract performance and at the end of contract performance. Failure to submit the report into SAM in a timely manner may result in contractual remedies.
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS
MAY 2014
52.232-17 INTEREST MAY 2014
52.232-23 ASSIGNMENT OF CLAIMS MAY 2014
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS MAY 2014
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM
FOR AWARD MANAGEMENT
JUL 2013
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL
BUSINESS CONTRACTORS
DEC 2013
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 11 of 41
The following local clauses are provided in full text:
CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)
(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.
(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.
(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at http://www.cpars.csd.disa.milJ. The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.
(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at http://www.cpars.csd.disa.mil/. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.
(f) The following guidelines apply concerning your use of the past performance evaluation:
(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.
(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
http://www.cpars.csd.disa.milj/ http://www.cpars.csd.disa.mil/
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 12 of 41
(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.
(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.
(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
(End of Local Clause)
52.232-70 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING
PLATFORM (IPP) (APR 2013)
Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform System (IPP).
“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice
1. Invoice billed according to contract line items and rates.
2. Certified payrolls and Statement of Compliance in accordance with clause 52.222-8.
3. If partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.
4. If final payment is billed, the last invoice shall state “FINAL”.
5. Contractor’s Release of Claims shall be submitted with the final invoice.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
(End of Section G) https://www.ipp.gov/ mailto:ippgroup@bos.frb.org
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 13 of 41
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1.0 WORK HOURS
Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.
H.2.0 ENVIRONMENTAL INTERRUPTION OF WORK
H.2.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for all environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.
H.2.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, are discovered to be present in or adjacent to the project area.
H.3.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
H.3.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.
H.3.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.
H.3.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.
H.3.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
H.4.0 SUBSTITUTION – PROCESSION OF WORK
Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials included in the quotation are hereby incorporated into the contract. Performance shall be limited to the personnel, qualifications, firms, procedures, and materials that were specifically identified in the quotation accepted. The Contractor shall obtain the Contracting Officer’s written consent before making any substitutions or changes. All substitutions or replacements shall comply with the terms and conditions of the contract.
H.5.0 ENVIRONMENTAL IMPACT
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 14 of 41 accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);
the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
H.6.0 HAZARDOUS MATERIALS
Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.
Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR
1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
H.7.0 GREEN PROCUREMENT REQUIREMENTS
In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:
• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.
• USDA Biobased product listings published at www.biopreferred.gov.
• Energy Star® product listings published at www.energystar.gov/products.
• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories
Contractor shall comply with all reporting requirements stated in the applicable clause(s):
• 52.223-1 Biobased Product Certification
• 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts
• 52.223-4 Recovered Material Certification
• 52.223-17 Affirmative Procurement of EPA Designated Items in Service and Construction Contracts
H.8.0 UNAUTHORIZED PERSONNEL
The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is http://www.epa.gov/cpg/products.htm http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories http://energy.gov/eere/femp/covered-product-categories
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 15 of 41 prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
H.9.0 DAVIS-BACON WAGE RATES APPLICABLE TO TRUCK DRIVERS
29 CFR 5.2(j) limits coverage of construction contractor or subcontractor employees performing as truck drivers under the Davis-Bacon Act (FAR 52.222-6) to only their time spent directly upon the "site of the work" or when hauling between the site of the work and a facility which is dedicated to and located in the proximity of the actual construction location. Other transportation of materials or supplies to or from the site of work by employees of the construction contractor or subcontractor is not “construction” at the site of work and accordingly is not subject to the Davis-Bacon Act.
H.10.0 FIRE DANGER SEASON
If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR and outlined in the attachment at the end of this section.
(End of Section H)
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 16 of 41
SECTION I – CONTRACT CLAUSES
Clause Title Date
52.202-1 DEFINITIONS NOV 2013
52.203-3 GRATUITIES APR 1984
52.203-5 COVENANT AGAINST CONTINGENT FEES MAY 2014
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE
GOVERNMENT
SEP 2006
52.203-7 ANTI-KICKBACK PROCEDURES MAY 2014
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS
FOR ILLEGAL OR IMPROPER ACTIVITY
MAY 2014
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER
ACTIVITY
MAY 2014
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS
OCT 2010
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND
REQUIREMENT TO INFORM EMPLOYEES OF
WHISTLEBLOWER RIGHTS
APR 2014
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POST CONSUMER
FIBER CONTENT PAPER
MAY 2011
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS
OCT 2016
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2016
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED,
SUSPENDED, OR PROPOSED FOR DEBARMENT
OCT 2015
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION
REGARDING RESPONSIBILITY MATTERS [Will be included if 52.209-7 is checked “has”]
JUL 2013
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED
DOMESTIC CORPORATIONS
NOV 2015
52.211-13 TIME EXTENSIONS SEPT 2000
52.215-2 AUDIT AND RECORDS – NEGOTIATION OCT 2010
52.215-8 ORDER OF PRECEDENCE – UNIFORM CONTRACT FORMAT OCT 1997
52.215-21 REQUIREMENTS FOR COST OR PRICING DATA OTHER
THAN CERTIFIED COST OR PRICING DATA –
MODIFICATIONS
OCT 2010
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE NOV 2011
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS NOV 2016
52.219-14 LIMITATIONS ON SUBCONTRACTING JAN 2017
52.219-28 POST AWARD SMALL BUSINESS REREPRESENTATION JUL 2013
52.222-3 CONVICT LABOR JUNE 2003
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS –
OVERTIME COMPENSATION
MAY 2014
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS MAY 2014
52.222-7 WITHHOLDING OF FUNDS MAY 2014
52.222-8 PAYROLLS AND BASIC RECORDS MAY 2014
52.222-9 APPRENTICES AND TRAINEES JULY 2005
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS FEB 1988
52.222-11 SUBCONTRACTS (LABOR STANDARDS) MAY 2014
52.222-12 CONTRACT TERMINATION-DEBARMENT MAY 2014
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE MAY 2014
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 17 of 41
REQUIREMENTS AND RELATED REGULATIONS
52.222-14 DISPUTES CONCERNING LABOR STANDARDS FEB 1988
52.222-15 CERTIFICATION OF ELIGIBILITY MAY 2014
52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR 2015
52.222-26 EQUAL OPPORTUNITY SEPT 2016
52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR
CONSTRUCTION
APR 2015
52.222-32 CONSTRUCTION WAGE RATE REQUIREMENTS – PRICE
ADJUSTMENT (ACTUAL METHOD)
JAN 2017
52.222-35 EQUAL OPPORTUNITY FOR VETERANS OCT 2015
52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES JUL 2014
52.222-37 EMPLOYMENT REPORTS ON VETERANS FEB 2016
52.222-40 NOTICE OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT
DEC 2010
52.222-50 COMBATING TRAFFICKING IN PERSONS MAR 2015
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION OCT 2015
52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 DEC 2015
52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS
UNDER SERVICE AND CONSTRUCTION CONTRACTS
SEPT 2013
52.223-6 DRUG-FREE WORKPLACE MAY 2001
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT
MESSAGING WHILE DRIVING
AUG 2011
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES JUNE 2008
52.227-1 AUTHORIZATION AND CONSENT DEC 2007
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND
COPYRIGHT INFRINGEMENT
DEC 2007
52.227-4 PATENT INDEMNITY -- CONSTRUCTION CONTRACTS DEC 2007
52.227-17 RIGHTS IN DATA - SPECIAL WORKS DEC 2007
52.228-2 ADDITIONAL BOND SECURITY OCT 1997
52.228-11 PLEDGES OF ASSETS JAN 2012
52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS MAY 2014
52.228-14 IRREVOCABLE LETTER OF CREDIT NOV 2014
52.229-3 FEDERAL, STATE, AND LOCAL TAXES FEB 2013
52.233-1 DISPUTES MAY 2014
52.233-1 DISPUTES – ALTERNATE I DEC 1991
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT 2004
52.236-2 DIFFERING SITE CONDITIONS APR 1984
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE
WORK
APR 1984
52.236-5 MATERIAL AND WORKMANSHIP APR 1984
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR APR 1984
52.236-7 PERMITS AND RESPONSIBILITIES NOV 1991
52.236-8 OTHER CONTRACTS APR 1984
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,
EQUIPMENT, UTILITIES, AND IMPROVEMENTS
APR 1984
52.236-10 OPERATIONS AND STORAGE AREAS APR 1984
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION APR 1984
52.236-12 CLEANING UP APR 1984
52.236-13 ACCIDENT PREVENTION NOV 1991
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS APR 1984
52.236-17 LAYOUT OF WORK APR 1984
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION FEB 1997
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 18 of 41
52.236-26 PRECONSTRUCTION CONFERENCE FEB 1995
52.242-13 BANKRUPTCY JUL 1995
52.242-14 SUSPENSION OF WORK APR 1984
52.243-4 CHANGES JUN 2007
52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS NOV 2017
52.245-1 GOVERNMENT PROPERTY JAN 2017
52.246-21 WARRANTY OF CONSTRUCTION MAR 1994
52.248-3 VALUE ENGINEERING - CONSTRUCTION OCT 2015
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT
(FIXED-PRICE)
APR 2012
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT
(FIXED-PRICE) – ALTERNATE I
SEP 1996
52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) APR 1984
52.253-1 COMPUTER GENERATED FORMS JAN 1991
The following clauses are provided in full text:
52.211-10 – COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the Task Order notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the number of days after the date the contractor receives the notice to proceed as specified in the Task Order. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
52.216-19 – ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,500, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor --
(1) Any order for a single item in excess of $300,000;
(2) Any order for a combination of items in excess of $300,000; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 7 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 19 of 41
52.216-18 – ORDERING (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from the contract period performance start date through the period of performance end date.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
(End of Clause)
52.216-22 – INDEFINITE QUANTITY (OCT 1995)
(a) This is an indefinite-quantity contract for the construction services specified, and effective for the period stated, in the Schedule. The quantities of services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the construction services specified in the Schedule up to and including the quantity designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the Schedule as the “minimum.”
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 1 year following after the end of the period of performance.
(End of Clause)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 20 of 41
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror’s attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for Minority Participation for Each Trade Goals for Female Participation for Each Trade OR Clatsop = 2.9% WA Pacific = 6.2%
WA Wahkiakum = 2.9%
6.9%
These goals are applicable to all the Contractor’s construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor’s compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on
(1) its implementation of the Equal Opportunity clause,
(2) specific affirmative action obligations required by the clause entitled “Affirmative Action Compliance Requirements for Construction,’’ and
(3) its efforts to meet the goals.
The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer’s identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the “covered area” is Ilwaco, Pacific County, WA; Cathlamet, Wahkiakum County, WA; and Tenasillahe Island & Lewis & Clark NWR, Clatsop County, OR.
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 21 of 41
(End of Provision)
52.225-9 – BUY AMERICAN–CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 22 of 41
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: none.
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
Equipment Operation for Habitat Restoration & Land Mgmt Activities IDIQ SOLICITATION NO. 140F0118Q0037 FWS Willapa NWRC Page 23 of 41
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) * Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.