Attachment__1_-_Pricing_Schedule.pdf

PDF 122 KB Posted

Attached to
USFWS-Willapa NWRC-Heavy Equipment Operation IDIQ
Solicitation number
140F0118Q0037
Issued by

About this file

Pricing Schedule

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICING SCHEDULE

Solicitation: 140F0118Q0037

Instructions: Please fill out this pricing sheet completely, for each item and location for which you wish to submit a price. Indicate the make and model for each type of equipment (include HP and/or size of attachments), an hourly rate for the base machine with the specified attachment and the equipment mobilization rate (to and from the work location), if any. Note that you must provide a price for at least half of these items, but it is not required to provide a price for every item.

1. Low Ground Pressure crawler dozer with 6-way blade and cable winch on rear (Caterpillar D6 Series, John Deere 750 Series or equivalent).

Offered Model and Specs:

Pricing:

Contract Period Hourly Price Mobilization Cost, Ilwaco, WA

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

Contract Year 4

Contract Year 5

2. Low Ground Pressure crawler dozer with a standard universal blade with rippers on rear (John

Deere 850 Series or equivalent).

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

3. Hydraulic Excavator with 24-inch minimum-width tracks, standard arm with minimum 33-foot reach at grade, minimum one cubic yard heaped capacity bucket (Caterpillar 225 Series, John Deere 690 ELC Series, or equivalent).

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

4. Long Reach Hydraulic Excavator with 24-minimum-width tracks, long arm with minimum 59 foot reach at grade, minimum once cubic yard heaped capacity bucket (John Deere 270C LC or equivalent)

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

5. Rubber wheeled back hoe, four wheel drive, with a reach of not less than 15 feet (John Deere 410 or equivalent)

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

6. Road grader - Articulating, rubber -wheeled, four wheel drive, and a standard universal blade with subsoiler (Caterpillar 140 or equivalent).

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

7. Rear dump truck, standard with not less than 10 cubic yards capacity.

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

8. Rear dump truck, 10 cubic yards capacity, heavy duty, six- wheel drive, dump truck capable of off-road hauling in various substrates including ocean beach sand and coastal pastures for various restoration activities such as wetland habitat and snowy plover nesting restoration.

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

9. Rubber tracked rear dump truck, minimum 10 cubic yards capacity,(Morooka MST-2200VD or similar)

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

10. Vibratory Drum Roller, self- propelled, single roller configuration, roller minimum width 4 feet, minimum weight 2000 lbs.

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

11. Vibratory Drum Roller, self- propelled, single roller configuration, roller minimum width 8 foot, minimum weight 8000 lbs.

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

12. Tractor and disc – not less than a 95 HP, four-wheel drive, PTO 540-1000 RPM.

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

13. Tractor and disc- not less than 250 HP, four wheel drive, PTO 540-1000 RPM.

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

14. Tractor and Lowboy – triple axel capable of hauling a hydraulic excavator similar in size to

John Deere 790, with a minimum 26’ bed length by 14’ width, and 120,000 lbs. gross weight.

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

15. Articulated dump truck, minimum of 20.0 cubic yards capacity, heavy duty, dump truck capable of off-road hauling in various substrates (Caterpillar D25D or equivalent).

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

16. Hydraulic Mini Excavator with 17-inch minimum-width tracks, standard arm with minimum

23-foot reach at grade, minimum 0.3 cubic yards capacity bucket (Kubota KX080 or equivalent).

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

17. Rubber-tired wheel loader, four wheel drive, with a minimum of a 2.0 cubic yards bucket (Caterpillar 930M or equivalent).

Mobilization Cost, Cathlamet, WA

Contract Year 1

Contract Year 2

Contract Year 3

Hourly PriceContract Year 1:
Mobilization Cost Ilwaco WAContract Year 1:
Mobilization Cost Cathlamet WAContract Year 1:
Hourly PriceContract Year 2:
Mobilization Cost Ilwaco WAContract Year 2:
Mobilization Cost Cathlamet WAContract Year 2:
Hourly PriceContract Year 3:
Mobilization Cost Ilwaco WAContract Year 3:
Mobilization Cost Cathlamet WAContract Year 3:
Hourly PriceContract Year 4:
Mobilization Cost Ilwaco WAContract Year 4:
Mobilization Cost Cathlamet WAContract Year 4:
Hourly PriceContract Year 5:
Mobilization Cost Ilwaco WAContract Year 5:
Mobilization Cost Cathlamet WAContract Year 5:
Hourly PriceContract Year 1_2:
Mobilization Cost Ilwaco WAContract Year 1_2:
Mobilization Cost Cathlamet WAContract Year 1_2:
Hourly PriceContract Year 2_2:
Mobilization Cost Ilwaco WAContract Year 2_2:
Mobilization Cost Cathlamet WAContract Year 2_2:
Hourly PriceContract Year 3_2:
Mobilization Cost Ilwaco WAContract Year 3_2:
Mobilization Cost Cathlamet WAContract Year 3_2:
Hourly PriceContract Year 4_2:
Mobilization Cost Ilwaco WAContract Year 4_2:
Mobilization Cost Cathlamet WAContract Year 4_2:
Hourly PriceContract Year 5_2:
Mobilization Cost Ilwaco WAContract Year 5_2:
Mobilization Cost Cathlamet WAContract Year 5_2:
Hourly PriceContract Year 1_3:
Mobilization Cost Ilwaco WAContract Year 1_3:
Mobilization Cost Cathlamet WAContract Year 1_3:
Hourly PriceContract Year 2_3:
Mobilization Cost Ilwaco WAContract Year 2_3:
Mobilization Cost Cathlamet WAContract Year 2_3:
Hourly PriceContract Year 3_3:
Mobilization Cost Ilwaco WAContract Year 3_3:
Mobilization Cost Cathlamet WAContract Year 3_3:
Hourly PriceContract Year 4_3:
Mobilization Cost Ilwaco WAContract Year 4_3:
Mobilization Cost Cathlamet WAContract Year 4_3:
Hourly PriceContract Year 5_3:
Mobilization Cost Ilwaco WAContract Year 5_3:
Mobilization Cost Cathlamet WAContract Year 5_3:
Hourly PriceContract Year 1_4:
Mobilization Cost Ilwaco WAContract Year 1_4:
Mobilization Cost Cathlamet WAContract Year 1_4:
Hourly PriceContract Year 2_4:
Mobilization Cost Ilwaco WAContract Year 2_4:
Mobilization Cost Cathlamet WAContract Year 2_4:
Hourly PriceContract Year 3_4:
Mobilization Cost Ilwaco WAContract Year 3_4:
Mobilization Cost Cathlamet WAContract Year 3_4:
Hourly PriceContract Year 4_4:
Mobilization Cost Ilwaco WAContract Year 4_4:
Mobilization Cost Cathlamet WAContract Year 4_4:
Hourly PriceContract Year 5_4:
Mobilization Cost Ilwaco WAContract Year 5_4:
Mobilization Cost Cathlamet WAContract Year 5_4:
Hourly PriceContract Year 1_5:
Mobilization Cost Ilwaco WAContract Year 1_5:
Mobilization Cost Cathlamet WAContract Year 1_5:
Hourly PriceContract Year 2_5:
Mobilization Cost Ilwaco WAContract Year 2_5:
Mobilization Cost Cathlamet WAContract Year 2_5:
Hourly PriceContract Year 3_5:
Mobilization Cost Ilwaco WAContract Year 3_5:
Mobilization Cost Cathlamet WAContract Year 3_5:
Hourly PriceContract Year 4_5:
Mobilization Cost Ilwaco WAContract Year 4_5:
Mobilization Cost Cathlamet WAContract Year 4_5:
Hourly PriceContract Year 5_5:
Mobilization Cost Ilwaco WAContract Year 5_5:
Mobilization Cost Cathlamet WAContract Year 5_5:
Hourly PriceContract Year 1_6:
Mobilization Cost Ilwaco WAContract Year 1_6:
Mobilization Cost Cathlamet WAContract Year 1_6:
Hourly PriceContract Year 2_6:
Mobilization Cost Ilwaco WAContract Year 2_6:
Mobilization Cost Cathlamet WAContract Year 2_6:
Hourly PriceContract Year 3_6:
Mobilization Cost Ilwaco WAContract Year 3_6:
Mobilization Cost Cathlamet WAContract Year 3_6:
Hourly PriceContract Year 4_6:
Mobilization Cost Ilwaco WAContract Year 4_6:
Mobilization Cost Cathlamet WAContract Year 4_6:
Hourly PriceContract Year 5_6:
Mobilization Cost Ilwaco WAContract Year 5_6:
Mobilization Cost Cathlamet WAContract Year 5_6:
Hourly PriceContract Year 1_7:
Mobilization Cost Ilwaco WAContract Year 1_7:
Mobilization Cost Cathlamet WAContract Year 1_7:
Hourly PriceContract Year 2_7:
Mobilization Cost Ilwaco WAContract Year 2_7:
Mobilization Cost Cathlamet WAContract Year 2_7:
Hourly PriceContract Year 3_7:
Mobilization Cost Ilwaco WAContract Year 3_7:
Mobilization Cost Cathlamet WAContract Year 3_7:
Hourly PriceContract Year 4_7:
Mobilization Cost Ilwaco WAContract Year 4_7:
Mobilization Cost Cathlamet WAContract Year 4_7:
Hourly PriceContract Year 5_7:
Mobilization Cost Ilwaco WAContract Year 5_7:
Mobilization Cost Cathlamet WAContract Year 5_7:
Hourly PriceContract Year 1_8:
Mobilization Cost Ilwaco WAContract Year 1_8:
Mobilization Cost Cathlamet WAContract Year 1_8:
Hourly PriceContract Year 2_8:
Mobilization Cost Ilwaco WAContract Year 2_8:
Mobilization Cost Cathlamet WAContract Year 2_8:
Hourly PriceContract Year 3_8:
Mobilization Cost Ilwaco WAContract Year 3_8:
Mobilization Cost Cathlamet WAContract Year 3_8:
Hourly PriceContract Year 4_8:
Mobilization Cost Ilwaco WAContract Year 4_8:
Mobilization Cost Cathlamet WAContract Year 4_8:
Hourly PriceContract Year 5_8:
Mobilization Cost Ilwaco WAContract Year 5_8:
Mobilization Cost Cathlamet WAContract Year 5_8:
Hourly PriceContract Year 1_9:
Mobilization Cost Ilwaco WAContract Year 1_9:
Mobilization Cost Cathlamet WAContract Year 1_9:
Hourly PriceContract Year 2_9:
Mobilization Cost Ilwaco WAContract Year 2_9:
Mobilization Cost Cathlamet WAContract Year 2_9:
Hourly PriceContract Year 3_9:
Mobilization Cost Ilwaco WAContract Year 3_9:
Mobilization Cost Cathlamet WAContract Year 3_9:
Hourly PriceContract Year 4_9:
Mobilization Cost Ilwaco WAContract Year 4_9:
Mobilization Cost Cathlamet WAContract Year 4_9:
Hourly PriceContract Year 5_9:
Mobilization Cost Ilwaco WAContract Year 5_9:
Mobilization Cost Cathlamet WAContract Year 5_9:
Hourly PriceContract Year 1_10:
Mobilization Cost Ilwaco WAContract Year 1_10:
Mobilization Cost Cathlamet WAContract Year 1_10:
Hourly PriceContract Year 2_10:
Mobilization Cost Ilwaco WAContract Year 2_10:
Mobilization Cost Cathlamet WAContract Year 2_10:
Hourly PriceContract Year 3_10:
Mobilization Cost Ilwaco WAContract Year 3_10:
Mobilization Cost Cathlamet WAContract Year 3_10:
Hourly PriceContract Year 4_10:
Mobilization Cost Ilwaco WAContract Year 4_10:
Mobilization Cost Cathlamet WAContract Year 4_10:
Hourly PriceContract Year 5_10:
Mobilization Cost Ilwaco WAContract Year 5_10:
Mobilization Cost Cathlamet WAContract Year 5_10:
Hourly PriceContract Year 1_11:
Mobilization Cost Ilwaco WAContract Year 1_11:
Mobilization Cost Cathlamet WAContract Year 1_11:
Hourly PriceContract Year 2_11:
Mobilization Cost Ilwaco WAContract Year 2_11:
Mobilization Cost Cathlamet WAContract Year 2_11:
Hourly PriceContract Year 3_11:
Mobilization Cost Ilwaco WAContract Year 3_11:
Mobilization Cost Cathlamet WAContract Year 3_11:
Hourly PriceContract Year 4_11:
Mobilization Cost Ilwaco WAContract Year 4_11:
Mobilization Cost Cathlamet WAContract Year 4_11:
Hourly PriceContract Year 5_11:
Mobilization Cost Ilwaco WAContract Year 5_11:
Mobilization Cost Cathlamet WAContract Year 5_11:
Hourly PriceContract Year 1_12:
Mobilization Cost Ilwaco WAContract Year 1_12:
Mobilization Cost Cathlamet WAContract Year 1_12:
Hourly PriceContract Year 2_12:
Mobilization Cost Ilwaco WAContract Year 2_12:
Mobilization Cost Cathlamet WAContract Year 2_12:
Hourly PriceContract Year 3_12:
Mobilization Cost Ilwaco WAContract Year 3_12:
Mobilization Cost Cathlamet WAContract Year 3_12:
Hourly PriceContract Year 4_12:
Mobilization Cost Ilwaco WAContract Year 4_12:
Mobilization Cost Cathlamet WAContract Year 4_12:
Hourly PriceContract Year 5_12:
Mobilization Cost Ilwaco WAContract Year 5_12:
Mobilization Cost Cathlamet WAContract Year 5_12:
Hourly PriceContract Year 1_13:
Mobilization Cost Ilwaco WAContract Year 1_13:
Mobilization Cost Cathlamet WAContract Year 1_13:
Hourly PriceContract Year 2_13:
Mobilization Cost Ilwaco WAContract Year 2_13:
Mobilization Cost Cathlamet WAContract Year 2_13:
Hourly PriceContract Year 3_13:
Mobilization Cost Ilwaco WAContract Year 3_13:
Mobilization Cost Cathlamet WAContract Year 3_13:
Hourly PriceContract Year 4_13:
Mobilization Cost Ilwaco WAContract Year 4_13:
Mobilization Cost Cathlamet WAContract Year 4_13:
Hourly PriceContract Year 5_13:
Mobilization Cost Ilwaco WAContract Year 5_13:
Mobilization Cost Cathlamet WAContract Year 5_13:
Hourly PriceContract Year 1_14:
Mobilization Cost Ilwaco WAContract Year 1_14:
Mobilization Cost Cathlamet WAContract Year 1_14:
Hourly PriceContract Year 2_14:
Mobilization Cost Ilwaco WAContract Year 2_14:
Mobilization Cost Cathlamet WAContract Year 2_14:
Hourly PriceContract Year 3_14:
Mobilization Cost Ilwaco WAContract Year 3_14:
Mobilization Cost Cathlamet WAContract Year 3_14:
Hourly PriceContract Year 4_14:
Mobilization Cost Ilwaco WAContract Year 4_14:
Mobilization Cost Cathlamet WAContract Year 4_14:
Hourly PriceContract Year 5_14:
Mobilization Cost Ilwaco WAContract Year 5_14:
Mobilization Cost Cathlamet WAContract Year 5_14:
Hourly PriceContract Year 1_15:
Mobilization Cost Ilwaco WAContract Year 1_15:
Mobilization Cost Cathlamet WAContract Year 1_15:
Hourly PriceContract Year 2_15:
Mobilization Cost Ilwaco WAContract Year 2_15:
Mobilization Cost Cathlamet WAContract Year 2_15:
Hourly PriceContract Year 3_15:
Mobilization Cost Ilwaco WAContract Year 3_15:
Mobilization Cost Cathlamet WAContract Year 3_15:
Hourly PriceContract Year 4_15:
Mobilization Cost Ilwaco WAContract Year 4_15:
Mobilization Cost Cathlamet WAContract Year 4_15:
Hourly PriceContract Year 5_15:
Mobilization Cost Ilwaco WAContract Year 5_15:
Mobilization Cost Cathlamet WAContract Year 5_15:
Hourly PriceContract Year 1_16:
Mobilization Cost Ilwaco WAContract Year 1_16:
Mobilization Cost Cathlamet WAContract Year 1_16:
Hourly PriceContract Year 2_16:
Mobilization Cost Ilwaco WAContract Year 2_16:
Mobilization Cost Cathlamet WAContract Year 2_16:
Hourly PriceContract Year 3_16:
Mobilization Cost Ilwaco WAContract Year 3_16:
Mobilization Cost Cathlamet WAContract Year 3_16:
Hourly PriceContract Year 4_16:
Mobilization Cost Ilwaco WAContract Year 4_16:
Mobilization Cost Cathlamet WAContract Year 4_16:
Hourly PriceContract Year 5_16:
Mobilization Cost Ilwaco WAContract Year 5_16:
Mobilization Cost Cathlamet WAContract Year 5_16:
Hourly PriceContract Year 1_17:
Mobilization Cost Ilwaco WAContract Year 1_17:
Mobilization Cost Cathlamet WAContract Year 1_17:
Hourly PriceContract Year 2_17:
Mobilization Cost Ilwaco WAContract Year 2_17:
Mobilization Cost Cathlamet WAContract Year 2_17:
Hourly PriceContract Year 3_17:
Mobilization Cost Ilwaco WAContract Year 3_17:
Mobilization Cost Cathlamet WAContract Year 3_17:
Hourly PriceContract Year 4_17:
Mobilization Cost Ilwaco WAContract Year 4_17:
Mobilization Cost Cathlamet WAContract Year 4_17:
Hourly PriceContract Year 5_17:
Mobilization Cost Ilwaco WAContract Year 5_17:
Mobilization Cost Cathlamet WAContract Year 5_17:
Model & Specs:

File details come from the government source that posted it.