14-FY26-RFP-004 Cost Proposal.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Facility Security Equipment Upgrade State and local contract opportunity
Solicitation number
FY26-RFP-004
Issued by
Illinois

About this file

The document is a Cost Proposal Excel spreadsheet (14-FY26-RFP-004) for a Facility Security Equipment Upgrade project for Connect Transit in Illinois, detailing a comprehensive security systems implementation. The proposal covers multiple technology infrastructure components including server room equipment, camera coverage (10 exterior and 10 interior camera types), access control systems (door controllers, badge readers, intercoms, gate systems), networking infrastructure (access points, network switches, network cabling), and an optional visitor/guest management system. The scope involves designing, furnishing, installing, configuring, and commissioning complete security systems for two Connect Transit facilities.

The cost proposal spreadsheet is structured with detailed line items for each technological category, with placeholder pricing set at $0.00 across all components. While no specific pricing is populated in the current document, the proposal framework allows for granular cost breakdown by equipment type, quantity, unit cost, and total cost, with additional allocations for labor, installation, materials, and optional components. The document suggests a comprehensive technology upgrade approach that encompasses physical security (cameras, access control), network infrastructure, and potential visitor management capabilities, indicating a holistic security system transformation for the transit facilities.

View the file

Other files for this state and local contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Cost Proposal - Vendor Name:
Server RoomMake/ModelQuantityUnit Cost ($)Total Cost ($)Notes / Comments
Network Rack$0.00
Labor/Installation$0.00
Materials$0.00
Other$0.00
Optional Components$0.00
Subtotal for Server Room$0.00
Camera CoverageMake/ModelQuantityUnit Cost ($)Total Cost ($)Notes / Comments
Network Video Recorder$0.00
Exterior Cameras Type 1$0.00
Exterior Cameras Type 2$0.00
Exterior Cameras Type 3$0.00
Exterior Cameras Type 4$0.00
Exterior Cameras Type 5$0.00
Exterior Cameras Type 6$0.00
Exterior Cameras Type 7$0.00
Exterior Cameras Type 8$0.00
Exterior Cameras Type 9$0.00
Exterior Cameras Type 10$0.00
Interior Cameras Type 1$0.00
Interior Cameras Type 2$0.00
Interior Cameras Type 3$0.00
Interior Cameras Type 4$0.00
Interior Cameras Type 5$0.00
Interior Cameras Type 6$0.00
Interior Cameras Type 7$0.00
Interior Cameras Type 8$0.00
Interior Cameras Type 9$0.00
Interior Cameras Type 10$0.00
Software Installation/Configuration$0.00
Labor/Installation$0.00
Materials$0.00
Other$0.00
Optional Components$0.00
Subtotal for Camera Coverage$0.00
Access ControlMake/ModelQuantityUnit Cost ($)Total Cost ($)Notes / Comments
Door Controller Hub Type 1$0.00
Door Controller Hub Type 2$0.00
Door Controller Hub Type 3$0.00
Door Controller Hub Type 4$0.00
Door Controller Hub Type 5$0.00
Access/Badge Reader Type 1$0.00
Access/Badge Reader Type 2$0.00
Access/Badge Reader Type 3$0.00
Access/Badge Reader Type 4$0.00
Access/Badge Reader Type 5$0.00
Intercom$0.00
Gate Hub$0.00
Gate Reader$0.00
Labor/Installation$0.00
Materials$0.00
Other$0.00
Optional Components$0.00
Subtotal for Access Control$0.00
NetworkingMake/ModelQuantityUnit Cost ($)Total Cost ($)Notes / Comments
Access Point Type 1$0.00
Access Point Type 2$0.00
Access Point Type 3$0.00
Access Point Type 4$0.00
Access Point Type 5$0.00
Network Switch Type 1$0.00
Network Switch Type 2$0.00
Network Switch Type 3$0.00
Network Switch Type 4$0.00
Network Switch Type 5$0.00
Network Switch Type 6$0.00
Network Switch Type 7$0.00
Network Switch Type 8$0.00
Network Switch Type 9$0.00
Network Switch Type 10$0.00
Network Cable Type 1$0.00
Network Cable Type 2$0.00
Network Cable Type 3$0.00
Power Redundancy$0.00
Labor/Installation$0.00
Materials$0.00
Other$0.00
Optional Components$0.00
Subtotal for Networking$0.00
Optional – Visitor/Guest ManagementMake/ModelQuantityUnit Cost ($)Total Cost ($)Notes / Comments
Tablet/POS$0.00
Printer$0.00
Software Installation/Configuration$0.00
Hardware Installation/Configuration$0.00
Other$0.00
Optional Components$0.00
Subtotal for Optional – Visitor/Guest Management$0.00
GRAND TOTAL$0.00

File details come from the government source that posted it. Updated .