14_CDRLs_for_FAT_FD2020_22_50040_22_50041_Oct_ 2022_Corrected.pdf

PDF 226 KB Posted

Attached to
KC-135 & C-17 Fire Cartridges Federal contract opportunity
Solicitation number
FA8213-23-R-5004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains two Contract Data Requirements Lists (CDRLs) for qualification testing and inspection reporting related to KC-135 & C-17 Fire Cartridges. The CDRLs require submission of a First Article Test Inspection Report and Test Procedure using the contractor's test format, to be certified by DCMA/QAR and submitted through WAWF. A Qualification Test Plan and Procedures must also be submitted for approval within 30 days of award and in Microsoft Office or PDF format through WAWF. The Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base is the requiring activity. Distribution is limited to the U.S. Government with all submittals handled through the WAWF system and references the solicitation for KC-135 & C-17 Fire Cartridges.

View the file

Other files for this federal contract opportunity

Other files attached to KC-135 & C-17 Fire Cartridges, newest first.
File Type Posted
FA8213-23-R-5004_0002.pdf PDF
FA8213-23-R-5004_0001.pdf PDF
16_CDRLs_FD2020_22_50044.pdf PDF
13_CDRLs_FD2020_22_50040_AND_50041_Oct_22_Corrected.pdf PDF
12_ItemDescription_Combined_FD2020_22_50044_and_50072.pdf PDF
09_QALI_KC_135_FireCart_MJ92_MJ15.pdf PDF
02_AirSpec_FD20202250044.pdf PDF
07_SOW_February2022.pdf PDF
11_ItemDescriptions_FD2020-22-50040and50041.pdf PDF
FA8213-23-R-5004.pdf PDF
08_SPI_Combined.pdf PDF
05_ADC_SOW_Jan2018.pdf PDF
03_AirSpec_FD20202350072.pdf PDF
15_CDRLS_FD2020_23_50072.pdf PDF
04_REPSHIP.pdf PDF
10_Rework_and_Repair_ES7034.pdf PDF
06_CADPAD_Item_Marking_Instruction_Ver1_5_20190501.pdf PDF
01-AirSpec_FD20202250040and50041.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

1377012340912ES*

E. CONTRACT/PR NO.

FD2020-22-50040/22-50041

F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

Test Procedure

3. SUBTITLE

First Article Test Inspection Report , Contractor Test

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80603A

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHJ

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

1TIME

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 4: Follow format per DID. Incorporate the following applicable requirements:

a. Dimension and tolerances specified on the manufacturing data shall be listed in one column with the actual corresponding reading obtained from inspection of the part, listed in another column.

b. Material utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable data requirements.

c. Certification that identification markings, i.e. part number per MIL-STD-130N(1) and Federal Supply manufacturer (FSCM) per H4-1 Cataloging Handbook (if applicable) have been complied with.

e. The test report will be certified by the responsible DCMA/QAR.

(Authorization for any deviations from the requirements specified by the manufacturing data must be obtained from the procuring agency prior to inclusion in the test report).

BLK 7: The electronic receiving report shall be annotated with the Lot Number, National Stock Number, and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at https://wawf.eb.mil.

BLK 9: DISTRIBUTION STATEMENT B. Distribution authorized to U.S.

Government agencies( (Administrative/Operational Use) (Date of Contract Award). Other requests for this document shall be referred to AFLCMC/EBHJ.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec.

2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C. App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

DESTRUCTION NOTICE - Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLK 12: Submit no later than 30 days after completion of First Article Acceptance Testing. Submit through WAWF under DoDAAC, FA8213.

*1377016765427ES,1377012258235ES,1377016767654ES.

FOB DESTINATION

EBH 22-258-001

Terry McCurdy, AFLCMC/EBHEC,586-0535

WAWF 0 1 0

DoDAAC, FA8213

15. TOTAL 0 1 0

G. PREPARED BY

mccurdy.terry.d.1075978215

H. DATE

2022/09/15

I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

17. PRICE GROUP

20221020

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

1377012340912ES*

E. CONTRACT/PR NO.

FD2020-22-50040/22-50041

F. CONTRACTOR

1. DATA ITEM NO.

B002

2. TITLE OF DATA ITEM

First Article Qualification Test Plan and Procedures

3. SUBTITLE

Test Plan

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-81307A

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHJ

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 7: The electronic receiving report shall be annotated with the Lot Number, National Stock Number and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at:

https://wawf.eb.mil. The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement.

BLK 8: Comments/approval/disapproval will be submitted within 30 working days of receipt by AFLCMC/EBHJ.

BLK 9: DISTRIBUTION STATEMENT B. Distribution authorized to U.S.

Government agencies( (Administrative/Operational Use) (Date of Contract Award). Other requests for this document shall be referred to AFLCMC/EBHJ.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE - Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLK 10, 11, 12, 13: The contractor shall provide a Qualification Test Plan/Procedures 30 days after contract award, allowing for 30 days approval time. No changes to previously approved government Test Plans shall be made without prior approval from AFLCMC/EBHJ Engineering approval, IAW Airmunitions Specification.

BLK 14: Submittals shall be in Microsoft Office software or PDF format. Submit through WAWF, DoDAAC, FA8213.

*1377016765427ES,1377012258235ES,1377016767654ES.

FOB DESTINATION

EBH 22-258-001

Terry McCurdy, AFLCMC/EBHEC, 586-0535

WAWF 0 1 0

DoDAAC, FA8213

15. TOTAL 0 1 0

G. PREPARED BY

mccurdy.terry.d.1075978215

H. DATE

2022/09/15

I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

17. PRICE GROUP

20221020

2022-10-20T11:42:07-0600
HARGROVE.ERIC.V.1167016843
2022-10-20T11:42:39-0600
HARGROVE.ERIC.V.1167016843

File details come from the government source that posted it. Updated .