09_QALI_KC_135_FireCart_MJ92_MJ15.pdf

PDF 896 KB Posted

Attached to
KC-135 & C-17 Fire Cartridges Federal contract opportunity
Solicitation number
FA8213-23-R-5004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document outlines quality assurance requirements for a federal contract to produce KC-135 and C-17 fire cartridges. The contractor must allow DCMA inspection at key points including manufacturing planning documentation, leak testing, x-ray and gamma ray inspection, lot acceptance testing, ammunition data card review, and preparation for shipment. Inspections will be mandatory, witnessed, verified, monitored, or require notification as specified. The related federal contract opportunity is solicitation number FA8213-23-R-5004 for KC-135 and C-17 fire cartridges issued by the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base. The document provides quality assurance requirements for the contractor to meet under this contract.

View the file

Other files for this federal contract opportunity

Other files attached to KC-135 & C-17 Fire Cartridges, newest first.
File Type Posted
FA8213-23-R-5004_0002.pdf PDF
FA8213-23-R-5004_0001.pdf PDF
FA8213-23-R-5004.pdf PDF
08_SPI_Combined.pdf PDF
05_ADC_SOW_Jan2018.pdf PDF
03_AirSpec_FD20202350072.pdf PDF
15_CDRLS_FD2020_23_50072.pdf PDF
04_REPSHIP.pdf PDF
10_Rework_and_Repair_ES7034.pdf PDF
06_CADPAD_Item_Marking_Instruction_Ver1_5_20190501.pdf PDF
01-AirSpec_FD20202250040and50041.pdf PDF
16_CDRLs_FD2020_22_50044.pdf PDF
13_CDRLs_FD2020_22_50040_AND_50041_Oct_22_Corrected.pdf PDF
12_ItemDescription_Combined_FD2020_22_50044_and_50072.pdf PDF
02_AirSpec_FD20202250044.pdf PDF
14_CDRLs_for_FAT_FD2020_22_50040_22_50041_Oct_ 2022_Corrected.pdf PDF
07_SOW_February2022.pdf PDF
11_ItemDescriptions_FD2020-22-50040and50041.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46: 08AUG2021
2021-08-09T14:24:04-0600
KELLY.ZACHARY.ANDREW.1596765501
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: 878493-2/200330-4, 878492-2/200330-3
DODIC: MJ92/MJ15
Text20: 61423, 57597
Text19:
Part Number Line 2:
Contract No: 22-50040/50041
Date Contract Awarded:
Final Delivery Date FDD:
Program Name:

File details come from the government source that posted it. Updated .