03_AirSpec_FD20202350072.pdf
PDF 595 KB Posted
- Attached to
- KC-135 & C-17 Fire Cartridges Federal contract opportunity
- Solicitation number
- FA8213-23-R-5004
About this file
This document outlines specifications for an ammunition procurement. Key details include:
-
The solicitation is for KC-135 & C-17 Fire Cartridges to be provided under contract number FA8213-23-R-5004 for the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base.
-
The specifications require advanced shipment notifications, contact with the Defense Contract Management Agency for transportation guidance, use of ammunition data cards and item marking in accordance with standard protocols, and compliance with various technical and quality standards for materials, manufacturing, testing, and documentation. Critical safety items are designated, and approval is required for nonconforming materials and repairs.
-
Key contract clauses address safety precautions for ammunition and explosives, changes to the place of performance, and air shipment requirements if applicable. The contractor must provide obsolescence alerts and follow standard procedures for acceptance of product.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8213-23-R-5004_0002.pdf | ||
| FA8213-23-R-5004_0001.pdf | ||
| FA8213-23-R-5004.pdf | ||
| 08_SPI_Combined.pdf | ||
| 05_ADC_SOW_Jan2018.pdf | ||
| 15_CDRLS_FD2020_23_50072.pdf | ||
| 04_REPSHIP.pdf | ||
| 16_CDRLs_FD2020_22_50044.pdf | ||
| 13_CDRLs_FD2020_22_50040_AND_50041_Oct_22_Corrected.pdf | ||
| 12_ItemDescription_Combined_FD2020_22_50044_and_50072.pdf | ||
| 10_Rework_and_Repair_ES7034.pdf | ||
| 06_CADPAD_Item_Marking_Instruction_Ver1_5_20190501.pdf | ||
| 01-AirSpec_FD20202250040and50041.pdf | ||
| 09_QALI_KC_135_FireCart_MJ92_MJ15.pdf | ||
| 02_AirSpec_FD20202250044.pdf | ||
| 14_CDRLs_for_FAT_FD2020_22_50040_22_50041_Oct_ 2022_Corrected.pdf | ||
| 07_SOW_February2022.pdf | ||
| 11_ItemDescriptions_FD2020-22-50040and50041.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(Version 19 May 2022)
AIRMUNITION SPECIFICATION
DATE: 02/14/2023
FD2020-23-50072
NSN: 1377-01-391-5415ES
1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with Attached REPSHIP.
2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of Availability (NOA) including FMS case and requisition numbers by mail to:
AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.
3. Department of Defense Identification Code (DODIC): MD61
4. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)
5. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.5, 1
May 2019, reference attachment.
6. Shelf Life Code marking NOT required per MIL-STD-129R.
7. Hazard Classification Information: 1377013915415 Hazard Class/Division: 1.4 Compatibility Group: S DOT Marking/EX Number: EX1995060140 DOT Shipping Labels: EXPLOSIVE 1.4S UN Number: UN0323 Proper Shipping Name: CARTRIDGES, POWER DEVICE Net Explosive Weight per item (NEW): 0.001200 NEW Unit of Measurement: LBS
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC.
If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.
8. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB. Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:
COGNIZANT GOVERNMENT ENGINEER / ACO / CONTRACTOR
ECPs -- CDRL (DI-SESS-80639E) NORs – CDRL (DI-SESS-80642E) RFVs – CDRL (DI-SESS-80640E)
Distribution Statement: B, Reason: ADMINISTRATIVE OR OPERATIONAL (ref. DoD 5230.24)
9. Item(s) must pass both gross and fine leak checks. MIL-STD-883L, Method 1014.18 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same.
Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission. CDRL (DI-QCIC-80553A)
10. Electronic Systems to encompass system, subsystem, pieces parts and assemblies shall not contain any substitutes for Tin-Lead solder and finishes. The use of any Tin-Lead solder substitutes requires approval through PCO and cognizant engineer, REFERENCE:
“Airworthiness Advisory (AA-08-02) Lead-Free Electronics” and GEIA-STD-0005-1 & 2.
CDRL (DI-MGMT-81772)
11. Lot Acceptance Test Requirements are: CONTRACTOR IAW LATEST USG APPROVED
ATP
12. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF
CDRL: (DI-NDTI-80809B)
13. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the
PCO/ACO and Air Force Engineering Organization within 1 business day.
Air Force Engineering Organization:
Organization AFLCMC/ EBHJ E-mail: Devin.swanson@us.af.mil
14. In the event of test failure(s), a Failure Summary and Analysis Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255B)
15. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.
16. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed ___ months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).
17. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed __ months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the variance and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan. Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.
18. Percussion primers shall have been certified /recertified by performing sensitivity (all-fire/no fire) and dud testing per applicable specification within the past __ months unless they are Navy certified and have a 2 year certification. Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item. All primers shall be X-rayed in top and side views for critical defects prior to use.
19. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.
MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA:
20. The contractor is allowed to pre-select no more than 30% of the required production lot test samples per lot which have external cosmetic defects such as nicks, dings, scratches, paint blemishes, plating blemishes, and small burrs. These units can be used as pre-selected production lot test samples as long as the units do not create an interference with the test fixture. The selection of those samples shall be noted in a discrepancy report that shall identify the item part number, DODIC, contract, lot number, serial numbers of the pre-selected units, and the cosmetic defect of each serial number. DCMA shall be notified in advance by submission of the discrepancy report of the preselected production lot test samples with external cosmetic defects prior to submission of the production lot for random sample selection. LAT units preselected under this premise shall be noted in the Lot Acceptance Test Report.
21. Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment #5, Clause ES7034)
22. DoD Preferred Methods for Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916.
Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.
23. Contractor shall provide an Obsolescence Alert Notice that a pending and/or emergent obsolescence issue exists. CDRL (DI-MGMT-81941)
24. Contracts involving ammunition and explosives (AE) will contain:
- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives
- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:
- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments
File details come from the government source that posted it. Updated .