10_Rework_and_Repair_ES7034.pdf
PDF 290 KB Posted
- Attached to
- KC-135 & C-17 Fire Cartridges Federal contract opportunity
- Solicitation number
- FA8213-23-R-5004
About this file
This document provides rework and repair procedures for nonconforming materials on federal contracts. It defines rework as reprocessing material to fully conform to specifications, while repair reprocesses material to reduce but not eliminate nonconformance. Rework procedures require submission to the Government Quality Assurance Representative for review and approval prior to use, along with associated inspection procedures and descriptions of the nonconformance cause and corrective actions. Repair procedures necessitate submission of a Request for Deviation/Waiver to the Contracting Officer for written approval in advance, accompanied by the same additional information. Both rework and repair procedures must include reinspection provisions taking precedence over technical data package requirements and assuring items meet reprocessing standards. This flow-down requirement applies to all contractors, suppliers, vendors and subcontractors.
The related federal contract opportunity is solicitation number FA8213-23-R-5004 for KC-135 and C-17 fire cartridges from the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8213-23-R-5004_0002.pdf | ||
| FA8213-23-R-5004_0001.pdf | ||
| 09_QALI_KC_135_FireCart_MJ92_MJ15.pdf | ||
| 02_AirSpec_FD20202250044.pdf | ||
| 14_CDRLs_for_FAT_FD2020_22_50040_22_50041_Oct_ 2022_Corrected.pdf | ||
| 07_SOW_February2022.pdf | ||
| 11_ItemDescriptions_FD2020-22-50040and50041.pdf | ||
| 16_CDRLs_FD2020_22_50044.pdf | ||
| 13_CDRLs_FD2020_22_50040_AND_50041_Oct_22_Corrected.pdf | ||
| 12_ItemDescription_Combined_FD2020_22_50044_and_50072.pdf | ||
| FA8213-23-R-5004.pdf | ||
| 08_SPI_Combined.pdf | ||
| 05_ADC_SOW_Jan2018.pdf | ||
| 03_AirSpec_FD20202350072.pdf | ||
| 15_CDRLS_FD2020_23_50072.pdf | ||
| 04_REPSHIP.pdf | ||
| 06_CADPAD_Item_Marking_Instruction_Ver1_5_20190501.pdf | ||
| 01-AirSpec_FD20202250040and50041.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5
(ES7034)
REWORK AND REPAIR OF NONCONFORMING MATERIAL
Jan 2012 (version)
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(End of clause)
(ES7034)
File details come from the government source that posted it. Updated .