- Construction of a Water Well
- Solicitation number
- 13-235-SOL-00005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend__3.pdf | ||
| Amend__2.pdf | ||
| Amend__1_(section_C.1).pdf | ||
| Attach__2_F_ _M_Goals.pdf | ||
| SF_1442.pdf | ||
| Attach__4_Exhibits.pdf | ||
| Solicitation_Body.pdf | ||
| Attach__1_Wages.pdf | ||
| Attach__3_Submittals.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
13-235-SOL-00005
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sacramento CA 95814 650 Capitol Mall, Suite 7-100 John E Moss Federal Bldg California Office of the Director
CA 11-M6203/21/2013000004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/21/2013
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment makes the following changes:
Section 16900, Process Control System should have been added in Amend #2 but was left out.
This amendment adds Section 16900 (attached).
The quote due date has been extended to April 25.
All other terms and conditions remain unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
HARRY J. WEISS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Electronically Signed 04/17/2013
STANDARD SPECIFICATIONS
SECTION 16900
PROCESS CONTROL SYSTEM
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Provide a complete process control system for the facility. The system shall include, well (three pumps) controllers and protection devices, programming, configuration and other necessary hardware for control of (3) well pumps. The system shall interface between the water storage tank, sodium hypochlorite chemical feed pump, chemical feed pump receptacle, and the well pumps.
1.2 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Process Control System: By the lump sum. Includes conduit, wiring, process control system components, enclosures, selector switches, motor starters, pump motor sensing devices, flow transmitter switch, circuit breaker and lightning arrestor, shutoff and bleed valves, pressure snubber, operator training, as-builts, wiring diagrams, and all appurtenances required to make a complete and operable system in accordance with the contract documents.
1.3 QUALITY ASSURANCE
A. Design and install a process control system to ensure long-term reliability of the system.
B. All electrical work shall be performed by a licensed electrician in accordance with the National Electrical Code (NEC), California Code of Regulations (CCR) Title 24 and applicable local regulations.
C. The Control System and appurtenances must function of commercial power and stand by generator.
1.4 SUBMITTALS
A. Complete wiring diagram and control schematic by Control System Manufacturer, illustrating all components being supplied under this contract complete with all mechanical and electrical connections.
B. Include in Operation and Maintenance Manual: Internal wiring diagrams, physical layout of panel front (selector switches, running time meters, counters, etc.), written narrative of control operations, manufacturer’s warranty, and material data sheets with operating and maintenance literature for all components provided under this section.
C. Include two complete sets of hard-covered ring bound loose leaf Operation and
Maintenance Manuals (See Section 01700)
1.5 PROCESS CONTROL SYSTEM DESCRIPTION
A. The system is comprised of three wells (one new and two existing) which will feed an existing water storage tanks (The new well is located approximately 300 feet from the existing water treatment building.
Well capacity is as follows:
1. Well 1= 5-7 gpm
2. Well 2= 2-4 gpm
3. Well 3= TBDm
Well 1 is currently connected to the existing water treatment plant. Well 2 is also connected directly to the water treatment plant via a separate transmission line.
Well 3 which is to be located within 75 feet of well one shall be connected to the existing transmission line.
Well 1 shall alternate lead/lag positions with Well 3. Well 2 shall be used as emergency well pump and shall be shown on the control panel as alternate with a HOA switch and the ability to run on a timer. The system shall be configured to allow only one well to run at a time during normal operations but with the option to run three wells at a time in emergency situations.
B. The controls shall control well pumps by providing tank level status, level set points, pump status, well liquid level status and set points, and alarm history. The control panel shall indicate high and low tank level alarms. Provide an alarm history with the time, date, and type of fault.
C. The system shall interface with the pressure transducer or floats at the water storage tank. All signals shall be received at the control panel in the existing treatment building. The signals shall be as follows
1. High level alarm
2. Low level alarm
3. Lead pump (s) on
4. Lag pumps (s) on
5. Pump (s) off
D. The signals and alarms from the water tank shall be sent to the treatment building control panel. The three control signals are lead pump on, lag pump on, and pump off. The lead pump on control signal shall energize the lead pump (s), while the lag pump level control shall energize the lag pump (s). The pump off shall de-energize all well pumps. Well 2 pump shall be controlled at the treatment building via an HOA and timer. Control scenarios for lead/lag operation are as follows:
1. The pump cycle for well pumps 1 and 3 shall have an adjustable run time between 6-48 hours. If the maximum run time has been reached for that pump and there is still a call for water, the pump that is running shall de-energize and the other pump will be energized.
2. If the well pump in lead position is running and the water level in the tank drops below the lag position the lag pump shall be energized.
The two alarms shall be a low level alarm and high level alarm. The low level alarm shall activate when the level in the tank drops below a set point. The high level alarm shall activate when the level in the tank exceeds a high level set point.
Both alarms shall display on the control panel.
Control for the new well (well pump 3) shall be hard wired to the control panel at the treatment building. Wells pumps 2 and 3 are currently wired to the water treatment building. These pumps shall be connected to the new control panel at the water treatment building. The well pump control panels shall have on/off and auto modes. Off will cut power to the pump. On will provide power to the pump.
In auto mode, the Control Panel/ PLC at the treatment building shall control the well pumps.
Well Pump indication at the treatment building shall include the following:
“running” indication, run timers and cycle counters.
1.6 TRAINING
A. Training program shall educate operators and maintenance personnel with the required level of system familiarity to provide a common working knowledge concerning all significant aspects of the system being supplied.
B. System supplier shall provide training of all equipment installed, including set up, operation, troubleshooting and set point reconfiguration.
C. System supplier shall provide all instructional course material, equipment and manuals to conduct the training program. Training shall be held on site.
1.7 GENERAL REQUIREMENTS
A. All components shall be new, unused and UL listed.
B. The control panel shall be fabricated in accordance to UL 508.
C. All wiring shall be numbered and color-coded.
1.8 ACCEPTANCE
A. Work covered by this section shall not be accepted until testing connected with this work has been completed satisfactorily.
B. Work found defective in performance shall be corrected.
PART 2 PRODUCTS
2.1 PROCESS CONTROL SYSTEM
A. Manufacturer:
1. Sierra Controls, Reno, NV Phone (775) 883-0443; email jerryk@sierracontrols or equal
2. All additional relays, switches, circuitry and other electronic components required to install a fully functional automated pumping operation.
2.2 SYSTEM DESCRIPTION
A. Well Pump Motor Control
1. Each motor shall consist of a manually operated circuit protective device and a magnetically operated motor starter mounted in a common enclosure, complete with control power transformer and auxiliary devices for control of the circuit.
2. Operating handle of the circuit protective device shall physically indicate
"on", "off" and "tripped" positions. Handle shall accept three padlocks with heavy duty, industrial type shackles. Cover shall be interlocked with the operating handle to prevent opening when in the "on" position. A method shall be provided for releasing the interlock for inspection purposes when the switch is "on."
mailto:jim@masterlevel.com
3. Motor circuit protectors shall have adjustable magnetic trips by a single dial with a moveable plug stop. Circuit breakers shall be similar to motor circuit protector with thermal magnetic trip units. Minimum fault interrupting capability, where not shown otherwise, shall be 65,000 amperes.
4. Starters shall be NEMA rated and no smaller than Size 1. Each shall be equipped with an overload element in each phase and auxiliary contacts as indicated on the Drawings, with a minimum of two N.O. auxiliary contacts. Control power shall be fused, 120 volts, derived from either the secondary of a control power transformer or in 120/208 volt power systems supplied by one phase and the neutral. Control power transformer, if supplied, shall have sufficient capacity for all devices connected to the control circuit and not less than 50 VA more than the Normal capacity required to operate the starter. Provide push buttons, selector switches, and indicating lights.
5. Nameplates: Provide an engraved plastic nameplate for each combination starter identifying the motorized equipment it controls.
6. An externally operable manual "reset" button shall be provided.
Automatic restart after overload shall not occur.
7. Provide Allen Bradely bulletin 513, Cutler-Hammer Type A216, Square D or Equal.
B. CONTROL WIRING16 or 18 AWG MTW or THWN stranded.
1. THWN outside building
2. Color-coded by function
3. Conforms with the NEC, state, local and NEMA electrical standards
4. U.L. rated 600 volt, 75° C.
C. SELECTOR SWITCHES
1. Manufacturer: Square D 9001 KS88B, or equal.
2. Hand-Off-Auto, 3-position, door-mounted, oil tight, heavy duty.
3. Factory “Hand-Off-Auto” labeling.
D. SYSTEM ENCLOSURE
1. NEMA 12 steel cabinet wall-mounted inside Pump House.
2. NEMA 4X for outside installation.
3. Manufacturer: Hoffman or equal.
4. 14 gauge, cold-rolled steel minimum
5. 1/8” 6061T aluminum back plate for mounting internal components.
6. Flush mounted control, indication, and reset mechanisms.
7. Mechanical interlock to ensure panel is de-energized before the enclosure door can be opened.
PART 3 EXECUTION
3.1 PREPARATION
A. Identify existing electrical connections
B. Identify existing mechanical connections
3.2 ENCLOSURES
A. Mount on pre-cast Treatment wall in location shown on drawings, or Owner approved alternate location.
B. Flush mounted control, indicating, and reset mechanisms shall be installed on door face and shall be capable of operating with the door closed.
C. Location of items to be mounted on the enclosure door shall be as shown in the drawings and approved submittals.
3.3 WIRING
A. Neatly route wiring through plastic raceways to provide maximum accessibility and non-interference with working components.
B. Wire bundles to devices on the enclosure door shall have a tyrap affixed to the interior and to the frame on each side of the hinge and shall be provided with nylon or equal spiral wrapping. Wire bundles to door mounted devices will be twisted and run parallel to the axis of the hinge to provide a minimum of bending and flexing of the conductors.
C. Provide terminal block for all connections. Label terminal blocks with identifying numbers corresponding to wire numbers.
3.4 PUMP MOTOR PROTECTION DEVICE
A. Install in the MCP panel, mounted on the control panel door to indicate when the protection device has been activated.
3.5 PROCESS CONTROL SYSTEM
A. Mount the process control panel in the pumphouse at the location indicated in the drawings.
B. Control circuit shall be 120V AC. Do not install wires with voltages exceeding
120V within the main enclosure. Install all 230V or higher voltage motor starters, power wires and power/phase monitor relays in the MCP enclosures.
C. Clearly label all electronic components inside enclosure with bakelite labels, and all wires and terminals with pre-printed numerical labels to match drawing designations.
D. Flow switch shall de-energize the pump and chemical feed system after 1 minute of no flow condition is observed.
3.6 START-UP SERVICES
A. The services of a factory trained, qualified service representative of the system manufacturer shall be provided to inspect equipment installation to insure that it is installed in accordance with the manufacturer’s recommendations. The service representative shall make all adjustments necessary to place the system into operation and instruct operating personnel in the proper care and operation of the equipment furnished.
B. Prior to the service representative’s arrival on the job site, the Contractor shall fully install the equipment provided under this contract. The Contractor shall provide written notice to the system manufacturer once installation is completed.
3.7 WARRANTY
A. System manufacturer shall guarantee that the materials, and/or workmanship of the equipment be free from defects for a period of one year from date of startup, providing the equipment has been operated and maintained in accordance with the manufacturer’s recommendations.
B. System manufacturer shall replace or repair any part or parts found defective during this warranty period due to failures caused by reasons other than misuse, ordinary wear and tear, or unforeseen causes or conditions.