Amend__1_(section_C.1).pdf
PDF 95 KB Posted
- Attached to
- Construction of a Water Well
- Solicitation number
- 13-235-SOL-00005
About this file
Solicitation Amendment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend__4.pdf | ||
| Amend__3.pdf | ||
| Amend__2.pdf | ||
| Attach__2_F_ _M_Goals.pdf | ||
| SF_1442.pdf | ||
| Attach__4_Exhibits.pdf | ||
| Solicitation_Body.pdf | ||
| Attach__1_Wages.pdf | ||
| Attach__3_Submittals.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
13-235-SOL-00005
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sacramento CA 95814 650 Capitol Mall, Suite 7-100 John E Moss Federal Bldg California Office of the Director
CA 11-M6203/21/2013000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/21/2013
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment makes the following change to the scope of work in section C.1.
From:
The work to be done under this contract consists of construction of a new pump house building on structural fill to house water treatment equipment, a new water transmission line to connect the pump house to the upper storage tank, treatment equipment, booster pumps, aeration tank, controls and telemetry system, water service lines, miscellaneous piping and other required appurtenances in accordance with the attached drawings and specifications.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
HARRY J. WEISS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Electronically Signed 03/20/2013
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
13-235-SOL-00005/000001
To:
The work to be done under this contract consists of all work associated with construction of a new water well including; Installing a community well, pump and water quality testing, aquifer testing, geophysical logging, pump, motor, drop pipe, cables, electrical, piping, well enclosure system, well protection, water main connection, and miscellaneous piping and other required appurtenances in accordance with the attached drawings and specifications.
The attached page replaces page 6 of the solicitation package.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
13-235-SOL-00005 Page 6 of 73
SECTION C
SPECIAL PROVISIONS
C.1 SCOPE OF WORK
The work to be done under this contract consists of all work associated with construction of a new water well including; Installing a community well, pump and water quality testing, aquifer testing, geophysical logging, pump, motor, drop pipe, cables, electrical, piping, well enclosure system, well protection, water main connection, and miscellaneous piping and other required appurtenances in accordance with the attached drawings and specifications.
C.2 SITE CONDITIONS
The Contractor shall determine actual site conditions with regard to surface vegetation and other miscellaneous obstacles to construction. The Contractor shall perform, at no additional cost, all necessary clearing, grubbing, and disposal of these and other obstacles in order to do work required by the contract.
Locations, materials, and sizes of any utilities shown are approximate only and are not meant to be a complete representation of all utilities actually present. The Contractor shall determine exact locations and details from the responsible utility authority.
C.3 CONTRACT DOCUMENTS
A maximum of 5 sets of contract drawings and specifications will be furnished without charge to the Contractor at award of this contract, except applicable publications incorporated by reference which will be furnished on request at the cost of reproduction.
C.4 DAYS OF WORK
Construction work shall not be normally permitted on Saturdays, Sundays, or Federal holidays.
The Contractor may submit a written request to the Project Engineer for permission to work on any Saturday, Sunday, or Federal holiday. Written approval from the Contracting Officer must be obtained before the Contractor may work on any such day.
C.5 LAWS AND PERMITS AFFECTING WORK
The Contractor shall at all times observe and comply with Federal, State, City, and County laws, Tribal ordinances and regulations which in any manner affect the conduct of the work; and all such orders and decrees as exist at the present and which may be enacted later by legislative bodies or tribunals having legal jurisdiction or authority over the work. All other required permits, certificates and licenses shall be obtained by and at the expense of the Contractor. No
13-235-SOL-00005 Page 6 of 73
Michael.Hodahkwen Highlight
| Amend #1 (section C.1) |
| Amend #1 attachment |
File details come from the government source that posted it. Updated .